Andover - SF 1442 - Ammend 1.pdf

PDF 25 KB Posted

Attached to
RECOVERY. Modernization of the IRS Service Center in Andover, MA
Solicitation number
GS-01P-09-BZ-C-0014
Issued by

About this file

SF 1442 - Amendment 0001

View the file

Other files

File Type Posted
signinsheet preproposal conferenceattendees.pdf PDF
PreProposalConferenceMinutes.pdf PDF
Revision 3-SMA00217.pdf PDF
Amendment 0001.pdf PDF
Revision 2-SMA00217.pdf PDF
Revision 1-SMA00217.pdf PDF
Spec 010300 - Alternates - Revision 1.pdf PDF
Revision 1-3 Descriptions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GS-01P-09-BZ-C-0014, Amendment 0001 1

1. Solicitation No. 2. Type of Solicitation 3. Date Issued Page of PagesSOLICITATION, OFFER, AND AWARD GS-01P-09-BZ-C-0014 Sealed Bid (IFB) May 6, 2009 1 of 4

(Construction, Alteration, or Repair) X Negotiated (RFP)

IMPORTANT – The “offer” section on the reverse must be fully completed by offeror.

4. Contract No. 5. Requisition/Purchase Request No. 6. Project No.

VMA 00009

7. Issued By Code 1PC 8. Address Offer to Code 1PC

GSA/PBS Property Development Division (1PC) Same Address as Block 7

T.P. O'Neill Federal Building Attn: Deborah Fournier

10 Causeway St., 9th floor, Rm 975

Boston, MA 02222-1077

A. Name B. Telephone No. (Include area code) (No Collect Calls)

Deborah Fournier (617) 565-59709. For Information Call:

Cell (617) 893-0331

SOLICITATION

NOTE: In sealed bid solicitation “offer” and “offeror” mean “bid” and “bidder”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: (Title, Identifying No., Date)

Project Title: Modernization of IRS Andover Service Center

Project No.: VMA00009

Project Location: Andover, Massachusetts

The magnitude of construction is between $75,000,000 and $100,000,000. The NAICS Code is 236220. Size Standard is $33.5 Mil.

Drawings and Specification will be downloaded to the FedBizzOps website (www.fbo.gov)

A bid guarantee is required with any bid in excess of $25,000.00. The bid guarantee shall be in the amount of 20% of the bid or $3 million dollars, whichever is less.

11. The Contractor shall begin performance within 14 calendar days and complete it within 840 calendar days after receiving the award, X notice to proceed. This performance period is X mandatory negotiable. ( See Section 00800, FAR Clause 52.211-10)

12A. The Contractor must furnish any required performance and payment bonds? 12B. Calendar Days

(If “YES”, indicate within how many calendar days after award in item 12B.)

X Yes No 14

13. Additional Solicitation Requirements:

A. Sealed offers in original and 3 copies to perform the work required are due at the place specified in Item 8 by 02:00 PM (hour) local time

June 10, 2009 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is Is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 Standard Form 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1 (e)

GS-01P-09-BZ-C-0014, Amendment 0001 2

OFFER (Must be fully completed by offeror)

15. Telephone No. (Include are code)14. Name and Address of Offeror (Include ZIP Code)

Code Facility Code

16. Remittance Address (Include on it different than Item 14)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this is accepted by the Government in writing within ________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendment to the solicitation - give number and data of each)

AMENDMENT

No.

DATE

20A NAME,TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or Print) 20B. SIGNATURE 20c. OFFER DATE

AWARD (to be completed by Government)

21. ITEM(S) ACCEPTED

22. Amount 23. Accounting and Appropriation Data

25. Other Than full and open competition pursuant to24. Submit Invoices to Address shown in Item 26 (4 copies unless otherwise specified)

10 U.S.C. 2304(c) ( ) 41 U.S.C 253 (c) ( )

26. Administered by Payment will be made by

GSA/PBS Property Development Division (1PC) T.P. O'Neill Federal Building 10 Causeway Street, 9th Floor, Rm 975 Boston, MA 02222-1077

General Services Administration Finance Division, (7BCPC) P.O. Box 17181, Room 5A-30 Fort Worth, TX 76102-0181

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return 3 copies to issuing office) Contractor agrees to furnish and deliver all items or perform all work, requisition stated in this contract. The rights and obligation s of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and(c) the clauses, representations certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. Name and Title of Contractor or Person authorized 31A. Name of Contracting Officer (Type or Print)

Deborah A. Fournier Contracting Officer

30C. Date 31B. United States of America 31C. Award Date30b. Signature

By

STANDARD FORM 1442 BACK (REV. 4-85)

GS-01P-09-BZ-C-0014, Amendment 0001 3

SECTION B

SCHEDULE OF OFFERS:

(All offeror's are required to provide prices as follows)

ITEM SUPPLIES/SERVICES QTY. UNIT UNIT PRICE AMOUNT

Modernization of IRS Andover Service Center at Andover, MA

0001 Base Offer. The base offer includes the entire project as described in the 100% Construction Documents.

1 LS $_____________ $_____________

0002 Unit Price for any additional concrete slab on grade patching beyond what is specified in the base bid. The quantity listed is an estimated quantity. Contract Clause 52.211-18 applies.

500 SF $_____________ $_____________

0003 Unit Price for any additional replacement of existing gypsum roof deck with metal deck beyond what is specified in the base bid. The quantity listed is an estimated quantity. Contract Clause 52.211-18 applies.

1800 SF $____________ $_____________

0004 Unit Price for any additional routing and sealing of cracks in existing concrete slab beond what is specified in the base bid.

The quantity listed is an estimated quantity. Contract Clause 52.211-18 applies.

500 LF $____________ $_____________

0005 Alternate 1. Provide all labor, equipment, and materials to replace all HVAC ductwork, hot and chilled water piping, sprinkler mains, and associated work as identified in the plans and specifications in lieu of base bid work.

1 LS $____________ $_____________

0006 Option 1. Provide a complete renovation to Servery and Kitchen as outlined in the plans and specifications.

1 LS $____________ $_____________

0007 Option 2. Provide upgrades to the physical and electronic security beyond the base bid work as shown on plans and specifications.

1 LS $____________ $_____________

GS-01P-09-BZ-C-0014, Amendment 0001 4

0008 Option 3. Provide new audio visual systems and equipment and associated modifications beyond the base bid work as shown on the plans and specfiications.

1 LS $____________ $_____________

All Unit Price, Alternate, and Option work is clearly defined in the specifications and drawings.

File details come from the government source that posted it. Updated .