PKA - Airfield Lighting Vault BB6
Closed Solicitation Posted
- Solicitation number
- FA442724Q0173
- Agency
- Air Mobility Command Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 335311 Power, Distribution, and Specialty Transformer Manufacturing
- Place of performance
- Fairfield, California 94534, United States
- Points of contact
-
- Brandon Spratt brandon.spratt.2@us.af.mil (707) 424-7743
- John De Pedro john_rexter.de_pedro@us.af.mil (707) 424-1793
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Air Force Air Mobility Command is seeking small businesses to replace all Constant Current Regulators with ACE 3 and upgrade the I/O ACES 3 for Control and Monitoring of Generator and Sequence Flashers at the Airfield Lighting Vault BB6 at Travis Air Force Base. The contractor must be able to perform all work to minimize airfield operation downtime and restore capabilities per mission requirements. The contract will be awarded on a best value basis, with technical factors being significantly more important than price. Quotes are due by September 24, 2024 at 2:30 PM PDT.
This is a total small business set-aside with a NAICS code of 335311 - Power, Distribution, and Specialty Transformer Manufacturing. The place of performance is Suisun City, CA 94534. The contract will involve replacing 10 4-30kW 5-step regulators, 29 4-30kW 3-step regulators, and installing 29 6.6 amp and 10 20 amp CVM2 units. The contractor must be licensed in the installation and programming of the ACE III boards.
Notice text
2 versions
Update #2 · Latest ·
Amendment 1 of this solicitation is to extend the response due date from 20 Sept 24 at 2:30 PM to 24 Sept 24 at 2:30 PM to provide addtiona time for interest contractors to submit a quote. Please see the attached Combo - Airfield Lighting Vault BB6 Amendment 1 for details.
The contractor shall replace all Constant Current Regulators with ACE 3 and upgrade the I/O ACES 3 for Control and Monitoring of Generator and Sequence Flashers at Travis Air Force Base (SUU). All work must be done to minimize airfield operation down time. Additionally, contractor must be able to restore capabilities to the airfield per mission requirements (See Statement of Work - Airfield Lighting Vault BB6 for more information).
Update #1 ·
The contractor shall replace all Constant Current Regulators with ACE 3 and upgrade the I/O ACES 3 for Control and Monitoring of Generator and Sequence Flashers at Travis Air Force Base (SUU). All work must be done to minimize airfield operation down time. Additionally, contractor must be able to restore capabilities to the airfield per mission requirements (See Statement of Work - Airfield Lighting Vault BB6 for more information).
Attachments
| File | Type | Posted |
|---|---|---|
| Combo - Airfield Lighting Vault BB6 Amendment 1.pdf | ||
| Combo - Airfield Lighting Vault BB6.pdf | ||
| Statement of Work - Airfield Lighting Vault BB6.pdf | ||
| Brand Name Justification - Airfield Lighting Vault BB6.pdf | ||
| TAFB Contract Security Clause June 2024.pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity