OR FS FREWN602 28(1), Road 28 Reconstruction
Pre-Solicitation Posted
- Solicitation number
- 69056727B000001
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Not on record
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Silver Lake, Oregon, United States
- Points of contact
-
- Contracts G. Office wfl.construction@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration intends to solicit bids for the OR FS FREWN602 28(1) Road 28 Reconstruction on a Total Small Business set-aside, with a tentative solicitation date in January/February 2027. The project covers full depth reclamation, aggregate surfacing, and drainage on a forest road approximately six miles south of Silver Lake, Lake County, Oregon, within the Fremont-Winema National Forest. The estimated price range is $5 million to $10 million.
The base scope is approximately 8.3 miles of reconstruction. Option X adds 3.4 miles of full depth reclamation, Option Y adds 14.1 miles, and Option Z adds 7.5 miles of minor asphalt patches. Tentative fixed completion dates are July 2027 for the base and Option X, August 2027 for Option Z, and September 2027 for Option Y. Attachment summaries list full depth reclamation quantities of 35,700 to 107,000 square yards, calcium chloride-treated aggregate surface course of 9,100 to 26,400 tons, and temporary traffic control with flaggers of 120 to 600 hours, with quantities varying by scope. The preliminary letter also references minor bridge work.
All material sources and incorporated materials must be certified free from noxious weeds, invasive plants, and deleterious materials by a federal, state, or local public agency. Commercial certifications are acceptable if obtained through the North American Weed Free Forage Program standard or an equivalent recognized process. Contractors must arrange fall weed inspections.
Offerors are strongly encouraged to conduct site visits in fall 2026, before winter snow limits access. No Federal Highway Administration personnel will provide guided tours. Preliminary plans and the project letter are available only in electronic format on SAM.gov. The Interested Vendors List is viewable only by users linked to an active UEI with an assigned role, and the government maintains no separate plan holders list. Technical questions go to wfl.plansspec@dot.gov. General inquiries go to wfl.contracts@dot.gov or 360-619-7520.
Notice text
OR FS FREWN602 28(1), Road 28 Reconstruction
Total Small Business Set-Aside
This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
- Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
- Option X: includes an additional 3.4 miles of full depth reclamation
- Option Y: includes an additional 14.1 miles of full depth reclamation
- Option Z: includes 7.5 miles of minor asphalt patches.
Project Location: This project is located approximately six miles south of Silver Lake, OR.
Estimated Price Range: Between $5,000,000 and $10,000,000
Tentative Solicitation Date: January/February 2027
Tentative Fixed Completion Date:
- Base: July 2027
- Option X: July 2027
- Option Y: September 2027
- Option Z: August 2027
INTERESTED VENDORS LIST: The Interested Vendor List on SAM.gov is viewable only by users who are linked to an entity with an active Unique Entity Identifier (UEI) and hold an assigned role (such as Contract Opportunities Administrator, Data Viewer, or Data Entry). The Federal Government does not maintain or provide a separate plan holders list. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (IFB) (specifications and plans) will be posted at this link.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Pre-Solicitation | |
| Sources Sought for OR FS FREWN602 28(1), Road 28 Reconstruction | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Geotechnical Drilling Services for Project OR FLAP DOUGLAS 251(2), Winchester Bridge Replacement | Federal Highway Administration | Total Small Business | |
| USFS, Dakota Prairie Grasslands, Little Missouri NG Road Maintenance | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| AZ BL COLO 7528(1) Burro Creek Road | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity