RECOVERY - PROJECT NUMBER- 10542, Navigation Improvements, Akutan Alaska
Award Notice Posted
- Solicitation number
- W911KB-10-R-0001
- Agency
-
ENDIST Alaska
US Army Corps of Engineers, Department of Defense
- Awarded
- to Knik Construction Co., Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- W911KB-10-C-0008 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
9 versions
Update #9 · Latest ·
Amendment 0003 is issued.
Update #8 ·
Amendment 0002 is issued
Update #7 ·
Amendment 0001 is issued
Update #6 ·
RECOVERY - PROJECT NUMBER 10542
Akutan Navigation Improvements Pre-Proposal Conference Notification to be held on:
The Pre-Proposal Conference will be held January 5, 2010.
The conference will start at 9:00 A.M. Alaska Time
Participants will meet at:
Denali Commission, 510 L St, Suite 410, Anchorage, AK
Located in the Peterson Tower, 4th Floor at the corner 5th and L street.
There is visitor parking at 7th and L listed as Denali Commission Guests
You may call in and participate in the conference via telephone using information below.
Dial: 1-877-784-3237
Participant pass code: 59054
Update #5 ·
RECOVERY - PROJECT #10542 Navigation Improvements, Akutan, Alaska
This project will be funded through the American Recovery and Reinvestment Act of 2009.
Pre-Solicitation Notice
Request for Proposal in electronic format only will be available for download on or about December 15, 2009 at www.fbo.gov. No disks shall be mailed. Any resulting contract will be firm-fixed priced. The North American Industrial Classification System code is 237990, which has a size standard of $33.5 million in average annual receipts. The solicitation shall be issued on a competitive request for proposal basis. The requirement for the submission of both performance and payment bonds, in an amount equivalent to 100% of the award price shall be applicable. Therefore, the successful firm shall have the capability to acquire such bonding. The Davis-Bacon Act will apply. Offerors are advised that a contract resulting from this solicitation is contingent upon Congressional approval. The government shall not be responsible for proposal preparation costs in the event the solicitation is canceled. If a large business is selected for this contract, the firm must comply with FAR 52.219-9 regarding the requirements for a subcontracting plan for that part of the work it intends to subcontract. The FY09 subcontracting goals for this contract are a minimum of 32.0% of the contractor's intended subcontract amount be placed with small businesses, 18.0% of that to small disadvantaged businesses, 5.8% to woman-owned small businesses, 3.0% to service disabled veteran-owned small business and 10.0% to HUB zone small businesses and 13.O% to HBCU/MI. The Davis-Bacon Act will apply. All responders are advised that this project may be canceled or revised at any time during the solicitation, selection, evaluation, negotiation and final award. All contractors are advised that they must be registered in CCR and ORCA (http://orca.bpn.gov). Joint ventures must also be registered in CCR and ORCA as a joint venture. We advise contractors begin this process when they prepare their proposal in order to ensure this registration is in place should they be selected for the award. (Reference DFAR 252.204-7004 Alternate A, Central Contractor Registration).
Description of Work:
RECOVERY- PROJECT #10542, Navigation Improvements, Akutan, Alaska
Description of Work: The Base and Option work includes construction of a mooring basin, the breakwaters, and an entrance channel. Work for the Base and Options includes: obtaining, delivering, and placing about 29,000 CY of Core Rock, 14,000 CY of "B" Rock and 17,000CY of armor rock for the breakwaters; excavating/dredging 960,000CY of material for the entrance channel and mooring basin; stockpiling on site 960,000CY of material including stabilizing, top soil and seeding; and obtaining, delivering and placing 11,000 CY of filter rock and 14,000CY of slope protection on the mooring basin side slopes. There is no government furnished rock source for this project. The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items necessary to accomplish the work. Some work features will be separately awardable options.
Update #4 ·
ATTACHED ARE DRAFT SPECIFICATIONS AND DRAWINGS FOR REVIEW AND COMMENT DURING THE PRE-SOLICITATION CONFERENCE
Update #3 ·
The purpose of this modification/amendment is to provide the Conference Details.
Pre-Soliciation Conference
RECOVERY - PROJECT NUMBER 10542. Navigation Improvements, Akutan Alaska
This project will be funded through the American Recovery and Reinvestment Act of 2009.
The Pre-Solicitation Conference will be held at the following location.
Denali Commission
510 L St
Anchorage, AK 99501-1956
(907) 271-1414
The meeting time is 9:00a.m. until 11:00a.m. on November 30,2009.
The Pre-Solicitation Conference will also be held via teleconference. To access the conference:
Dial: 1-888-947-9962
Participant pass code: 21995
The conference will start at 9:00am Alaska Time.
Update #2 ·
Pre-Soliciation Conference
RECOVERY - PROJECT NUMBER 10542. Navigation Improvements, Akutan Alaska
This project will be funded through the American Recovery and Reinvestment Act of 2009.
The Pre-Solicitation Conference will be held at the following location.
Denali Commission
510 L St
Anchorage, AK 99501-1956
(907) 271-1414
The meeting time is 9:00a.m. until 11:00a.m. on November 30,2009.
The purpose of the conference is to allow interested offerors to provide comments on the solicitation. The draft solicitation including plans and specifications will be made available on this site on or about November 20, 2009.
Note: This project was previously solicited under W911KB-09-R-0038
Description of Work: The work includes construction of breakwaters, an entrance channel and mooring basin. Work includes: obtaining, delivering, and placing about 22,700CY of Core Rock, 11,800CY of "B" Rock and 20,000CY of "A" rock for the breakwaters; excavating/dredging 960,000CY of material for the entrance channel and mooring basin; stockpiling on site 960,000CY of material including stabilizing, top soil and seeding; and obtaining, delivering and placing 10,000CY of filter rock and 15,700CY of rip rap on the mooring basin side slopes. There is no government furnished rock source for this project. The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items necessary to accomplish the work.
The purpose of this modification is to correct the PROJECT NUMBER to 10542
Update #1 ·
Pre-Soliciation Conference
RECOVERY - PROJECT 102438. Navigation Improvements, Akutan Alaska
This project will be funded through the American Recovery and Reinvestment Act of 2009.
The Pre-Solicitation Conference will be held at the following location.
Denali Commission
510 L St
Anchorage, AK 99501-1956
(907) 271-1414
The meeting time is 9:00a.m. until 11:00a.m. on November 30,2009.
The purpose of the conference is to allow interested offerors to provide comments on the solicitation. The draft solicitation including plans and specifications will be made available on this site on or about November 20, 2009.
Note: This project was previously solicited under W911KB-09-R-0038
Description of Work: The work includes construction of breakwaters, an entrance channel and mooring basin. Work includes: obtaining, delivering, and placing about 22,700CY of Core Rock, 11,800CY of "B" Rock and 20,000CY of "A" rock for the breakwaters; excavating/dredging 960,000CY of material for the entrance channel and mooring basin; stockpiling on site 960,000CY of material including stabilizing, top soil and seeding; and obtaining, delivering and placing 10,000CY of filter rock and 15,700CY of rip rap on the mooring basin side slopes. There is no government furnished rock source for this project. The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items necessary to accomplish the work.
Files
| File | Type | Posted |
|---|---|---|
| W911KB-10-R-0001-0003.pdf | ||
| W911KB-10-R-0001-0002.pdf | ||
| Amend 0001 Spec Changes.pdf | ||
| Amend 0001 Drawings.pdf | ||
| W911KB-10-R-0001-0001.pdf | ||
| Amend 0001 Drawings.dwf | DWF file | |
| 10R0001 Drawings.pdf | ||
| 10R0001 Drawings.zip | ZIP file | |
| Topographic Hydrographic Survey.dwg | DWG drawing | |
| 10R0001 Sol and Specs.pdf | ||
| Presolicitation Meeting Minutes.pdf | ||
| Attch 1 Presolicitation Conference Transcript 30 Nov 09.pdf | ||
| Dwgs-AKU002-ITR.pdf | ||
| Specs-AKU002-ITR.pdf |