FFE_Summary_-_Final_no_costs.pdf

PDF 65 KB Posted

Attached to
P-224 CAUSEWAY, BOAT CHANNEL and TURNING BASIN AND P-226 AMMUNITION PIER NAVWPNSTA SEAL BEACH, CALIFORNIA
Solicitation number
N6247318R2243
Issued by

About this file

FFE_Summary_-_Final_no_costs document is provided as part of the RFP package.

View the file

Other files

File Type Posted
01_30_02.00_20.pdf PDF
P224_FINAL_SUBMITTAL_105-112_Part_5_of_12.pdf PDF
P226_FINAL_SUBMITTAL_211-260_Part_7_of_9.pdf PDF
P226_FINAL_SUBMITTAL_129-210_Part_6_of_9.pdf PDF
Final_Geotechnical_Data_Rpt_PART_1_(Submitted_10-12-18).pdf PDF
P224_FINAL_SUBMITTAL_210-226_Part_12_of_12.pdf PDF
P226_FINAL_SUBMITTAL_261-328_Part_8_of_9.pdf PDF
P226_FINAL_SUBMITTAL_1-19_Part_1_of_9.pdf PDF
P224_FINAL_SUBMITTAL_16-24_Part_2_of_12.pdf PDF
P224_FINAL_SUBMITTAL_25-37_Part_3_of_12.pdf PDF
N6247318R2243_RFPattachments.zip ZIP file
P224_FINAL_SUBMITTAL_38-104_Part_4_of_12.pdf PDF
P226_FINAL_SUBMITTAL_119-128_Part_5_of_9.pdf PDF
P224_FINAL_SUBMITTAL_113-119_Part_6_of_12.pdf PDF
P224_FINAL_SUBMITTAL_137-153_Part_9_of_12.pdf PDF
EMI_Final_Geotechnical_Design_Report_-_(Submitted_10-12-2018).pdf PDF
RFP_N6247318R2243_P224_AND_P226.pdf PDF
P224_FINAL_SUBMITTAL_170-209_Part_11_of_12.pdf PDF
P226_FINAL_SUBMITTAL_106-118_Part_4_of_9.pdf PDF
P224_FINAL_SUBMITTAL_154-169_Part_10_of_12.pdf PDF
Final_Geotechnical_Data_Rpt_PART_2_(Submitted_10-12-18).pdf PDF
P226_FINAL_SUBMITTAL_329-428_Part_9_of_9.pdf PDF
P226_FINAL_SUBMITTAL_71-105_Part_3_of_9.pdf PDF
P224_P226_Final_Specifications_2018_11_30.pdf PDF
P224_FINAL_SUBMITTAL_127-136_Part_8_of_12.pdf PDF
P224_FINAL_SUBMITTAL_120-126_Part_7_of_12.pdf PDF
P224_FINAL_SUBMITTAL_1-15_Part_1_of_12.pdf PDF
P226_FINAL_SUBMITTAL_20-70_Part_2_of_9.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVAL FACILITIES ENGINEERING COMMAND SOUTHWEST

FURNITURE, FIXTURES & EQUIPMENT (FF&E) SUMMARY FINAL

BASE: NAVAL FACILITIES ENGINEERING COMMAND SOUTHWEST

PROJECT: FY19 MCON PROJECT P-226, AMMUNITION PIER DATE: 30-Oct-18

CODE PAGE QTY ITEM DESCRIPTION MANUFACTURER UNIT COST TOTAL

Packaged Vendor BPA #

WS-1 2 6 FREESTANDING WORKSTATION STEELCASE

WS-2 4 2 LABEL STATION STEELCASE

WS-3 6 3 COPIER STATION STEELCASE

C-1 8 10 TASK CHAIRS STEELCASE

C-2 9 32 DINING CHAIRS STEELCASE

ST-1 10 5 LATERAL FILES W/ WORKTOP STEELCASE

ST-2 11 4 LOCKED FILES STEELCASE

ST-3 12 1 RADIO SHELVING UNIT STEELCASE

ST-4 13 1 COAT STORAGE STEELCASE

ST-5 14 10 LOCKERS STEELCASE

T-1 15 8 DINING TABLE STEELCASE

EX-1 16 1 PICNIC TABLE LEISURE CRAFT, INC.

EX-2 17 2 OUTDOOR TRASH W/ ASH TRAY GRAINGER

E-1 18 1 SHREDDER HSM

E-2 19 2 MICROWAVE WARING

E-3 20 1 COFFEE MAKER KEURIG

AC-1 21 2 REFRIDGERATOR FRIGIDAIRE

AC-2 22 1 TRASH RECYCLING UNIT PETER PEPPER

AC-3 23 8 PERSONAL TRASH CANS RUBBERMAID

AC-4 24 4 BATTERY-OPERATED CLOCK SKILLCRAFT

AC-5 25 1 MAGNETIC WHITEBOARD PETER PEPPER

AC-6 26 1 SMALL WALL-MOUNTED TACKBOARD PETER PEPPER

AC-7 27 1 BREAK ROOM TACKBOARD PETER PEPPER

AC-8 28 1 GLASS-ENCLOSED TACKBOARD PETER PEPPER

AC-9 29 2 COPY AREA TACKBOARD PETER PEPPER

Subtotal

1 FREIGHT PETER PEPPER

1 FREIGHT SALBURY

1 FREIGHT LEISURE CRAFT, INC.

1 GSA INSTALLATION

Subtotal FF&E

Total FF&E

HAR (up to 5%)

Grand Total FF&E