RECOVERY. Modernization of the IRS Service Center in Andover, MA

Award Notice Posted

Solicitation number
GS-01P-09-BZ-C-0014
Agency
Awarded
to Columbia Construction Co
Set-aside
No set-aside

Opportunity facts

Contract number
GS-01P-09-BZ-C-0014 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
Internal Revenue Service (IRS) IRS Service Center 310 Lowell Street Andover, Massachusetts, United States

Notice details come from SAM.gov. Updated .

Notice text

15 versions

Update #15 · Latest ·

RECOVERY, This notice is for information purposes only:  The following modification was issued to Contract No. GS-01P-09-BZ-C-0014 to delete work as follows:  Modification PS59, deletes the Solar Photo Voltaic Roof System from the contract for a total credit of $2,011,189.00.  This modification is being made to an existing contract that was competed using full and open competiton.

Update #14 ·

RECOVERY, This notice is for information purposes only; The following modification was issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows: Modification PS40 includes Rain Leader clean outs, infill existing sleeves in penthouses, relocation of existing annunciator and FA conduits in the MDF room, remove PCB penthouse louvers, remove PCB door frames in L & M, concrete core testing for bathroom, existing penthouse door opening modification, Sector A toilet room, sidewalk detail at Sector B exterior, additional slab demo and material for new slab pour, for a total of $145,133.00; This modification is being made to an existing contract that was competed using full and open competition.

Update #13 ·

RECOVERY, This notice is for information purposes only;  The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows:  Modification PS38 includes temporary gas meter and purchase of gas to be used in heaters for construction Phase I during the 2010-2011 winter, for a total of $253,309.00; Modification PS39 includes Revisions to Primary Electric, Revision to irrigation piping material, rain leader clean outs, Phase I existing chilled water cross over piping demo, seismic bracing, roof drain vertical pipe replacement, column reinforcing Sectors A & B, Remove plaster ceiling in chiller room, electrical room, office and generator rooms in Sector M, for a total of $232,953.00.  These modifications are being made to an existing contract that was competed using full and open competition.

Update #12 ·

RECOVERY, This notice is for information purposes only; The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows; Modification PS38 includes purchase gas for heaters for construction Phase I during the 2010-2011 winter, for a total of $253,309.00, Modification PS39 includes revisions to Primary Electric, revisions to irrigation piping material, rain leader clean outs, Phase I existing chilled water cross over piping, Seismic bracing, roof drain vertical pipe replacement, column reinforcing Sectors A and B, Remove Plaster Ceiling in Chiller Room, electrical room, office and generator rooms in Sector M, for a total of $232,953.00. These modifications are being made to an existing contract that was competed using full and open competition.


 

 

 
Path:


Update #11 ·

RECOVERY, This notice is for information purposes only; The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows; Modification PS35 includes PCB Removal for Loading Dock area, North West Corner, and Precast panel demo in Sectors A & B for a total of $405,996.00, Modification PS36 includes additional ACM Abatement, data telecom wiring at winter gardens protected and operational, temporary feed to existing support panel for a total of $75,027.00: Modification PS37 includes Steel for MEP Phase I, for a total of $499,944.00.  These modifications are being made to an existing contract that was competed using full and open competition.

Update #10 ·

RECOVERY, This notice is for information purposes only; The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows; Modification PS29, Kitchen wall modification, additional ACM, electrical, removal CMU wall, revisions to Geo wiring for a total of $221,049.00, Modification PS30 includes PCB waste removal for a total of $273,450.00, Modification PS31 includes Temporary Heat, roof slope modification, additional ACM removal, extension of slab at winter garden, railing paint finish changed, stone security wall deleted, removal of existing site lighting, remove floor hatches at penthouses, revision  to epoxy floor, relocate EPO system, court yard hose bib and area drains, temp sprinkler coverage in MDF room, sewer manhole at security wall, existing cross bracing in skylight, swap of IDF geothermal rooms for a total of $196,998.00, Modification PS33 includes escort service for a total of $32,800.00,  Modification PS34 includes temporary generator, fire department loop connection pipe, hydrants in summer and winter gardens and plumbing pipe relocation in winter garden for a total of $59,956.00; These modifications are being made to an existing contract that was competed using full and open competition.

Update #9 ·

RECOVERY, This notice is for information purposes only.  The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows:  Modification PS25, Delete Acoustical sealand, greese trap connection, Fire Protection riser, removal of ceiling in MDF room, Geothermal work-overflow pipe in well field, drain man hole #4, drain man hole $6, steel for mechanical hangers for a total of $34,122.00; Modification PS26, relocation and demo of fire alarm panel in sector C, removal of footings in new electrical room, new cold water piping for a total of $14,483.00; Modification PS27, removal of PCB windows on the north wing, demolition/hazmat abatement, hazardous materials and scheduling for a total of $333,415.00.  These modification are being made to an existing contract that was competed using full and open competition.

Update #8 ·

RECOVERY, This notice is for information purposes only. The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows. Modification PC19, Removal and disposal of all PCB contaminated lighting ballast in Phase II for a total of $75,000.00, Modification PC20 Lead Base paint abatement for Phase II for a total of $411,000.00, Modification PC21 Abate and Demo of masonry along A/A1 line and abate and disposal of Black Mastic along A/A1 line for Phase II for a total $256,000.00, Modification PC22 Abate and disposal of Asbestos containing materials  (ACM) for Phase II for a total $405,000.00, Modification PS23 for Temporary Heat for a total of $591,480.00, Modification PS24 includes, Brick mastic removal at T1 Line steel beam web, Drain connection to security barriers, Demo CMU calls, Demo front canopy for a total $465,942.00; These modifications are being made to an existing contract that was competed using full and open competition. 

Update #7 ·

RECOVERY, This notice is for information purposes only. The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows. Modification PS17, MDF and Computer room Phasing, Credit revise metal finished from bronze to stainless for a total of $407,058.00, Modification PS18 includes removal of transformer and switches, remove wall and footing in kitchen area, new chillers and demo old chillers, drain cleaning, tapered insulation roof survey, domestic water info., moving location of door and additional pipe demo, for a total of $78,374.00.   These modifications are being made to an existing contract that was competed using full and open competition

Update #6 ·

RECOVERY, This notice is for information purposes only.  The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows.  Modification PS12, Kitchen sprinkler main, power split P1/P2, Distribution panel, Data conduit underslab, temporary gaurd houseUnit skylightds for a total of $114,561.00, Modification PS13 includes Incoming cuitut breaker, ACM Mastic at T/T1 wall, Sprinkler HazMat, Demo mechanical equipments and Lead Paint pipe for a total of $239,620.00, Modification PS15 includes Lead Paint Removal for Phase 1 for a total of $352,937.00.  These modifications are being made to an existing contract that was competed using full and open competition.

Update #5 ·

RECOVERY, This notice is for information purposes only.  The following modification was issued to Contract GS-01P-09-BZ-C-0014 to add change order work as follows.  Modification PS10 consists of Out of Phase Electrical work (Phase I & II), Demolition of Hidden Ceiling, Masonry Delolition, Sector A Lead Abatement, Credit for Roof Drain Leader, Panel Penthouse Relocation and Project Signage Reprint for a total of $296,669.00.  This modification is being made to an existing contract that was competed using full and open competition.

Update #4 ·

RECOVERY, This notice is for information purposes only.  The following modification was issued to Contract GS-01P-09-BZ-C-0014 to add change order work as follows.  Modification PS08, consists of New Geothermal HVAC System for a total of $13,821,687.00.  This modifcation is being made to an existing contrct that was competed using full and open competition 

Update #3 ·

RECOVERY, This notice is for information purposes only.  The following modifications were issued to Contract GS-01P-09-BZ-C-0014 to add change order work as follows:  Modification PS06, Consists of Abatement and Disposal of Asbestos Phase I and Exterior AMC Enclosure for a total of $344,900.00;  Modification PS07 includes Childcare replacement windows, oil storage building, Flooring changes, speciality shelving, additional room signs, and HVAC changes; controlled demo in Sectors A & B; and work related to provide a secondary temporary egress, for a total of $265,601.00.  These modifcations are being made to an existing contract that was competed using full and open competition. 

Update #2 ·

RECOVERY, This notice is for information purposes only.  The following modifications were issued to Contract No. GS-01P-09-BZ-C-0014 to add change order work as follows:  Modification PS03, Security System Modifications, Lead Paint Pilot Tests and Phase 1 PCB ligh removal and disposal for a total of 155,363.00.  Modification PS04, includes installation of CAT 5 Cables and Removal of excess furniture, accessories and fixtures for a total of 15,920.00.  These modifications are being made to an existing contract that was completed using fulland open competion. 

Update #1 ·

RECOVERY. SOLICITATION NOTICE: As authorized and partially funded by the American Recovery and Reinvestment Act (ARRA) of 2009, the General Services Administration (GSA) has a requirement for a qualified prime contractor to provide all supervision, labor, materials and equipment necessary to provide for the Modernization of the IRS Service Center in Andover, MA. The work includes, but is not limited to:



i) This project is for the complete modernization of the Internal Revenue Service (IRS) Service Center in Andover, MA. The IRS is consolidating, modernizing and transitioning its operations at the Andover Campus, impacting the Main Building located at 310 Lowell St., as well as other functions located at several leased locations in the area. The proposed project consists of the renovation of the 366,141RSF in the main building at the Andover, MA campus. The IRS will consolidate Accounts Management (AM) and Compliance Service (CS) functions into the main building, while phasing out submission processing (SP) of paper tax returns. The GSA has determined that renovating the existing Main Campus is the best and most viable housing alternative to fulfill the IRSs requirements for consolidation of the offsite leases and modernization of the infrastructure. Renovating and retaining this facility will allow the government to continue to provide code compliant, state-of-the-art, secure, environmentally compliant, and energy efficient space in this large campus facility, strategically located off the I-93 highway.



ii) The major components of the renovation work are included in the following items:

(1) Superstructure: Seismic upgrades

(2) Exterior Glazing and Doors: Window security upgrade and miscellaneous wall repairs

(3) Partitions, Doors and Specialties: Lobby entry, toilet upgrades, handicap accessibility

(4) HVAC: Equipment, ductwork and controls replacement

(5) Electrical: Switchgear and equipment replacement, installation of a 500KW Photovoltaic array

(6) Fire Protection/Alarm: Sprinkler, fire pump, and fire alarm upgrade

(7) Equipment and Furnishings: Tenant and common space renovations

(8) Building Demolition and Abatement: Interior demolition and abatement of hazardous materials.

(9) Roof replacement

(10) Reconfiguration of entrance driveways and exterior security enhancements.

(11) Removal and replacement of oil storage tank



The project will be completed in two phases to accommodate partial occupancy by the government during construction. This project includes options, which will be evaluated as part of the award. The contract performance period is approximately 28 months with each phase lasting 14 months.. The magnitude of construction is between $75,000,000 and $100,000,000. The NAICS Code is 236220. Size standard is $33.5 Mil. All individuals working on this project will be required to obtain security clearances.



The approach to source selection for this procurement will be pursuant to the greatest value concept. The objective is to select the proposal that offers the greatest value for the funds expended and not necessarily the lowest price. The solicitation will require offerors to submit a technical and price proposal.



Technical Evaluation: The technical evaluation factors are Past Performance, Management Plan and Technical Approach to Completing Phased Building Occupied Construction Projects within Urban Developments, Key Personnel & Past Performance of Key Personnel, Subcontracting.



This announcement also constitutes the synopsis of the pre-invitation notice. Copies of this Solicitation (RFP), technical specifications and drawings will be available through the World Wide Web on or about 05/01/2009 @ www.fedbizopps.gov. Contractors are responsible for printing the solicitation and all related documents. It is the contractors responsibility to monitor this site for the release of the solicitation, any amendments and related information. The following clause will be included in the solicitation: 52.225-23, Required Use of American Iron, Steel, and Other Manufactured GoodsBuy American ActConstruction Materials Under Trade Agreements (MAR 2009).

All responsible sources may submit a bid, proposal, or quotation which shall be considered by the agency.



"The General Services Administration strongly encourages participation by small businesses and the related socioeconomic categories of small disadvantaged, women-owned, service disabled veteran-owned and HUBZone businesses.

The RFP will provide date, time and location for the Pre-Proposal Conference. Following the conference, time will be allowed for a networking session for small, small disadvantaged, women owned, hubzone, service disabled veteran owned and large businesses to meet other prospective firms for possible subcontracting opportunities on this project. Further information on this networking session will be listed in the RFP. To ensure that you receive all information regarding this solicitation, please register to receive updates at www.fedbizopps.gov, and follow the procedures for notification registration.

CONTRACTORS WILL BE REQUIRED TO REGISTER WITH THE CENTRAL CONTRACTOR REGISTRATION (CCR) AT: http://www.ccr.gov prior to award.

Files

File Type Posted
PreProposalConferenceMinutes.pdf PDF
signinsheet preproposal conferenceattendees.pdf PDF
Amendment 0001.pdf PDF
Revision 2-SMA00217.pdf PDF
Revision 3-SMA00217.pdf PDF
Revision 1-SMA00217.pdf PDF
Spec 010300 - Alternates - Revision 1.pdf PDF
Revision 1-3 Descriptions.pdf PDF
Andover - SF 1442 - Ammend 1.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors