Recovery* deferred maintenance administrative facilities AVA admin site window restoration - AVA ranger district, AVA douglas county, missouri
Award Notice Posted
- Solicitation number
- AG-4419-S-10-0705
- Agency
-
Operations Center East
Economic Recovery Operations, Department of Agriculture
- Awarded
- to RIO Contracting LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-4419-C-10-0604 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Usda Forest Service Mark Twain NF - Ava Ranger District Rolla, Missouri 65401, United States
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
*RECOVERY* DEFERRED MAINTENANCE ADMINISTRATIVE FACILITIES, AVA ADMIN SITE WINDOW RESTORATION, AVA RANGER DISTRICT, AVA, DOUGLAS COUNTY, MISSOURI (MARK TWAIN NATIONAL FOREST)
Project Description: The work consists of restoring the existing wood windows and installation of wooden storm windows on two offices, one shed, one garage, and one warehouse. It also consists of the repair and limited replacement of all exterior woodwork on these 5 buildings. All painted surfaces that were tested contain lead paint and these tests are considered representative of all painted surfaces. This project also consists of tuck-pointing damaged mortar joints on 5 buildings; roofing repairs, porch repairs, siding repairs, and installation of a cellar door at the Mark Twain National Forest/Ava Ranger District Office, Douglas County, Missouri.
Project Location: 1103 S Jefferson, Ava, MO 65608, from Springfield, MO drive East 38 miles on US Hwy 60, drive South 14 miles on Hwy 5, turn left on S. Jefferson drive 0.3 miles, arrive at site on right.
Price Range for this project is: Between $100,000 - $250,000
This procurement is hereby determined “UNRESTRICTED” for full and open competition.
This project is funded in whole by the American Recovery & Reinvestment Act (ARRA).
ALL VENDORS ARE REQUIRED TO BE REGISTERED IN THE CENTRAL CONTRACTOR REGISTRATION (CCR/ORCA) PRIOR TO AWARD OF A CONTRACT, HTTP:://WWW.CCR.GOV/
“NOTICE: FACSIMILE/EMAIL PROPOSALS AND BIDS ARE NOT ACCEPTABLE”
Update #1 ·
RECOVERY AVA RANGER DISTRICT - DEFERRED MAINTENANCE ADMINISTRATIVE FACILITIES AVA ADMIN SITE WINDOW RESTORATION (MARK TWAIN NATIONAL FOREST)
RECOVERY - This project is funded in whole by the American Recovery and Reinvestment Act (ARRA)
PROJECT DESCRIPTION:
Restoration of existing windows in 2 office buildings, 1 warehouse, 1 garage and installation of new storm windows over restored windows. Lead Abatement, tuckpointing, siding, roofing, porch and wall repairs on 5 buildings.
PROJECT LOCATION:
The project is located in Ava Ranger District within Douglas County in Missouri
AVA RANGER DISTRICT MARK TWAIN NATIONAL FOREST
PERIOD OF PERFORMANCE: 70 DAYS from Notice to Proceed.
A PRE-BID MEETING IS SCHEDULED AND DETAILS WILL BE POSTED IN RFP.
ESTIMATE COST RANGE: Between $100,000 and $250,000.
SET-ASIDE: This acquisition is set aside as UNRESTRICTED for full and open competition.
Files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1.pdf | ||
| Pre-Bid Meeting Notes-Documents.doc | DOC document | |
| Window Assessment Photo 1.pdf | ||
| Experience Capability Statement 0705.doc | DOC document | |
| Schedule of Items.docx | DOCX document | |
| SF 1442 Cont 0705.docx | DOCX document | |
| SF 1442 - Solicitation Cover Pg.pdf | ||
| Methods of Reducing Lead-Paint Hazards in HH.pdf | ||
| Standards Guidelines.pdf | ||
| Houston and Ava Lead inspection report.pdf | ||
| Specifications.rtf | RTF text file | |
| DBA.pdf | ||
| Window Assessment Photos 2 .pdf |
Show all 13
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity