Schedule of Items.docx
DOCX document 16 KB Posted
- Solicitation number
- AG-4419-S-10-0705
About this file
Schedule of Items
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Bid Meeting Notes-Documents.doc | DOC document | |
| SF 30 Amendment 1.pdf | ||
| SF 1442 Cont 0705.docx | DOCX document | |
| Standards Guidelines.pdf | ||
| Houston and Ava Lead inspection report.pdf | ||
| SF 1442 - Solicitation Cover Pg.pdf | ||
| Specifications.rtf | RTF text file | |
| Methods of Reducing Lead-Paint Hazards in HH.pdf | ||
| DBA.pdf | ||
| Window Assessment Photos 2 .pdf | ||
| Window Assessment Photo 1.pdf | ||
| Experience Capability Statement 0705.doc | DOC document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOL NO: AG-4419-S-10-0705
UNIT: Mark Twain National Forest Ava Ranger District, Douglas County, MO PROJ NAME: Deferred Maintenance Admin Facilities - Ava Admin Site Window Restoration
CIM-0900-15F-190-0905-06
SCHEDULE OF ITEMS
Pay Items Supplies/Services Unit Unit Price Total Price Base Items
| 1. Window Restoration North Office 1st Floor | LS | _________ | _________ | |
| 2. Window Restoration North Office 2nd Floor | LS | LS | _________ | _________ |
| 3. Window Restoration South Office 1st Floor | LS | _________ | _________ | |
| 4. Window Restoration South Office 2nd Floor | LS | LS | _________ | _________ |
| 5. Window Restoration Garage | LS | _________ | _________ | |
| 6. Window Restoration Warehouse | LS | _________ | _________ | |
| 7. Exterior Painting and Wall Repair, 5 buildings | LS | _________ | _________ |
Optional Items
| 8. North Office Roof Repair | LS | _________ | _________ |
| 8. A. (Optional)North Office Roof Replacement | LS | _________ | _________ |
| 9. South Office Porch Repair | LS | _________ | _________ |
| 10. Exterior Wall Tuckpointing, 5 buildings | LS | _________ | _________ |
| 11. South Office Cellar Door Installation | LS | _________ | _________ |
| Total Cost Base Items | _________ |
| Total Cost Base + Optional Items | _________ |
Notes:
1. Items 1-7 are base items.
2. Items 8-11 are optional items.
3. Items are listed in descending order of importance.
4. Items will be awarded based on available funds; all items may not be awarded.
5. Items 8 and 8 A will not be awarded together. If one is awarded the other will not be.
LS=Lump Sum
File details come from the government source that posted it. Updated .