P-224 CAUSEWAY, BOAT CHANNEL and TURNING BASIN AND P-226 AMMUNITION PIER NAVWPNSTA SEAL BEACH, CALIFORNIA

Closed Pre-Solicitation Posted

Solicitation number
N6247318R2243
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record
Place of performance
Nws Seal Beach Seal Beach, California, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Design-Bid-Build Project: MCON Project P-224 Causeway, Boat Channel, and Turning Basin: The work for this project includes dredging for a public boat channel, naval ship channel, and naval ship turning basin; excavation of above water moles, salvage and reuse of armor/riprap, paving, striping, signage, fencing, hauling and disposing of excess dredge material, placing fill for vehicle causeway and habitat enhancement; constructing rock breakwater, rock armor shore protection, security structure, and wharf improvements to support large deck amphibious ship ordnance operations. This project also includes relocating naval barge mooring buoys, installing marine navigation aids, utility infrastructure upgrades, communication infrastructure and security improvements. MCON Project P-226 Ammunition Pier: The work for this project includes dredging and placing fill for truck turn-around; constructing rock armor shore protection, pile supported ammunition pier, mooring dolphins, and several operations buildings to support dual ship naval ordnance operations. This project also includes utility infrastructure upgrades, communications systems installation, and security improvements, and demolishing buildings and wharf primary fendering system. Intended procurement method is Lowest Price Technically Acceptable (LPTA) Estimated cost is between $100,000,000 and $250,000,000
See NECO posting for solicitation SF1442 at:
https://www.neco.navy.mil/biz_ops/840-v5static.aspx?hkey=188591199.

Update #1 ·

Design-Bid-Build Project:
MCON Project P-224 Causeway, Boat Channel, and Turning Basin: The work for this project includes dredging for a public boat channel, naval ship channel, and naval ship turning basin; excavation of above water moles, salvage and reuse of armor/riprap, paving, striping, signage, fencing, hauling and disposing of excess dredge material, placing fill for vehicle causeway and habitat enhancement; constructing rock breakwater, rock armor shore protection, security structure, and wharf improvements to support large deck amphibious ship ordnance operations. This project also includes relocating naval barge mooring buoys, installing marine navigation aids, utility infrastructure upgrades, communication infrastructure and security improvements.
MCON Project P-226 Ammunition Pier: The work for this project includes dredging and placing fill for truck turn-around; constructing rock armor shore protection, pile supported ammunition pier, mooring dolphins, and several operations buildings to support dual ship naval ordnance operations. This project also includes utility infrastructure upgrades, communications systems installation, and security improvements, and demolishing buildings and wharf primary fendering system.
Intended procurement method is Lowest Price Technically Acceptable (LPTA)
Estimated cost is between $100,000,000 and $250,000,000
.

Files

File Type Posted
FFE_Summary_-_Final_no_costs.pdf PDF
01_30_02.00_20.pdf PDF
P226_FINAL_SUBMITTAL_129-210_Part_6_of_9.pdf PDF
P224_FINAL_SUBMITTAL_25-37_Part_3_of_12.pdf PDF
EMI_Final_Geotechnical_Design_Report_-_(Submitted_10-12-2018).pdf PDF
Final_Geotechnical_Data_Rpt_PART_1_(Submitted_10-12-18).pdf PDF
N6247318R2243_RFPattachments.zip ZIP file
P226_FINAL_SUBMITTAL_261-328_Part_8_of_9.pdf PDF
P224_FINAL_SUBMITTAL_38-104_Part_4_of_12.pdf PDF
P224_FINAL_SUBMITTAL_113-119_Part_6_of_12.pdf PDF
P226_FINAL_SUBMITTAL_119-128_Part_5_of_9.pdf PDF
P224_FINAL_SUBMITTAL_105-112_Part_5_of_12.pdf PDF
P226_FINAL_SUBMITTAL_1-19_Part_1_of_9.pdf PDF
P224_FINAL_SUBMITTAL_16-24_Part_2_of_12.pdf PDF
P224_FINAL_SUBMITTAL_210-226_Part_12_of_12.pdf PDF
P224_FINAL_SUBMITTAL_137-153_Part_9_of_12.pdf PDF
P224_FINAL_SUBMITTAL_170-209_Part_11_of_12.pdf PDF
P226_FINAL_SUBMITTAL_106-118_Part_4_of_9.pdf PDF
RFP_N6247318R2243_P224_AND_P226.pdf PDF
P226_FINAL_SUBMITTAL_211-260_Part_7_of_9.pdf PDF
P224_FINAL_SUBMITTAL_127-136_Part_8_of_12.pdf PDF
P226_FINAL_SUBMITTAL_329-428_Part_9_of_9.pdf PDF
P224_P226_Final_Specifications_2018_11_30.pdf PDF
Final_Geotechnical_Data_Rpt_PART_2_(Submitted_10-12-18).pdf PDF
P224_FINAL_SUBMITTAL_154-169_Part_10_of_12.pdf PDF
P226_FINAL_SUBMITTAL_71-105_Part_3_of_9.pdf PDF
P224_FINAL_SUBMITTAL_120-126_Part_7_of_12.pdf PDF
P226_FINAL_SUBMITTAL_20-70_Part_2_of_9.pdf PDF
P224_FINAL_SUBMITTAL_1-15_Part_1_of_12.pdf PDF
Show all 29

Notice history

Notice Type Posted
This notice Latest pre-solicitation Pre-Solicitation
MCON P-224 Ammunition Pier and Turning Basin NAVWPNSTA, Seal Beach, CA Original Pre-Solicitation