Spec 010300 - Alternates - Revision 1.pdf

PDF 17 KB Posted

Attached to
RECOVERY. Modernization of the IRS Service Center in Andover, MA
Solicitation number
GS-01P-09-BZ-C-0014
Issued by

About this file

Revised Specification Section 010300 - Alternates

View the file

Other files

File Type Posted
signinsheet preproposal conferenceattendees.pdf PDF
PreProposalConferenceMinutes.pdf PDF
Revision 3-SMA00217.pdf PDF
Amendment 0001.pdf PDF
Revision 2-SMA00217.pdf PDF
Revision 1-SMA00217.pdf PDF
Andover - SF 1442 - Ammend 1.pdf PDF
Revision 1-3 Descriptions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MODERNIZATION TO IRS SERVICE CENTER GSA REGION 1

Andover, MA

PROPERTY OF THE UNITED STATES GOVERNMENT Copying, including electronic copying, dissemination, or distribution of these drawings, plans or specifications, or any part thereof, to unauthorized persons or without written permission of the US Government is prohibited.

BID DOCUMENTS ALTERNATES

MAY 1 2009 010300 - 1

REVISED 05-18-09

SECTION 010300

ALTERNATES

PART 1 - GENERAL

1.1 SUMMARY

A. Definition: An alternate is an amount proposed by Bidders and stated on the Bid Form that will be added to Base Bid amount if the Government decides to accept a corresponding change in either scope of work or in products, materials, equipment, systems or installation methods described in contract documents.

B. Coordination: Coordinate related work and modify or adjust adjacent work as required to ensure that work affected by each accepted alternate is complete and fully integrated into the project.

C. Schedule: A “Schedule of Alternates” is included at the end of this section. Specification sections referenced in the schedule contain requirements for materials and methods necessary to achieve the work described under each alternate.

D. Scope: Include as part of each alternate, miscellaneous devices, appurtenances, and similar items incidental to or required for a complete installation whether or not mentioned as part of the alternate.

E. See “Basis for Award” Section 00120 and Bid Forms for additional requirements.

PART 2 – PRODUCTS (NOT APPLICABLE)

PART 3 – EXECUTION

3.1 SCHEDULE OF ALTERNATES

A. ALTERNATE #1: In lieu of base bid work that retains portions of existing ductwork, hot and chilled water piping and sprinkler mains to be connected to new systems, construct instead entirely new above mentioned systems including all equipment indicated as part of Alternate #1 including all mechanical, electrical, fire protection, plumbing and other related work as shown in the drawings and specifications. Price to include associated work for structural reinforcement of girders for pipe penetrations and for mechanical penthouse

MODERNIZATION TO IRS SERVICE CENTER GSA REGION 1

Andover, MA

PROPERTY OF THE UNITED STATES GOVERNMENT Copying, including electronic copying, dissemination, or distribution of these drawings, plans or specifications, or any part thereof, to unauthorized persons or without written permission of the US Government is prohibited.

BID DOCUMENTS ALTERNATES

MAY 1 2009 010300 - 2

REVISED 05-18-09

new floor slab openings and changed louver wall openings. The heights of the ceilings within the main open office space shall be as indicated in the drawings for Alternate #1.

END OF SECTION 010300