Pre-Bid Meeting Notes-Documents.doc
DOC document 584 KB Posted
- Solicitation number
- AG-4419-S-10-0705
About this file
Pre-Bid Meeting Notes/Documents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1.pdf | ||
| SF 1442 Cont 0705.docx | DOCX document | |
| Standards Guidelines.pdf | ||
| Houston and Ava Lead inspection report.pdf | ||
| SF 1442 - Solicitation Cover Pg.pdf | ||
| Specifications.rtf | RTF text file | |
| Methods of Reducing Lead-Paint Hazards in HH.pdf | ||
| DBA.pdf | ||
| Window Assessment Photos 2 .pdf | ||
| Window Assessment Photo 1.pdf | ||
| Experience Capability Statement 0705.doc | DOC document | |
| Schedule of Items.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Deferred Maintenance Admin Facilities Ava Admin Site Window Restoration Mark Twain National Forest
AG-4419-S-10-0705
7/14/2010 Pre-Quote Meeting/Site Showing
| Name |
| Company |
| Address |
| Contact Information |
| Jason Cunningham |
| Mid Continental Restoration |
| 401 E. Hudson |
Ft. Scott, KS 620-223-3700
620-704-2700 (Cell)
| Mike Eddings |
| Sturzenbecker Constructin |
| 1113 44th Ave. |
Myrtle Beach, SC 29577 843-626-3500 (Office)
417-496-7275 (Cell)
| Steve Dahms |
| Auco Inc. |
| Hamilton, MO |
| 816-583-7731 |
816-465-0016 (Cell) aucodahms @hotmail.com
| Andy Detwiller |
| Auco Inc. |
| Carlose Ybarra |
| Rycon Environmental |
| 213 S. River 57 |
Commerce, OK 74339 918-675-5604 (Office)
918-675-4055 (FAX)
918-961-0614 (Cell)
| Dan Pishny |
| Pishny Restoration |
| 12202 W. 88th |
Lenexa, KS 66215 903-227-0251
| Steve White |
| T & S Glass |
| 1091 Falcon Crest |
Nixa, MO 65714 417-860-1824
| Jason Cook |
| T & S Glass |
| 1091 Falcon Crest |
Nixa, MO 65714 417-860-1824
| Larry Hedges |
| Historical Window Mfg. |
| Kansas City, MO |
| 816-380-3395 |
| Josh Livingston |
| Rio Contracting |
| 1968 E. Chestnut Expwy |
Springfield, MO 65802 417-886-0909
417-886-0908 (FAX)
| Mark Porter |
| ABP |
| 700 N. Miller |
Springfield, MO 417-869-5550
417-869-2950
| Ann Valade |
| US Forest Service |
| 8914 State Route AD |
Dora, MO 65637 417-257-0484 (Office) 573-202-8151 (Cell)
| Justin Adams |
| US Forest Service |
| 1103 S. Jefferson |
Ava, MO 65608 417-683-4428
| James Halpern |
| US Forest Service |
| 1103 S. Jefferson |
Ava, MO 65608 417-683-4428
| Ryan Brown |
| US Forest Service |
| 1103 S. Jefferson |
Ava, MO 65608 231-649-3798
| Adam Garrison |
| US Forest Service |
| 401 Fairgrounds Rd. Rolla, MO |
| 573-202-9974 |
Questions/Answers:
1) Clarification: There is an error on the Site Diagram Lead Based Paint Survey Drawing, Figure 2.0. The building shown as the Warehouse on the diagram is actually the single-wide trailer. A revised diagram will be attached with the Amendment showing the correct location of the warehouse.
2) Clarification: The escape ladder on the North building, specified to be removed by the contractor, will remain the property of the Government.
3) Revision: SECTION 085201 – Window Restoration; Part 8.1 Sash and Jamb Repair, Paragraph A.1, Replacement Glass: Add “Replacement glass for all windows to be low-E while maintaining clarity, reflective, and thickness requirements that are close to original”.
4) Question: The specifications state that the window restoration work is to be performed at the project site. Is this absolute?
Answer: Restoration of the windows may take place off-site, however the priming and painting will take place at the project site to allow for government inspection of restoration work.
5) Question: Does the contractor need to provide proposal for installing the cellar door?
Answer: The selected Contractor will be responsible for providing a submittal with a shop drawing and connection details of the cellar (bulkhead) door and connection to the building for acceptance, the attachment method shall provide a weathertight seal, minimize disturbance to the historical fabric of the building (any necessary anchors will be placed in the concrete basement wall or tuckpointed wall joints, wall rocks are not to be disturbed). Contractor will be responsible for ensuring codes, standards, and regulations in the contract are met and followed.
6) Question: Does the 2” x 4” screen framing on the outside of the windows get removed?
Answer: Yes, the 2” x 4” framing will need to be removed for installation of the storm windows.
7) Question: Are the windows in the warehouse garage doors to be restored?
Answer: Yes, payment will be under Item 7.
8) Question: Some of the windows in the warehouse garage doors have plexi-glass in them. If we have to replace some panes, do we replace with plexi-glass or something else?
Answer: IBC 2009: Section 2406.4 Hazardous Locations…. Glazing in swinging doors. Safety glazing (fully tempered allowable) will be required. Approximate thickness and clarity/color shall closely match historic and replacement glass on other windows as specified.
9) Question: To what extent is abatement required for the lead paint on the garage doors and exterior woodwork?
Answer: All lead paint work shall be performed by Certified Lead Abatement/Certified contractor, EPA, MoDNR, OSHA, and HUD regulations for personal protective equipment, government employee protection, cleaning and waste containment will be followed. Exterior soffit, fascia, siding, etc. will not be full abatement or encapsulation it will be removal of all loose and friable paint with sanding to provide a smooth blemish free surface that will accept primer and paint as specified (Benjamin Moore) and wood repair. Windows and all friction surfaces will require complete lead paint removal and abatement.
10) Question: Do the interior surfaces of the garage doors get painted?
Answer: Only the exterior and friction surfaces are to be painted.
11) Question: Are the basement windows included in the window restoration work?
Answer: Yes, Add Basement windows will be covered under Item 7: abate lead paint on basement windows, repair wood if necessary, prime and paint, weatherseal.
12) Question: Are there any restrictions to the hours in which work can be done?
Answer: Contractor will be permitted to work outside of the normal 8:00 AM – 4:30 PM work hours.
Revised Site Diagram: Lead Based Paint Survey, Figure 2.0