PHASE 1 - Notice of Solicitation of Submissions for Contractor Pre-Qualification for Selective Improvements Project Phase Two (SIP-2) in Copenhagen, Denmark
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 19AQMM24R0025
- Agency
-
Office of Acquisition Management
Department of State
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 23622 Commercial and Institutional Building Construction
- PSC
- Y1AA Construction Of Office Buildings
- Place of performance
- Denmark
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
Paragraph 1:
The U.S. Department of State (DOS), Bureau of Overseas Buildings Operations (OBO), is seeking submissions to pre-qualify firms for Design-Build Construction Services for the Selective Improvements Project, Phase Two (SIP-2) at the U.S. Chancery building in Copenhagen, Denmark. The project scope includes architectural upgrades, interior renovations, mechanical and plumbing upgrades, electrical upgrades, and fire alarm system upgrades. The contract is a Design-Build with an estimated construction cost of $20-$30 million. Offerors must demonstrate successful completion of a similar $14 million construction contract in the U.S. or at a U.S. diplomatic/consular mission, and must be a "United States Person" with a Top-Secret facility security clearance. Phase I pre-qualification submissions are due by 3:00 PM ET on May 15, 2024.
Paragraph 2:
This is a full and open competition, with no set-aside designation. The relevant NAICS code is likely 236220 (Commercial and Institutional Building Construction) and the PSC code is likely Y1DF (Construction of Buildings, Non-Residential). There is no information provided about potential incumbents or current contractors. The place of performance is Copenhagen, Denmark.
Notice text
PHASE 1 - Notice of Solicitation of Submissions for Contractor Pre-Qualification
THE U.S. DEPARTMENT OF STATE (DOS), Bureau of Overseas Buildings Operations (OBO) is requesting submissions to pre-qualify firms for Design-Build Construction Services for the Design-Build construction of the Selective Improvements Project, Phase Two (SIP-2) project in Copenhagen, Denmark. The Project is described below. OBO seeks to commission our nation’s top constructors to produce facilities of outstanding quality and value.
This project is available for full and open competition.
1. Project Description (Top-Secret Facility and Personnel Security Clearance Required)
19AQMM24R0025: Selective Improvements Project Phase Two (SIP-2) in Copenhagen, Denmark
The United States Government (USG), Department of State (DOS), Bureau of Overseas Building Operations (OBO) requires Design/Build services that include design and construction execution services for the Selective Improvements Project Phase Two (SIP-2) project in Copenhagen, Denmark, 19AQMM24R0025.
Property Description:
The Chancery is an existing roughly 5600 gross square meters (GSM) building consisting of four (4) full levels with a partial mezzanine level, and a penthouse. The building was completed in 1954 and has a glass and limestone façade. It is located on .23 hectares (.58 acres) in the Kobenhavs neighborhood. The official project address is Dag Hammarskjölds Allé 24, 2100 Copenhagen, Denmark. site is bounded along its perimeter by Dag Hammarskjölds Alle to the south, Garnison Cemetery to the east and north, and Villa Canada Residence to the west.
Project Scope:
SIP-2 is the second phase of the Selective Improvements Project, Phase 1 (SIP-1) completed in late 2023. The SIP-2 project scope includes the design/build construction of the following:
- Architectural Upgrades
- Façade Restoration
- The work will include limited replacement of cracked or deteriorating glass and stone panels, and all services necessary to fully restore the glass and aluminum window and limestone panels.
- Entry Courtyard waterproofing, and stone paver replacement.
- Façade Restoration
- Interior Upgrades
- Upgraded finishes throughout (paint, flooring, Ceilings, misc. door replacement, signage, window treatment)
- Multipurpose Room Upgrades and Reconfiguration.
- Management Office Upgrades and Reconfiguration.
- Main Lobby Upgrades
- Locker and Laundry room reconfiguration and upgrades
- Consular Waiting Room Upgrades
- Central Stair Upgrades and new safety guardrail
- Art Protection
- Physical Security Upgrades
- New Safe Area
- New FE Grilles at Consular Waiting
- FE/BR glass wall at Management Section
- Mechanical and Plumbing Upgrades
- Replacement of all existing heating water piping and radiators. Replacement of all existing chilled water piping and FCU’s and valve assemblies. Replacement of all existing chilled water piping and AHU’s valves assemblies in the penthouse.
- Replacement of sanitary/vent plumbing pipes for all 3rd floor toilets.
- Installation of heating circulating pumps with piping and valves assemblies at each AHU.
- Installation of 150 mm 3-way valve at the main heating system.
- Replacement of existing domestic hot water tank system and valve assemblies. Installation of Controls and Integration to the BAS system.
- Replacement of snow melt system in exterior entry courtyard.
- Replacement of various relief/exhaust fans with VFD and connect to the BAS system.
- Replace all waterless urinals with low water flow urinals, pipe and vent fixtures.
- Install trap guards on all floor drains (mechanical rooms and toilets).
- Electrical Upgrades
- Combine three incoming feeders.
- Power distribution upgrades and improvements.
- Backup power evaluation.
- Branch circuits replacement.
- Replace all non-LED lighting with LED fixtures.
- Remove all old and abandoned electrical wiring.
- Fire Alarm Upgrades
- Upgrade Fire Alarm system to meet NFPA 72 for a non-sprinklered building.
- Telecom Upgrades
- Suite Upgrades.
- Consular Section - Install new cabling in the waiting area to accommodate elements of the consular queuing system.
This is a Design-Build contract. The awarded contractor shall be provided with bridging documents that the contractor shall develop to 100% final design.
Approximate construction cost: $20-$30 million
NOTE: To demonstrate performance of similar construction work for Omnibus Diplomatic Security and Antiterrorism Act of 1986 purposes, the offeror needs to provide information demonstrating that it has successfully completed in the United States or at a U.S. diplomatic or consular mission a construction contract or subcontract involving work of the same general type and complexity as the solicited project and having a contract or subcontract value of at least $ 14,000,000.00. See the attached documernts.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Award of Selective Improvements Project Phase Two (SIP-2) in Copenhagen, Denmark | Award Notice | |
| This notice | Solicitation | |
| Selective Improvements Project Phase Two (SIP-2) In Copenhagen, Denmark | Pre-Solicitation | |
| Selective Improvements Project, Phase 2 (SIP-2) at the Embassy Complex in Copenhagen, Denmark | Pre-Solicitation |