About this opportunity
The Department of Energy's Fermi National Accelerator Laboratory (Fermilab) is seeking contractors to perform modifications to the overhead door at the PIP-II Cryogenic Plant Building. The scope of work includes temporary protective measures, demolition and removal of existing components, installation of a new overhead coiling door with associated architectural and electrical work, and relocation of an existing personnel door and bollard. This is a pre-solicitation notice, so the final drawings and project manual may change. Subcontractors will be responsible for providing all required supervision, labor, materials, tools, and safety oversight to complete the construction work in compliance with Fermi Research Alliance's (FRA) environment, safety, and health requirements.
This procurement is set aside for small businesses. No incumbent or current contractor information is provided. The potential award value or budget range is not specified. The key numerical details are the project schedule milestones for material submittals, temporary weather protection, substantial completion, and final acceptance.
Notice text
THIS IS A DRAFT ONLY. PLEASE NOTE THAT THE ATTACHED DRAWINGS AND PROJECT MANUAL DOCUMENTS MAY CHANGE.
Scope of Work:Temporary Protective Measures including fire resistant partitions needed to provide weather protection during the demolition, reconfiguration and installation of the work associated with the work scope. Temporary partitions will be fire resistant construction and designed to secure the existing building during the work period.
Demolition including removal and reuse of metal siding panels, structural steel components, personnel door, removal of existing overhead coiling door and related work.
Architectural work including new coiling overhead door, guideways, tracks, flashings, closures and related accessories. This work includes installation of new metal stud framing components, waterproofing membrane, insulation and gypsum board. Also included is the removal and relocation of existing personnel door, jamb, trim and associated hardware.
Painting including new coiling overhead door, existing personnel door, new gypsum board and structural steel.
Relocation of existing bollard, bollard cover and foundation.
Electrical work including power connections to overhead coiling door, security systems, cable tray and related work, testing and connections.
Files
| File | Type | Posted |
|---|---|---|
| 4-3-3F Project Manual.pdf | ||
| 4-3-3F Drawings.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| PIP-II f-37 building LWC pump room piping system installation | Fermi National Accelerator Laboratory | No set-aside | |
| Wilson Hall Floor 16 Electric and Elevator Machine Rooms Fire Rating and Mechanical Upgrade | Fermi National Accelerator Laboratory | Total Small Business | |
| Central Utility Building Addition and Renovation Construction, UIP Subproject 1-CUB | Fermi National Accelerator Laboratory | No set-aside | |
| PIP-II CM 2K Reclosable Pressure Safety Relief Valves | Fermi National Accelerator Laboratory | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity