This is a federal construction solicitation document for a road reconstruction project. The U.S. Forest Service is soliciting bids for OR FS FREWN602 28(1), Road 28 Reconstruction located approximately six miles south of Silver Lake, Lake County, Oregon. The project involves full depth reclamation of existing roadway, aggregate surfacing, and drainage work. The base contract covers approximately 8.3 miles of reconstruction with three optional contract line items: Option X adds 3.4 miles, Option Y adds 14.1 miles, and Option Z includes 7.5 miles of minor asphalt patches. The estimated price range is between $5,000,000 and $10,000,000, with a tentative solicitation date of January/February 2027. Completion dates vary by scope: Base and Option X target July 2027, Option Y targets September 2027, and Option Z targets August 2027.
The work specifications are organized by division and include construction survey and staking, contractor quality control and assurance, sampling and testing, soil erosion and sediment control, earthwork, slope reinforcement, aggregate and base courses, asphalt pavement patching, bridge work, and incidental construction. Key work items include full depth reclamation (ranging from 35,700 to 107,000 square yards depending on scope), stabilized aggregate surface course with calcium chloride (9,100 to 26,400 tons), sign removal, temporary traffic control with flaggers (120 to 600 hours), rental equipment, and general labor. The document specifies measurements in U.S. customary units and references FP-24 specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim letter_OR FS FREWN602 28(1).pdf | ||
| pre-ad Plans_OR FS FREWN602 28(1).pdf | ||
| Prelim letter_OR FS FREWN602 28(1).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OR FS FREWN602 28(1), Road 28 Reconstruction
Lake County, Oregon
This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
• Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage.
• Option X: includes an additional 3.4 miles of full depth reclamation
• Option Y: includes an additional 14.1 miles of full depth reclamation
• Option Z: includes 7.5 miles of minor asphalt patches.
Project Location: This project is located approximately six miles south of Silver Lake, OR.
Estimated Price Range: Between $5,000,000 and $10,000,000
Tentative Solicitation Date: January/February 2027
Tentative Fixed Completion Date:
• Base: July 2027
• Option X: July 2027
• Option Y: September 2027
• Option Z: August 2027
DESCRIPTION OF WORK in US CUSTOMARY UNITS
USING FP-24 SPECS
S ch
N a m e
B
A S
E
O p ti o n
X ti
Y ti
Z
DIVISION 150 – Project Requirements
152 Construction Survey & Staking
(yes/no)
Yes
Yes
N a
A S
E ti ti ti
153 Contractor Quality Control and
Assurance
(yes/no) Yes Yes
154 Contractor Sampling & Testing
155 Schedules for Construction Contracts
(construction schedules)
157 Soil Erosion & Sediment Control
(Fiber Roll) 200 LNFT
158 Watering for dust control LPSM LPSM LPSM LPSM
DIVISION 200 – Earthwork
203 Removal of Sign 17 Each
4 each 16 each 5 each
204 Subexcavation 580 CUYD
204 Select Borrow 1130 CUYD
DIVISION 250 – Slope
Reinforcement and Retaining Walls
251 placed Riprap, class 2 15 CUYD
DIVISION 300 – Aggregate and
Base Courses
302 Roadway Agg 135 Ton 20 Ton
110 TON
30402-5200 Full depth reclamation, method 2, 4-inch depth
107000
SQYD
35700
SQYD
87500
SQYD
31103-3000 Stabilized aggregate surface course, calcium chloride 26400 TON 9100 TON
21300 TON
N a
A S
E ti ti ti
31110-0000 calcium chloride
450 TON 155 TON
360 TON
DIVISION 400 – Asphalt pavements and surface treatments
418 Asphalt Concrete pavement patch, type 2
730 SQYD
DIVISION 550 – Bridge Construction
579 Minor Bridge Work LPSM
Division 600 – Incidental Construction
622 – Rental Equipment Yes Yes Yes Yes
623 – General Labor Yes Yes Yes Yes
633 – Sign System 106 SQFT 50 SQFT 89 SQFT 67 SQFT
635 – Temporary Traffic Control, (Devices) LPSM LPSM
LPSM LPSM
635 – Temporary Traffic Control, Traffic
Control Supervisor LPSM LPSM
LPSM LPSM
635 – Temporary Traffic Control, Flagger 600 HR 120 HR