Specs-AKU002-ITR.pdf
PDF 28 MB Posted
- Solicitation number
- W911KB-10-R-0001
About this file
DRAFT SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-10-R-0001-0003.pdf | ||
| W911KB-10-R-0001-0002.pdf | ||
| Amend 0001 Spec Changes.pdf | ||
| Amend 0001 Drawings.dwf | DWF file | |
| Amend 0001 Drawings.pdf | ||
| W911KB-10-R-0001-0001.pdf | ||
| 10R0001 Drawings.pdf | ||
| 10R0001 Drawings.zip | ZIP file | |
| Topographic Hydrographic Survey.dwg | DWG drawing | |
| 10R0001 Sol and Specs.pdf | ||
| Presolicitation Meeting Minutes.pdf | ||
| Attch 1 Presolicitation Conference Transcript 30 Nov 09.pdf | ||
| Dwgs-AKU002-ITR.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INV. NO. W911KB-10-R-0001
ITR DOCUMENTS
NAVIGATION IMPROVEMENTS
AKUTAN, ALASKA
SOLICITATION, OFFER, AND AWARD
SUPPLIES OR SERVICES AND PRICE/COSTS
CONSTRUCTION SPECIFICATIONS/STATEMENT OF WORK
INSPECTION AND ACCEPTANCE
SPECIAL CONTRACT REQUIREMENTS
CONTRACT CLAUSES
LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF BIDDERS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
EVALUATION FACTORS FOR AWARD
12 NOV 2009
U.S. ARMY ENGINEER DISTRICT, ALASKA
CORPS OF ENGINEERS
P.O. BOX 6898
ELMENDORF AFB, ALASKA 99506-0898
INCREASE PROFIT SUBMIT VE CHANGES
DRAFT
THIS PAGE INTENTIONALLY LEFT BLANK.
Navigation Improvements, Akutan, Alaska
Description of Work: The w ork includes construction of breakw aters, an entrance channel and mooring basin. Work includes: obtaining, delivering, and placing about 22,700CY of Core Rock, 11,800CY of “B” Rock and 20,000CY of “A” rock for the breakw aters;
excavating/dredging 960,000CY of material for the entrance channel and mooring basin; stockpiling on site 960,000CY of material including stabilizing, top soil and seeding; and obtaining, delivering and placing 10,000CY of f ilter rock and 15,700CY of rip rap on the mooring basin side slopes. There is no government furnished rock source for this project. The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items necessary to accomplish the w ork.
YOLANDA M IKNER 907-753-2553
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED (RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________465 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________5 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________01 Dec 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
ELMENDORF AFB AK 99506-0898
W911KB
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour) Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W911KB-10-R-0001 74
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W911KB-10-R-0001
Section 00 11 00 - STANDARD FORM (SF) 1442
! ! ! C A U T I O N T O O F F E R O R S ! ! !
1. BUSINESS HOURS: For the Alaska District Corps of Engineers is from 7:30 A.M. to 4:00 P.M., Monday through Friday.
2. SUBMIT PROPOSALS: To deliver proposals to the US Army Corps of Engineers, 2204 Third St, Elmendorf AFB, Alaska, you will need to submit a request for a base pass 48 hours prior to proposal due date (See Section 00100 for additional instructions). Hand deliveries to the Alaska District, you will need call extension 753-2525 or 753-2545 in advance to arrange for pick-up. Be advised there is limited telephone service in the lobby. Please be sure to submit proposals by the time specified on Standard Form 1442, Block 13-A. Any bids received after the specified time will not be accepted.
3. VISITORS TO ELMENDORF AFB: ***NOTE: BE ADVISED THAT DUE TO BASE SECURITY
MEASURES, YOU WILL NEED EXTRA TIME TO PROCESS THROUGH BONIFACE GATE. You are required to have the following to obtain a base pass: current Anchorage emissions control inspection certificate, driver’s license, DOD ID card (if applicable), proof of insurance, Alaska vehicle registration and Contracting Division point of contact/telephone number.
4. AMENDMENTS: Have you acknowledge receipt of ALL amendments? If in doubt as to the number of amendments issued, please contact our office, (907)753-2545 or (907)753-2553. SEE SECTION 0021 00 FOR
ADDITIONAL INFORMATION REGARDING AMENDMENTS.
5. AMENDED PROPOSAL PAGES: If any of the amendments furnished amended proposal pages, the amended pages must be used in submitting your proposals.
6. OFFER GUARANTEE: An Offer Guarantee is not required. Instead of submitting an Offer Guarantee, offerors are to submit a letter from their bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.
7. MISTAKE IN PROPOSAL: Have you reviewed your proposal price for possible errors in calculation or work left out?
8. OFFER ACCEPTANCE PERIOD: The minimum OFFER acceptance period is specified in Block 13D of the Standard Form 1442, Solicitation, Offer and Award. Please ensure that you allow at least the stated number of calendar days for the Government to accept your proposal.
9. WEB-SITE: The solicitation, specifications, drawings, lists of interested vendors, and amendments (if any) are available through the project links at the Federal Business Opportunity website at www.fbo.gov.
TABLE OF CONTENTS
SECTION 00 11 00 Solicitation Contract Form (SF 1442) Corporation, Partnership, Joint Venture, or LLC Certificates Pre-Award Questionnaire
SECTION 00 21 00 Proposal Schedule/Instructions to Bidders
SECTION 00 22 11 Evaluation Factors for Award
SECTION 00 45 00 Representations and Certifications
SECTION 00 72 00 Contract Clauses
SECTION 00 73 46 Wage Rates
SECTION 00 73 00 Special Contract Requirements
DIVISION 01 General Requirements
01 11 00 Summary of Work
01 19 40.00 29 Special Items (Civil Works)
01 22 00.00 10 Measurement and Payment
01 32 01.00 10 Project Schedule
01 33 00 Submittal Procedures
01 35 26 Governmental Safety Requirements
01 42 00 Sources For Reference Publications
01 45 01.10 USACE Quality Control System (QCS)
01 45 04.00 29 Contractor Quality Control
01 50 00 Temporary Construction Facilities and Controls
01 57 20.00 10 Environmental Protection
01 57 34.00 29 Storm Water Pollution Prevention Measures
01 58 19.00 29 Project Marker
01 78 00 Closeout Submittals
DIVISION 02 Existing Conditions
02 61 13 Excavation and Handling of Contaminated Material
DIVISION 31 - EARTHWORK
31 03 00.00 29 Earthwork for Vehicle Traffic Areas, Sidewalkls, Curbs and Gutters, and Area Grading
31 05 19 Geotextile
31 09 20.00 29 Field Screen Testing of Soils for POL Contamination
31 23 00.00 20 Excavation and Fill
DIVISION 32 EXTERIOR IMPROVEMENTS
32 92 19 Seeding
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 Stone, Channel, Shoreline/Coastal Protection For Structures
---End of Project Table of Contents---
If the offer is submitted by a corporation, partnership, Joint Venture or an LLC, the applicable form listed must be completed. In the alternative, other evidence must be submitted to substantiate the authority of the person signing the offer. If a corporation, the same officer shall not execute both the offer and the certificate.
CERTIFICATE
Corporation
I, ________________________________, certify that I am __________________ of the corporation named as
Contractor herein, that __________________________ who signed this contract on behalf of the Contractor was then
__________________________ of said governing body and is within the scope of its corporate powers.
CORPORATE SEAL SIGNED: _______________________________
CERTIFICATE
Limited Liability Company (LLC)
I, __________________________, certify that I am the ____________________ of the LLC named as
Offeror/Contractor herein; that __________________________ who signed this offer/contract on behalf of the
Offeror/Contractor was then __________________________ of said LLC; that said offer/contract was duly signed for and on behalf of said LLC by authority of its governing body, and is within the scope of its corporate powers.
SIGNED:
Name:
Title:
SIGNED:
Name:
Title:
AUTHORITY TO BIND PARTNERSHIP
This is to certify that the names and signatures of all partners are listed below and that the person signing the offer had authority to actually bind the partnership pursuant to its partnership agreement. Each of the partners individually has full authority to enter into and execute contractual instruments, on behalf of said partnership, with the United States of America, except as follows: (State "none" or describe limitations, if any.)
This authority shall remain in full force and effect until such time as the revocation of authority by any cause whatsoever has been furnished in writing to, and acknowledged by, the Contracting Officer.
(Type or Print Name) (Signature)
(Type or Print Name) (Signature)
JOINT VENTURE
I, __________________________, certify that I am the Secretary of the
Corporation named as Offeror/Contractor Herein, that __________________________ who signed this offer/contract on behalf of the Offeror/Contractor was then __________________________ of said corporation by authority of its governing body and is within the scope of its corporate powers. IN WITNESS WHEREOF, I have hereunto affixed my hand and the seal of said corporation this
____________ day of ____________
CORPORATE SEAL SIGNED: _______________________________
PRE-AWARD QUESTIONNAIRE
FIRM NAME, ADDRESS & TELEPHONE RFP No. W911KB-10-R-0001
CAGE Code:
TYPE OF BUSINESS:
Individual Partnership LLC Joint Venture
Corporation in the State of ______________________
SIZE: Small Large
LIST OF CORPORATION OFFICERS/PARTNERS BY NAME AND TITLE
YEARS EXPERIENCE in the field of proposed work (_________).
Also indicate similarity between work currently being produced and work required under subject invitation:
Financial Institution Ratings. Is your firm listed in:
a. Dun & Bradstreet: No Yes If yes, what is the rating?
b. Thomas Register: No Yes If yes, what is the rating?
Financial Ability: Please attach a certified current balance sheet and latest profit and loss statement signed by an officer of the company. The last financial statement will be acceptable if it is less than 6 months old.
Reputation and Integrity:
Name POC Telephone No.
Bank:
List all pending lawsuits or unsatisfied judgments against your firm, the nature of same and Court where filed or adjudicated. Lawsuits or judgments where full payment will be made or are covered by your insurance are not to be included.
List all pending contract claims. State nature of claim, amount, and approximate date filed.
Signed:____________________________________
Typed/Printed Name:____________________________________
Title:____________________________________
Date:_________________
PROPOSAL SCHEDULE
AKUTAN HARBOR
AKUTAN, ALASKA
BASE ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price
Amount
0001 ARRA Mobilization and Demobilization, complete.
1 LS $__________ $__________
0002 ARRA Construct Access Road Fill, complete 30,000 CY $__________ $__________
0003 ARRA Construct Surface Course, complete 1,400 CY $__________ $__________
0004 ARRA Excavation, complete 960,000 $__________ $__________
0005 ARRA Construct Harbor Slope Protection, rock complete
15,700 $__________ $__________
0006 ARRA Construct Harbor Filter rock, complete 10,000 CY $__________ $__________
0007 ARRA Construct Breakwater Core rock, complete.
22,700 CY $__________ $__________
0008 ARRA Construct Breakwater B rock, complete 11,800 CY $__________ $__________
0009 ARRA Construct Breakwater Armor rock, complete
20,000 CY $__________ $__________
0010 ARRA Seeding, complete 80,000 SY $__________ $__________
0011 ARRA Excavate Potentially Contaminated Soils with Debris complete.
1,000 CY $__________ $__________
0012 ARRA Dispose of Contaminated Soil 100 CY $__________ $__________
Total of Items 0001 thru 0012 $__________
0013 ARRA Optional Item for Partnering $__________
Optional Items
0014 ARRA Optional Item Construct Drainage Diversion, complete
1 LS $__________ $__________
0015 Excavate Potentially Contaminated Soil, complete
500 CY $__________ $__________
0016 Dispose of Contaminated Soil, complete 50 CY $__________ $__________
Total of Items 0013 thru 0016 $__________
Total of base and option items 0001-0016 $__________
EVALUTIONS OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 11
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA AND BASIS FOR AWARD.
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.
-- END OF PROPOSAL SCHEDULE
Section 00 21 00 - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
CLAUSES INCORPORATED BY REFERENCE
52.215-1 Alt II Instructions to Offerors--Competitive Acquisition (Jan 2004) -
Alternate II
OCT 1997
CLAUSES INCORPORATED BY FULL TEXT
52.204-6 DATA UNIVERSAL NUMBERING SYSTEM (DUNS) NUMBER (APR 2008)
(a) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS+4” followed by the DUNS number or “DUNS+4” that identifies the offeror's name and address exactly as stated in the offer. The DUNS number is a nine-digit number assigned by Dun and Bradstreet, Inc. The DUNS+4 is the DUNS number plus a 4-character suffix that may be assigned at the discretion of the offeror to establish additional CCR records for identifying alternative Electronic Funds Transfer (EFT) accounts (see Subpart 32.11) for the same concern.
(b) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.
(1) An offeror may obtain a DUNS number--
(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or
(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
(2) The offeror should be prepared to provide the following information:
(i) Company legal business name.
(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.
(iii) Company physical street address, city, state and Zip Code.
(iv) Company mailing address, city, state and Zip Code (if separate from physical).
(v) Company telephone number.
(vi) Date the company was started.
(vii) Number of employees at your location.
(viii) Chief executive officer/key manager.
(ix) Line of business (industry).
(x) Company Headquarters name and address (reporting relationship within your entity).
(End of provision)
52.215-5 FACSIMILE PROPOSALS (OCT 1997)
(a) Definition. Facsimile proposal, as used in this provision, means a proposal, revision or modification of a proposal, or withdrawal of a proposal that is transmitted to and received by the Government via facsimile machine.
(b) Offerors may submit facsimile proposals as responses to this solicitation. Facsimile proposals are subject to the same rules as paper proposals.
(c) The telephone number of receiving facsimile equipment is: 907-753-2544.
(d) If any portion of a facsimile proposal received by the Contracting Officer is unreadable to the degree that conformance to the essential requirements of the solicitation cannot be ascertained from the document--
(1) The Contracting Officer immediately shall notify the offeror and permit the offeror to resubmit the proposal;
(2) The method and time for resubmission shall be prescribed by the Contracting Officer after consultation with the offeror; and
(3) The resubmission shall be considered as if it were received at the date and time of the original unreadable submission for the purpose of determining timeliness, provided the offeror complies with the time and format requirements for resubmission prescribed by the Contracting Officer.
The Government reserves the right to make award solely on the facsimile proposal. However, if requested to do so by the Contracting Officer, the apparently successful offeror promptly shall submit the complete original signed proposal.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
52.222-24 PREAWARD ON-SITE EQUAL OPPORTUNITY COMPLIANCE EVALUATION (FEB 1999)
If a contract in the amount of $10 million or more will result from this solicitation, the prospective Contractor and its known first-tier subcontractors with anticipated subcontracts of $10 million or more shall be subject to a preaward compliance evaluation by the Office of Federal Contract Compliance Programs (OFCCP), unless, within the preceding 24 months, OFCCP has conducted an evaluation and found the prospective Contractor and subcontractors to be in compliance with Executive Order 11246.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Julie Anderson Address: 2204 3rd Street Elmendorf AFB AK 99506 Telephone 907-753-5685
Section 00 21 00 - Instructions To Offerors and SECTION 00 22 10 - Evaluation Factors for Award
Part 1: GENERAL INFORMATION
1. MAGNITUDE
The magnitude of this project is between $10,000,000 and $25,000,000.
2. SOLICITATION
The solicitation in electronic format only will be available for download at www.fbo.gov Reference synopsis for download instructions.
3. BOND AMOUNT REQUIRED
a. Performance and Payment Bonds:
(1) The penal amount of the bonds shall be 100 percent of the original price.
(2) The Government may require additional bond protection when a contract price is increased. The increase in protection shall generally equal 100 percent of the increase in contract price. The Government may secure additional protection by directing the contractor to increase the penal amount of the existing bond or obtain an additional bond.
b. Offer Guarantee: An Offer Guarantee is not required. Instead of submitting an Offer Guarantee, offerors are to submit a letter from their bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.
4. SURETY REQUIREMENTS
a. Corporate Sureties - Corporate sureties for performance, and payment bonds must appear on the list contained in Department of the Treasury's Listing of Approved Sureties (Department Circular
570) located at the following website:
http://www.fms.treas.gov/c570/c570.html#certified
Other requirements for corporate sureties are contained in FAR 28.202.
b. Individual Sureties - If individual sureties are used for bond obligations, they must meet the requirements under FAR 28.203.
5. INQUIRIES
All inquiries must be submitted in writing. Prospective Offerors may submit all inquires regarding this solicitation to:
U.S. Army Engineer District, Alaska
CEPOA-CT-SP
Attn: Christine A. Dale, Contracting Officer PO Box 6898, Elmendorf AFB, Alaska 99506-6898
Phone: (907) 753-5618 or faxed to (907) 753-2544.
Questions may also be emailed to yolanda.m.ikner@usace.army.mil or christine.a.dale@usace.army.mil.
6. VISITORS TO THE ARMY AND AIR FORCE BASES
All vehicle operators are required to wear seatbelts. Vehicle operators caught not wearing seatbelts will lose their driving privileges for 10 days on their first offense, 30 days on the second offense, and 6 months or longer on the third offense. In addition cell phone use while operating a vehicle is prohibited on Elmendorf AFB.
Please note that base entry procedures have changed. Offerors are now required to be physically sponsored on Elmendorf AFB by Contracting Division personnel.
If a firm does not have a current pass to obtain entry to Elmendorf AFB, the firm may request a day pass using the following procedures:
VISITORS TO ELMENDORF AFB: ***NOTE: BE ADVISED THAT DUE TO BASE SECURITY
MEASURES, BASE ACCESS TO NON-DOD PERSONNEL IS LIMITED AND RESTRICTED AND
REQUIRES YOU TO PLAN FOR EXTRA TIME TO PROCESS THROUGH THE BONIFACE GATE.
You are required to have the following to obtain a base pass: current Anchorage emissions control inspection certificate, driver's license, DOD ID card (if applicable), proof of insurance, Alaska vehicle registration and Contracting Division point of contact/telephone number. In addition, contractor must submit a request for pass at least 48 hours prior to desired date and time of base entry. For a day pass request, please contact Yolanda Ikner at 753-2553 or e-mail request to yolanda.m.ikner@usace.army.mil.
Failure to follow the above procedure will prevent your access to Elmendorf AFB.
7. FACSIMILE PROPOSALS
Facsimile and/or email proposals will only be accepted for Volume II – Pro Forma Requirements and Price Proposal ONLY. Offerors shall submit Volume I – Technical Proposal via hardcopy in accordance with the instructions below in this section. Offerors are reminded that FAR Clause 52.215-5 – Facsimile Proposals (Oct 1997) will apply to any portion faxed or emailed.
8. PRE-PROPOSAL MEETING/SITE VISIT
Please reference 52.236-27 – Site Visit (Construction) (Feb 1995) Alternate I (Feb 1995), for site visit information.
9. PRE-AWARD SURVEYS
The Government reserves the right to conduct a pre-award survey of any firm under consideration to confirm any part of the information furnished by the offeror, or to require other evidence of managerial, financial, technical, and other capabilities, the positive establishment of which is determined by the Government to be necessary for the successful performance of the contract. As a minimum the offeror is required to supply those items listed in the Pre-Award Questionnaire following the Proposal Schedule.
10. EXCLUSION OF DEBARRED AND SUSPENDED CONTRACTORS
By entering into this contract, the Contractor certifies that neither it, nor any person or firm who has an interest in the Contractor's firm, is a person, or firm ineligible to be awarded Government contracts by virtue of being suspended or debarred in accordance with FAR subpart 9.4.
Part II: METHOD OF PROCUREMENT
1. The U.S. Army Corps of Engineers, Alaska District, intends to solicit this requirement using the source selection procedures in accordance with the provisions set forth in this Request for Proposal (RFP). A firm fixed price construction contract will be awarded to the offeror who submits a proposal with the lowest evaluated price meeting or exceeding the acceptability standards for non-cost factors. The evaluated price shall include cost associated with all required and optional itmes shown in the proposal schedule.
A. The evaluation factors and significant subfactors that establish the requirements of acceptability shall be set forth in the solicitation.
B. Tradeoffs are not permitted.
C. Proposals are evaluated for acceptability but not ranked using the non-cost/price factors.
D. Past Performance shall be evaluated in accordance with 15.305. However, the comparative assessment in 15.305(a)(2)(i) does not apply.
E. Exchanges may occur (see 15.306).
2. In accordance with FAR 52.215-1, Para. (f)(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)).
Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint.
Part III: PROPOSAL SUBMITTAL REQUIREMENTS http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm#P275_41714#P275_41714 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm#P275_41714#P275_41714 http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/15.htm#P291_46352#P291_46352
1. This section of the RFP provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The offeror’s proposal must include all data and information required by the RFP and must be submitted in accordance with these instructions. Non-conformance with the specific proposal content and format stated in the RFP may result in rejection of the proposal.
2. Submit your proposal packages to the Corps of Engineers at the address shown in Paragraph 5. above.
3. The Government must receive your proposal no later than the time and date specified in Block 13 of
Standard Form 1442.
4. Submit your proposal in two volumes:
A) Volume I shall contain the Technical Proposal comprised of three sections labeled Experience, Past Performance, and Understanding the Requirements. Volume I shall contain no cost or price information. The goal of this Volume to be 3 pages in length and the maximum is 6 pages.
B) Volume II shall contain the Pro Forma Requirements and Price Proposal (price proposal and information, representations/certifications).
C) Both volumes shall be in 8 ½ by 11-inch format. Graphs and drawings may be presented in fold out pages up to 11 by 17-inch format.
5. Each volume shall indicate the title, volume number, RFP number, and name and address of offeror. Each page of the proposal shall be numbered.
6. Provide an original and five copies of Volume I Provide an original and one copy of Volume II.
7. Offerors shall submit with their proposals a list of the names and telephone numbers of persons authorized to conduct negotiations.
I. INITIAL PROPOSAL COMPLIANCE
1. ARITHMETIC DISCREPANCIES
For the purpose of initial evaluation of proposals, the following will be utilized in resolving arithmetic discrepancies found on the face of the proposal schedule as submitted by offerors:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between unit price and extended price, the unit price will govern;
c. Apparent errors in extension of unit price will be corrected;
d. Apparent errors in addition of lump-sum and extended price will be corrected.
e. For the purpose of proposal evaluation, the government will proceed on assumption that the offeror intends his proposal to be evaluated on the basis of the unit prices, extensions, and totals arrived at by resolution of arithmetic discrepancies as provided above and the proposals will be so reflected on the abstract.
II. FACTORS FOR EVALUATION
Volume I – Technical Proposal
A. Experience B. Past performance C. Understanding of the Requirement
VOLUME II – PRO FORMA REQUIREMENTS AND PRICE PROPOSAL
A. Standard Form 1442 B. Proposal Schedule/Price Information. Include Corporate Certificate C. Section 00600, Representations and Certifications D. Pre-award Survey/Bank Reference E. Letter from their bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.
The Government will evaluate those factors as follows:
VOLUME I – TECHNICAL PROPOSAL
The technical proposal shall be organized sequentially under tabs to facilitate evaluation, and shall include the following:
TAB A - EXPERIENCE
A) Relevant experience shall be submitted by describing the following: project name, location, owner’s name and phone number, work performed by offeror, contract amount, performance period dates, safety record, key subcontractors and their roles, and explain any performance issues.
B) OFFEROR (PRIME CONTRACTOR): Provide examples of projects (government or commercial at least 75% complete) for the past ten (10) years. Provide projects accomplished by prime only, subcontractor team member, or where prime and subcontractor worked together as a team; which are similar in size, complexity, scope, and magnitude. The projects should conclusively demonstrate the offeror’s ability to complete the work required under this RFP. In the case of joint ventures, past projects from any of the signatory firms are acceptable. For joint ventures, the offeror’s portion of participation in the past project(s) must be clearly identified.
C) The Government defines experience as learning by doing. The Government will evaluate the recency, relevance, depth, and breadth of an offeror’s experience, to include any joint ventures and subcontractors, on the basis of the offeror’s experience or subcontractor team members or where prime and subcontractor worked together as a team on projects that are similar in size, nature, scope, remoteness, and complexity to the work that will be required under the contract for which offers are solicited by this request for proposal.
D) Relevant experience will be ranked according the following criteria in descending order of importance:
1. Projects that included excavation between 300,000 CYs and 1,000,000 CYs of material.
2. Projects completed under difficult conditions including remote locations, limited site access (ie. no road access), required upland disposal of excavated material, and excavation in areas of shallow groundwater.
3. Projects (government or commercial at least 75% complete) for the past ten (10) years.
Recent projects (last 5 years) will be ranked more favorably than older projects.
TAB B – PAST PERFORMANCE
A) During the past performance evaluations, the Government reserves the right to look outside of the proposal for past performance information on the Offeror. The Government will consider information submitted by the Offeror, as well as any other relevant and reliable information obtained from any other source, including information from Government personnel and databases.
The government intends to use obtain past performance results from the CCASS/CPARS database.
TAB C – UNDERSTANDING OF REQUIREMENT
The offeror should prepare their proposal based on information provided in the solicitation documents, knowledge of the project area and/or similar past projects worked on. The proposal will be evaluated by comparing it to the specifications and the offeror's presented approach and methods described below in an Excavation/Dredging Plan.
Excavation/Dredging Plan. Submit an Excavation/Dredging Plan that describes the equipment to be used, method of construction, manpower required, subcontracting, and material sources to construct the revetment. - Offerors should pay particular attention to the following criteria in submitting their plan:
1. Execution strategy for the project.
2. Temporary construction features for excavation, transportation, and disposal of excavated material.
3. Dewatering procedures
4. Survey methods, verification of slopes, lines and grade.
5. Compliance with environmental requirements.
6. Revegetation of the disposal areas.
The Government will evaluate the offeror’s proposed plan to determine if the plan is consistent with the requirements in this RFP and on the suitability and reasonableness of the equipment and procedures described.
VOLUME II – PRO FORMA REQUIREMENTS AND PRICE PROPOSAL
The offeror shall submit in Volume II the price information described below to be evaluated. Volume II will not be point scored but will be subjectively evaluated to determine the reasonableness, affordability, and value of the price data. The following information shall be provided in the price proposal:
A. Standard Form 1442 signed by the Offeror with amendments acknowledged.
B. Proposal Schedule/Price Information. The price information supporting the Technical Proposal shall be in the form of the proposal schedule contained in the front of this solicitation. Include Corporate Certificate
C. Completed Section 00600, Representations and Certifications
D. Pre-award Survey/Bank Reference
E. Letter from their bonding company indicating the offerors ability to obtain performance and payment bonds in the amount of their proposal price.
F. Subcontracting Plan and Small Business Participation.
Note: This does not apply to Small Business Concerns. Offerors other than Small Businesses shall submit a subcontracting plan in accordance with FAR 52.219-9, Small Business Subcontracting Plan (Oct 2000), Section 00700. The Government will evaluate the proposed subcontracting plan separately in accordance with Army Federal Acquisition Regulation Supplement (AFARS) Appendix DD. This subcontracting plan shall separately addresses subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. If the offeror is submitting an individual contract plan, the plan must separately address subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns, with a separate part for the basic contract and separate parts for each option (if any). The plan shall be included in and made a part of the resultant contract. The subcontracting plan shall be negotiated within the time specified by the Contracting Officer. Failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract.
RELATIVE IMPORTANCE OF INDIVIDUAL EVALUATION FACTORS
Volume One (non-price)
The Government considers the non-price factors of Experience, Past Performance, and Understanding of Requirements to be of approximately equal importance.
Volume Two (price and pre-award requirements)
PRICE
The Government will perform a price analysis and evaluate each proposed price by comparing it against other proposed prices, the average of the offerors, the Government estimate. The government will also evaluate each line item as priced to ensure no individual item is priced unrealistically high or low.
Attachment A - SUBCONTRACTING PLAN
Small Business SUBCONTRACTING PLAN FORMAT
SUBCONTRACTING GOALS FY 2010 for Alaska District Contracts
Small Business 70.0%
Small Disadvantaged 6.2%
Woman-Owned Small Business 7.0%
HUBZone Small Business 9.8%
Veteran-Owned Small Business 3.0%
Service-Disabled Veteran-Owned Small Business 0.9%
1. SUBMIT YOUR PLAN IN THE ATTACHED FORMAT
2. Subcontracting Plans will be evaluated in accordance with FAR Clause 52.219-9 Alternate II and AFARS Appendix DD.
SUBCONTRACTING PLAN
In accordance with of Appendix DD
Army Federal Acquisition Supplement (AFARS)
FIRM:
PROJECT TITLE
CONTRACT SPECIALIST RESPONSIBLE FOR PRE-AWARD R. David Williams, (907) 753-5571
NAME OF OFFICE ADMINISTERING CONTRACT TO INCLUDE SUBCONTRACTING PLAN: (If more than one office, name all offices/responsible parties):
I. Dollar Amounts (If possible, DO NOT include indirect costs):
SEE ATTACHED TABLE 1
II. Percentage goals (expressed in terms of percentage of total planned subcontracting dollars).
SEE ATTACHED TABLE 2
1. State your firms policy statement or evidence of internal guidance to company buyers recognizing commitment to Pub. L. 99-661, Section 1207, and Pub.L. 100-180, Section 806. Describe special emphasis placed on subcontracting with SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran-Owned SB firms including HBCUs and MIs as a result of Pub.L.s.
2. Describe your firm's efforts to broaden SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran Owned SB, and Veteran-Owned SB active vendor base. (FAR 19.704(a), 52.219-9(d), DFARS Subpart 219.5, 219.704(a)(1),
219.705 and 252.219-7003). Specifically describe your efforts in increasing subcontracts to SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran-Owned SB firms for non-complex and general housekeeping supplies or services normally awarded to firms already in your firm's vendor base. Describe efforts to increase the number of SB and SDB sources awarded subcontracts. Describe established plans to use competition restricted to SDBs and give details about how your firm will accomplish this. (DFARS 219.705-4 and Subpart 219.5) Where appropriate include efforts to include HBCUs & MIs in your SDB goals.
3. Describe your firm’s "Outreach Efforts" to work with organizations to identify potential sources for items not traditionally awarded to SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran Owned SB, and Veteran- Owned SB firms. (FAR 19.704(a),19.705-4, 52.219-9(d) and 52.219-9(e), DFARS 219.705) Describe efforts to work with organizations in FAR 52.219-9(d)(11)(iv) to identify potential sources for items not traditionally awarded to SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran-Owned SB firms. (FAR 52.219-9(d)(11)(iv) and 52.219-9(e)). Your proposed plan to conduct reviews to determine the competence, ability, experience and capacity available in SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran-Owned SB firms and to provide them technical assistance.
4. Describe supplies and services to be subcontracted and planned for subcontracting to SBs, SDBs, WOSBs , HUBZone SB, Service Disable Veteran-Owned SB, and Veteran-Owned SB firms. (FAR 19.705-4(d), 52.219- 9(d)(3), 52.219-9(e) and DFARS 219.705) Indicate intent to review major product/system components and key project elements of R&D, construction, service and spare parts contracts for subcontracting to each of the above elements. (FAR 19.705-4(d)(3) and (4), 52.219-9(e)(1) and (2) and DFARS 219.705) Specifically describe how your plan targets specific SBs, SDBs, WOSBs, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran- Owned SB for review to determine their competence, ability, experience and capacity and identifies specific components or major portions of the acquisition for consideration of the above elements. Describe your firm's intent to work with large business subcontractors for major subsystems or key project elements to ensure "flowdown" of this philosophy. (FAR 19.705-4(d) and DFARS 219.705).
5. Describe your firm's efforts, based on results of efforts described in No. 3 and No. 4 above to ensure that SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB and Veteran-Owned SB firms have equitable opportunity to participate in acquisitions. (FAR 19.704(a), 19.705-4, 52.219-9(d) and DFARS 219.705) Specifically, describe how the firm intends to evaluate its own SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB and Veteran-Owned SB award performance and program effectiveness against the established goals, both company-wide and for individual plan being negotiated. (FAR 19.704(a)(1) and (6) and 52.219- 9(d)(11)(v)) Include SBs, SDBs, WOSBs, HUBZone SBs, Service Disabled Veteran-Owned SB and Veteran- Owned SB firms by name as members of original team for providing major service or performing a significant portion of the effort. (DFARS 219.705-2(d)) Describe special efforts to establish long-range relationships with the above elements including leader-follower techniques, when appropriate. (FAR 19.705-4(d)(4) and DFARS 219.705-2(d)).
6. Your firm’s plan (in section I and II) will be evaluated on the development of percentage goals based on planned subcontracting which is challenging, yet realistic (FAR 19.705-4(d), DFARS 219.704(a)(1) and 219.705-4) Identify specific SBs, SDBs, WOSBs, HUBZone SBs, Service Disabled Veteran-Owned SB and Veteran-Owned SB firms you are planning to use as subcontractors, including the item or service or effort to be subcontracted. Indicate extent to which firms have participated in proposal preparation or otherwise indicate extent to which subcontracting to these firms may reasonably be assured. Your stated goals are realistic in view of actions stated in other portions of the plan. Your proposed percent of goal is reasonable in comparison with prior experience, yet indicates reasonable effort to improve on past experience in terms of dollars, number of SBs, SDBs, WOSBs, HUBZone SBs, Service Disabled Veteran-Owned SB and Veteran-Owned SB firms involved, and movement into area without previous SBs, SDBs, WOSBs, HUBZone SBs, Service Disabled Veteran-Owned SB and Veteran-Owned SB firm involvement. Includes evidence that if firms, universities or institutions other than HBCUs or MIs are performing on a major component or subassembly, providing a major service or performing on a key project element, SDBs, HBCUs and MIs will also be given an opportunity to perform. Also, the percentage of the SDB, HBCU, MI goal compares favorably with the percentage of SB goal, consistent with the Government-wide goals of 20 percent to SB with five percent to SDB, or is otherwise explained, and the plan includes a forecast for improvement. (The SB and SDB goals in the subcontracting plan should approximate the ratio between the SB and SDB Government-wide goals.)
7. Past performance to the extent your firm has historically been successful in establishing realistic, yet challenging, goals and achieving them will be evaluated. In cases where there has been no previous defense contract history, your firm will not be penalized. FAR 19.705-4(d)(1) and (d)(2)(iii), 19.706 and DFARS 219.706).
8. Other regulatory and statutory requirements. Regulatory and statutory requirements described below must be included in your firms subcontracting plan and will be evaluated accordingly. If any of the subject elements are not complied with, your plan will not be approved and will be returned to your office for revision before the contract can be awarded. Your subcontracting plan shall include the following:
a) A separate goal for SB, SDB, WOSBs, HUBZone SB, Service Disabled Veteran-Owned SB and Veteran-
Owned SB firms. (FAR 19.704(a)(1) and FAR 52.219-9(d)(1) and (2))
b) A separate goal for the basic contract and, if applicable, each option. (FAR 19.704(c))
c) The name of the company employee responsible for administration of plan and employee's duties. (FAR
19.704(a)(2) and 52.219-9(d)(7))
The individual who will administer this firm’s subcontracting program:
NAME ADDRESS
TELEPHONE
Describe Description of duties:
d) A statement affirming intent to comply with subcontracting "flowdown" provisions. (FAR 19.704(a)(4) and 52.219-9(d)(10)). This firm will include the clause at 52.219-8, Utilization of Small Business Concerns (see 19.708(a)), in all subcontracts that offer further subcontracting opportunities, and that the offeror will require all subcontractors (except small business concerns) that receive subcontracts in excess of $550,000 ($1,000,000 for construction) to adopt a plan that complies with the requirements of the clause at 52.219-9, Small Business Subcontracting Plan (see 19.708(b));
e) A statement affirming willingness to cooperate in studies and to provide reports. (FAR 19.704(a)(5) and 52.219- 9(d)(10))
This firm will submit such periodic reports and cooperate in any studies or surveys as may be required by the Corps of Engineers, Alaska District or the Small Business Administration in order to determine the extent of compliance by the company with the subcontracting plan as follows:
This firm will submit Standard Form (SF) 294, Subcontracting Report for Individual Contract, and SF 295, Summary Subcontract in accordance with the instructions on the forms. The name, address, and telephone number of the office responsible for preparation and submission of the reports is:
I, the undersigned, a designated officer of do hereby state that this firm agrees to carry out the Government’s policy to provide the maximum practicable opportunity for small business concerns and small business concerns owned and controlled by socially and economically disadvantaged individuals to participate in the performance of this contract consistent with its efficient performance.
f) A statement that indirect costs are either included or excluded from the proposed goals and, and if included, how they will be prorated. (FAR 52.219-9(d)(6))
g) Description of efforts to ensure that SBs, SDBs, WOSBs, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran-Owned SBs have an equitable opportunity to participate in the acquisition.
(FAR 52.219-9(d)(8)).
h) A recitation of the types of records maintained to demonstrate procedures adopted to comply with the requirements and goals in the plan(FAR 52.219-9(d)(11)).
This firm will maintain the following types of records to demonstrate procedures which have been adopted to comply with the requirements and goals set forth in the plan. (Set forth here are the records to be maintained. In order to be considered acceptable, the records shall include at the minimum the following:)
(1) SB, SDB, WOSB, HUBZone SB, Service Disabled Veteran-Owned SB, and Veteran-Owned SB lists, guides, and other data identifying vendors.
(2) Organizations contacted or to be contacted for SB, SDB, WOSB , HUBZone SB, Service Disabled
Veteran-Owned SB, and Veteran-Owned SB sources.
(3) Record of all subcontract solicitations indicating on each solicitation (i) whether SB, SDB, WOSB, HUBZone SB and Veteran-Owned SBs were solicited, and if not, why not.
(4) Records to support other outreach efforts, to include the following: contact with minority and small business trade associations, contact with business development organizations, and attendance at small and minority business procurement conferences and trade fairs.
(5) Records to support internal activities to guide and encourage buyers to include the following:
workshops, seminars, training programs, and monitoring activities to evaluate compliance.
(6) Records to support award data on a contract-by-contract basis submitted to the Government to include name, address, and business size of subcontractor.
FIRM’S REPRESENTATIVE:
SIGNATURE: _________________________________________________________________________
PRINTED/TYPED NAME: _______________________________________________________________
TITLE:
Section 00 45 00 - REPRESENTATIONS AND CERTIFICATIONS
52.204-3 TAXPAYER IDENTIFICATION (OCT 1998)
(a) Definitions.
Common parent, as used in this provision, means that corporate entity that owns or controls an affiliated group of corporations that files its Federal income tax returns on a consolidated basis, and of which the offeror is a member.
Taxpayer…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .