W911KB-10-R-0001-0001.pdf
PDF 34 KB Posted
- Solicitation number
- W911KB-10-R-0001
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911KB-10-R-0001-0003.pdf | ||
| W911KB-10-R-0001-0002.pdf | ||
| Amend 0001 Spec Changes.pdf | ||
| Amend 0001 Drawings.dwf | DWF file | |
| Amend 0001 Drawings.pdf | ||
| 10R0001 Drawings.pdf | ||
| 10R0001 Drawings.zip | ZIP file | |
| Topographic Hydrographic Survey.dwg | DWG drawing | |
| 10R0001 Sol and Specs.pdf | ||
| Presolicitation Meeting Minutes.pdf | ||
| Attch 1 Presolicitation Conference Transcript 30 Nov 09.pdf | ||
| Dwgs-AKU002-ITR.pdf | ||
| Specs-AKU002-ITR.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Project Title and Location: Navigation Improvements, Akutan, Alaska
a. The above numbered Solicitation is hereby amended to add Contractor Questions and Responses, update the proposal schedule, and make changes to the specifications and drawings. The specific changes are identified on Page 2, Summary of Changes.
b. The date/time for receipt of offers remains unchanged on 14 Jan 2010 at 4:00 pm.
c. Point of contact for this amendment is Yolanda M. Ikner at (907) 753-2553.
d. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Dec-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911KB-10-R-0001
X 9B. DATED (SEE ITEM 11)
09-Dec-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Dec-2009
CODE
U.S. ARMY ENGINEER DISTRICT, AK
CEPOA-CT (W911KB)
PO BOX 6898
ELMENDORF AFB AK 99506-0898
W911KB 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911KB-10-R-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
QUESTIONS AND RESPONSES:
1. Question: Is the contractor allowed to dewater the excavation? Note 4 W-2 of the plans states- All drainage from within the construction limits shall be drained into the excavation. Drainage or dewatering to marine waters or nearby freshwater creeks is prohibited. Section 31 23 00.00 20 excavation and fill 3.1.1.1 drainage states- So that construction operations progress successfully, completely drain construction site during periods of construction to keep soil materials sufficiently dry.
Given the conflict of the above notes is the contractor allowed to dewater the basin?
Please explain .
Response: The government does not have permits to discharge water from the site into any nearby stream, wetland, or marine water. All dewatering of the excavated material must occur within the construction boundary and water will be collected in the excavated harbor basin area. The excavated harbor basin material may be placed in the disposal area and be allowed to drain back into the harbor basin to allow the soil to become sufficiently dry for working. It is anticipated that the harbor basin will fill with water and that the excavation will be wet.
2. Question: This job requires evidence of bidders qualifications, including financial statements less than 6 months old. The standalone financial statement for GCCO is produced annually, and was last produced in March 2009. We do have current 10Q (9/30/09) for GCI. Will the 2008 GCCO standalone financial statement, in conjunction with the GCI 10Q 9/30/09 will satisfy the financial statement requirement?
Response: Yes it will.
3. Question: Section 01 22 00.00 10 part 1.2.2.1 Measurement of Access Road Fill states “ Measurement shall be made to the original surface before performance of work and to the finished surface at the lines and lines and elevations shown on the drawings after completion of work.” I interpret this to mean that the original surface is the top of the grubbing layer. If this is correct then the volume of access road fill placed to replace the grubbing is incidental. The plan quantity is based on the actual volume of fill placed. Please clarify or revise the plan quantity.
Response: As part of this amendment the referenced paragraph has been deleted, due to the deletion of the requirements to construct access roads.
4. Question: Page 14 of 92 of the bid documents- Note to Offerors #3 reads “ The following options (if needed) will be exercised concurrently. “
i. 0011, 0012
ii. 0013, 0014, 0015, 0016 Items 0011-0013 are base bid items. Please clarify the intent of this note.
Response: This note has been corrected in the revised Proposal Schedule issued as part of this amendment.
SECTION 00 21 00 PROPOSAL SCHEDULE/INSTRUCTIONS TO BIDDERS
The proposal schedule issued with the Solicitation is hereby deleted in its entirety and replaced with the attached revised Proposal Schedule (Attachment 1)
SPECIFICATIONS
The following Specification Sections are revised as indicated. The identifier "AM #1" appears before and after new and revised material. Revised Specification Sections are attached to Amendment 0001 (.pdf format).
Spec Section 01 11 00 Replace entire section
Spec Section 01 19 40.00 29 Replace entire section
Spec Section 01 22 00.00 10 Replace entire section
Spec Section 01 32 01.00 10 Replace entire section
Spec Section 01 33 00 Replace submittal register only
Spec Section 01 57 20.00 10 Replace entire section
Spec Section 01 57 34.00 29 Replace entire section
Spec Section 31 09 20.00 29 Replace entire section
Spec Section 31 23 00.00 20 Replace entire section
DRAWINGS
The drawings issued with the Solicitation are hereby deleted in their entirety. Revised Drawings are attached to Amendment 0001 (.pdf and .dwf formats).
(End of Summary of Changes)
Attachment 1
Amendment 0001
PROPOSAL SCHEDULE
NAVIGATION IMPROVEMENTS, AKUTAN, ALASKA
BASE ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price
Amount
0001 ARRA Mobilization and Demobilization, complete.
Federal Funding 90%
1 LS $__________ $__________
0002 Mobilization and Demobilization, complete.
Local Funding 10%
1 LS $__________ $__________
0003 ARRA Harbor Basin Excavation, complete.
Federal Funding
738360 CY $__________ $__________
0004 Harbor Basin Excavation, complete.
Local Funding
82040 CY $__________ $__________
0005 ARRA Construct Harbor Filter Material, complete.
Federal Funding
7650 CY $__________ $__________
0006 Construct Harbor Filter Material, complete.
Local Funding
850 CY $__________ $__________
0007 ARRA Construct Harbor Slope Protection Rock, complete. Federal Funding
11610 CY $__________ $__________
0008 Construct Harbor Slope Protection Rock, complete.
Local Funding
1290 CY $__________ $__________
0009 ARRA Seeding, complete. Federal Funding 45900 SY $__________ $__________
0010 Seeding, complete. Local Funding 5100 SY $__________ $__________
0011 ARRA Excavate Potentially Contaminated Soils with Debris, complete. Federal Funding
2700 CY $__________ $__________
0012 Excavate Potentially Contaminated Soils with Debris, complete. Local Funding
300 CY $__________ $__________
0013 Dispose of Contaminated Soil, complete.
Local Funding
200 CY $__________ $__________
0014 ARRA Partnering Session. Federal Funding 90% 1 LS $__________ $__________
0015 Partnering Session. Local Funding 10% 1 LS $__________ $__________
0016 ARRA Construct Drainage Diversion, complete.
Federal Funding 90%
1 LS $__________ $__________
0017 Construct Drainage Diversion, complete.
Local Funding 10%
1 LS $__________ $__________
Total of Base Items 0001 thru 0017 $__________
OPTIONAL ITEMS
Item No.
Description Estimated Quantity
Unit Unit Price
Amount
0018 ARRA Excavate Potentially Contaminated Soil, complete. Federal Funding
450 CY $__________ $__________
0019 Excavate Potentially Contaminated Soil, complete.
Local Funding
50 CY $__________ $__________
0020 Dispose of Contaminated Soil, complete.
Local Funding
50 CY $__________ $__________
0021 ARRA Entrance Channel Excavation, complete.
Federal Funding
117900 CY $__________ $__________
0022 Entrance Channel Excavation, complete.
Local Funding
13100 CY $__________ $__________
0023 ARRA Construct Breakwater Armor Rock, complete. Federal Funding
15840 CY $__________ $__________
0024 Construct Breakwater Armor Rock, complete.
Local Funding
1760 CY $__________ $__________
0025 ARRA Construct Breakwater B Rock, complete.
Federal Funding
8550 CY $__________ $__________
0026 Construct Breakwater B Rock, complete.
Local Funding
950 CY $__________ $__________
0027 ARRA Construct Breakwater Core Rock, complete.
Federal Funding
34110 CY $__________ $__________
0028 Construct Breakwater Core Rock, complete.
Local Funding
3790 CY $__________ $__________
0029 ARRA Seeding complete. Federal Funding 8370 SY $__________ $__________
0030 Seeding complete. Local Funding 930 SY $__________ $__________
Total of Option Items 0018 - 0030 $__________
Total of Base and Option Items 0001 - 0030 $__________
EVALUTIONS OF OFFERS.
1. AWARD: Award will be made in accordance with Section 00 22 11, PROPOSAL SUBMISSION
REQUIREMENTS, EVALUATION CRITERIA AND BASIS FOR AWARD.
Award will be made to the low, responsive, responsible offeror on the total of all items (Base and
Options).
2. INCOMPLETE OFFERS: Failure to submit an offer on all items in the schedule constitutes an incomplete offer. Incomplete offers may be rejected. Lump sum or unit prices must be shown for each item within the schedule.
3. EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government.
In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
4. SPECIAL CONDITION: If a modification to an offer based on unit prices is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the proposal schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the proposal schedule.
NOTE TO OFFERORS:
1. The Federal portion of this project is being funded under the American Recovery and Reinvestment Act of
2009 (ARRA). Due to this the Line Items in the Proposal Schedule are required to be separated based on the Cost Share percentage in order to separate the Federal ARRA funding from the Local funding. These percentages are reflected in the quantities for the unit price line items and as a percentage for the lump sum line items.
2. In accordance with FAR 52.215-1 Instructions To Offerors - Competitive Acquisition (Jan 2004) para.
(f)(8), “The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.”
3. The following Option Items (if needed) will be exercised concurrently.
- 0018, 0019, 0020
- 0021, 0022, 0023, 0024, 0025, 0026, 0027, 0028, 0029, 0030
4. A permit to divert a stream was being processed by the State of Alaska at the time this solicitation was released. The permit is expected to be issued well before the proposal due date and coordination with regulators has allowed the design and anticipated permit-related conditions and stipulations to be incorporated into the solicitation. However, no award will be made until all required permits are obtained.
The Government reserves the right to cancel this solicitation prior to award with no obligation to the offeror or the Government if unanticipated and insurmountable permitting issues are encountered.
5. Local Points of Contact in Akutan for the Project.
City of Akutan, Joe Bereskin, Mayor, 907-907-698-2241 Trident Seafood Processors, Steve Francis, 907-698-2211
6. In accordance with Specification Section 35 31 19, Paragraph 2.1, Contract shall indicate
Rock Source:
File details come from the government source that posted it. Updated .