This is a federal construction solicitation document for a road reconstruction project. The U.S. Forest Service is soliciting bids for OR FS FREWN602 28(1), Road 28 Reconstruction located approximately six miles south of Silver Lake, Lake County, Oregon. The project involves full depth reclamation of existing roadway, aggregate surfacing, and drainage work. The base contract covers approximately 8.3 miles of reconstruction with three optional contract line items: Option X adds 3.4 miles, Option Y adds 14.1 miles, and Option Z includes 7.5 miles of minor asphalt patches. The estimated price range is between $5,000,000 and $10,000,000, with a tentative solicitation date of January/February 2027. Completion dates vary by scope: Base and Option X target July 2027, Option Y targets September 2027, and Option Z targets August 2027.

The work specifications are organized by division and include construction survey and staking, contractor quality control and assurance, sampling and testing, soil erosion and sediment control, earthwork, slope reinforcement, aggregate and base courses, asphalt pavement patching, bridge work, and incidental construction. Key work items include full depth reclamation (ranging from 35,700 to 107,000 square yards depending on scope), stabilized aggregate surface course with calcium chloride (9,100 to 26,400 tons), sign removal, temporary traffic control with flaggers (120 to 600 hours), rental equipment, and general labor. The document specifies measurements in U.S. customary units and references FP-24 specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OR FS FREWN602 28(1), Road 28 Reconstruction

Lake County, Oregon

This work consists of full depth reclamation of the existing roadway, aggregate surfacing and drainage.

• Base: will reconstruct approximately 8.3 miles of full depth reclamation of the existing roadway, aggregate surfacing and drainage.

• Option X: includes an additional 3.4 miles of full depth reclamation

• Option Y: includes an additional 14.1 miles of full depth reclamation

• Option Z: includes 7.5 miles of minor asphalt patches.

Project Location: This project is located approximately six miles south of Silver Lake, OR.

Estimated Price Range: Between $5,000,000 and $10,000,000

Tentative Solicitation Date: January/February 2027

Tentative Fixed Completion Date:

• Base: July 2027

• Option X: July 2027

• Option Y: September 2027

• Option Z: August 2027

DESCRIPTION OF WORK in US CUSTOMARY UNITS

USING FP-24 SPECS

S ch

N a m e

B

A S

E

O p ti o n

X ti

Y ti

Z

DIVISION 150 – Project Requirements

152 Construction Survey & Staking

(yes/no)

Yes

Yes

N a

A S

E ti ti ti

153 Contractor Quality Control and

Assurance

(yes/no) Yes Yes

154 Contractor Sampling & Testing

155 Schedules for Construction Contracts

(construction schedules)

157 Soil Erosion & Sediment Control

(Fiber Roll) 200 LNFT

158 Watering for dust control LPSM LPSM LPSM LPSM

DIVISION 200 – Earthwork

203 Removal of Sign 17 Each

4 each 16 each 5 each

204 Subexcavation 580 CUYD

204 Select Borrow 1130 CUYD

DIVISION 250 – Slope

Reinforcement and Retaining Walls

251 placed Riprap, class 2 15 CUYD

DIVISION 300 – Aggregate and

Base Courses

302 Roadway Agg 135 Ton 20 Ton

110 TON

30402-5200 Full depth reclamation, method 2, 4-inch depth

107000

SQYD

35700

SQYD

87500

SQYD

31103-3000 Stabilized aggregate surface course, calcium chloride 26400 TON 9100 TON

21300 TON

N a

A S

E ti ti ti

31110-0000 calcium chloride

450 TON 155 TON

360 TON

DIVISION 400 – Asphalt pavements and surface treatments

418 Asphalt Concrete pavement patch, type 2

730 SQYD

DIVISION 550 – Bridge Construction

579 Minor Bridge Work LPSM

Division 600 – Incidental Construction

622 – Rental Equipment Yes Yes Yes Yes

623 – General Labor Yes Yes Yes Yes

633 – Sign System 106 SQFT 50 SQFT 89 SQFT 67 SQFT

635 – Temporary Traffic Control, (Devices) LPSM LPSM

LPSM LPSM

635 – Temporary Traffic Control, Traffic

Control Supervisor LPSM LPSM

LPSM LPSM

635 – Temporary Traffic Control, Flagger 600 HR 120 HR