Plunge Pool Repairs at Salt Creek, NE
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F20B0020
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Lincoln NE 68501 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks construction services to repair damaged plunge pools and outlet channels along Salt Creek, Nebraska caused by the 2019 flood event. The scope of work involves grading and reshaping sloughed banks, placing riprap and bedding material around plunge pool perimeters, removing accumulated sediment and debris from six sites, and seeding disturbed areas. A site visit was scheduled for August 27, 2020 and bids are due by 2:00pm on September 14, 2020. The Department of the Army Corps of Engineers Omaha District will evaluate bids and make an award.
The solicitation is set aside for total small business concerns. The primary NAICS code is 237110 for water and sewer line and related structures construction with an estimated value between $1,000,000 and $5,000,000. The construction duration is 180 calendar days across multiple dam sites in Lincoln, Nebraska. Amendments require pre- and post-construction surveys of haul roads and restoration of any deviations exceeding 0.1 feet between surveys.
Notice text
This project is intended to repair damaged plunge pools and outlet channels caused by the 2019 Flood Event. High releases resulted in riprap displacement and sloughed channel banks. In general, repairs will involve grading and reshaping of sloughed banks, placing riprap and bedding material around plunge pool perimeters, along with removal of accumulated sediment/debris as needed to ensure adequate downstream channel capacity. Seeding of disturbed areas will be required. Prior to commencement of construction at each site, the reservoirs will be drawn down as necessary to be below the ungated inlet of the intake structure so that water will not be flowing into the work area from the outlet conduit.
Site Visit Scheduled for Thursday, 27 August 2020 at 10:00am local time.
Construction duration will be 180 Calendar Days.
Estimated Magnitude of Construction is between $1,000,000 and $5,000,000.
All solicitation documents will be posted to the web via Beta SAM.gov (beta.sam.gov).
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Plunge Pool Repairs at Salt Creek, NE | Award Notice | |
| This notice | Solicitation | |
| Plunge Pool Repairs at Salt Creek, NE | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Lower brule north shoreline stabilization and ecosystem restoration, element 2 | ENDIST Omaha | Total Small Business | |
| Gusg habitat hydro-logic restoration 202 | Colorado Region | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity