OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
Closed Solicitation Posted
- Solicitation number
- 69056726B000009
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Hood River, Oregon, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration sought sealed bids for construction of the Historic Columbia River Highway State Trail from Mitchell Point Drive to Ruthton Trailhead, with bids due October 21, 2026. This is a Total Small Business set-aside. Bids closed on October 21 with six contractors participating; MJ Hughes Construction submitted the lowest bid of $6,999,784.97 against an Engineer's Estimate of $9,171,291.08.
Place of performance is Hood River, Oregon. The project encompasses comprehensive trail development and restoration including site mobilization, erosion control, roadway excavation, asphalt concrete pavement installation, drainage systems, structural concrete work, riprap placement, guardrail and barrier installation, stone masonry, signage, and temporary traffic control. A centerpiece of the scope is a large precast concrete arch culvert (100 feet 1 inch in length) with precast wingwalls and headwalls beneath I-84. The NAICS code is 237310, Highway, Street, and Bridge Construction.
The procurement is issued under the Federal Lands Access Program (FLAP) funding mechanism. Solicitation No. 69056726B000009 includes an Invitation for Bids, construction plans (ora-dot-crgnsa100-7_plans.pdf), Physical Data.zip containing geotechnical reports, and Construction Contract Administration Document per FAR 36.211. Amendment A001, effective October 14, revised plan sheet H.1 showing the I-84 Undercrossing structural design with specific elevation and foundation fill details. Questions and Answers documents posted October 8 and October 14 clarified that tunnel illumination is excluded from scope, footing design requires minimum one-foot cover between trail finish grade and footing top (with final design at contractor discretion), and the full geotechnical report is available in Physical Data.zip. Bid Tabulation posted October 22 documents all six bids ranging from $6,999,784.97 to $15,633,900.00.
Notice text
5 versions
Update #5 · Latest ·
Update 10/22/2026: Bid Tabulations posted to attachments.
Update 10/21/2026: Bid Summary posted to attachments.
Update 10/14/2026: Amendment A001 and QA_10.14.2026.pdf posted to attachments.
Update 10/8/2026: QA_10.8.2026.pdf posted to attachments.
Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Update #4 ·
Update 10/21/2026: Bid Summary posted to attachments.
Update 10/14/2026: Amendment A001 and QA_10.14.2026.pdf posted to attachments.
Update 10/8/2026: QA_10.8.2026.pdf posted to attachments.
Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Update #3 ·
Update 10/14/2026: Amendment A001 and QA_10.14.2026.pdf posted to attachments.
Update 10/8/2026: QA_10.8.2026.pdf posted to attachments.
Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Update #2 ·
Update 10/8/2026: QA_10.8.2026.pdf posted to attachments.
Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Update #1 ·
Invitation for Bids (IFB) for construction project OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
The Invitation for Bids (IFB), Plans, Physical Data, and the Construction Contract Administration Document per FAR 36.211 are posted under attachments.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity