Statement of Work - Airfield Lighting Vault BB6.pdf
PDF 96 KB Posted
- Attached to
- PKA - Airfield Lighting Vault BB6 Federal contract opportunity
- Solicitation number
- FA442724Q0173
About this file
This document is a Statement of Work for upgrading the Constant Current Regulators and I/O ACES 3 Control and Monitoring system at the airfield lighting vault at Travis Air Force Base. The purpose of this project is to replace the existing obsolete ACE I and ACE II systems with the current ACE III system. The contractor will be responsible for installing the new ACE III hardware, including one I/O unit, ten 4-30kW 5-step regulators, and twenty-nine 4-30kW 3-step regulators, as well as twenty-nine 6.6 amp and ten 20 amp CVM2 units. The existing ACE software will also require modification to function with the new hardware. One onsite commissioning trip is included for upgrading the software, system cutover, and commissioning of the new ACE III Control and Monitoring system. All work must be performed between 0700-1600 Monday-Friday and minimize airfield downtime. The contractor must be licensed in the installation and programming of the ACE III boards.
This Statement of Work is related to Solicitation Number FA442724Q0173 issued by the Department of the Air Force Air Mobility Command for the PKA - Airfield Lighting Vault BB6 project. The contractor shall replace the Constant Current Regulators with ACE 3 and upgrade the I/O ACES 3 for Control and Monitoring of Generator and Sequence Flashers at Travis Air Force Base, with the goal of minimizing airfield operation downtime and restoring capabilities per mission requirements.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo - Airfield Lighting Vault BB6 Amendment 1.pdf | ||
| Brand Name Justification - Airfield Lighting Vault BB6.pdf | ||
| TAFB Contract Security Clause June 2024.pdf | ||
| Combo - Airfield Lighting Vault BB6.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
BLDG. 6
FOR
TRAVIS AFB, CA
13 September 2024
TITLE OF REQUIREMENT
60 CES/CEOFE has a requirement for UPGRADING THE ACE I AND ACE II CONSTANT CURRENT REGULATORS TO ACE III. The ACE I and ACE II systems are now obsolete.
Description: The purpose of this project is to replace all Constant Current Regulators with ACE 3 and upgrade the I/O ACES 3 for Control and Monitoring of Generator and Sequence Flashers at Travis Air Force Base (SUU). All work must be done to minimize airfield operation down time.
Additionally, contractor must be able to restore capabilities to the airfield per mission requirements.
HOURS OF OPERATION: All work will be performed between the hours of 0700 and 1600, Monday – Friday.
Replacement of Existing Constant Current Regulators System:
-One (1) - I/O, 95-265 VAC, 1 Inputs, 1 Outputs
-Ten (10) - FERRO SGRS Upgrade to ACE 3 – New Door, 4-30KW, 5 Step
-Twenty-nine (29) - FERRO SGRS Upgrade to ACE 3 – New Door, 4-30KW, 3 Step
- Twenty-nine (29) - 6.6 AMP CVM2
- Ten (10) - 20 AMP CVM2
The existing ACE software will have modifications made to function on the newly supplied hardware with the programming of new I/O ACE 3 Control and Monitoring system.
This project will include one (1) onsite commissioning trips for upgrading the ACE 3 software, system cutover and commissioning of the new ACE 3 Control and Monitoring of Generator and Sequence Flasher system.
Special Requirements: N/A
Qualifications/Certifications: Contractors must be licensed in the installation and programing of the ACE III boards.
File details come from the government source that posted it. Updated .