This is a Bid Tabulation Report for a federal construction project titled "Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead" (Project No. OR FLAP DOT CRGNSA 100(7), Solicitation No. 69056726B000009). The project is located in Hood River County, Oregon, within the Columbia River Gorge National Scenic Area and is managed by the Western Federal Lands division. The bid opening occurred on October 21, 2026, at the WFLHD Vancouver, WA office. Six contractors submitted bids for the base schedule: Central Southern Construction Corp. ($15,633,900.00), Cascade Civil Corp ($8,195,105.50), Crestline Construction Co. LLC ($7,990,242.50), Conway Construction Co ($7,694,396.38), Westech Construction, Inc. ($7,489,129.76), and MJ Hughes Construction ($6,999,784.97). The Engineer's Estimate was $9,171,291.08. The report was generated on October 22, 2026, by Rebekah Webb and certified by Marino Chea.

The project encompasses comprehensive trail development and restoration work including site mobilization, quality control, erosion control measures, roadway excavation, asphalt concrete pavement installation, drainage systems, structural concrete work, riprap placement, guardrail and barrier installation, stone masonry, signage systems, pavement markings, and temporary traffic control devices. Line items detail unit prices and total amounts for over 100 distinct work categories ranging from small incidental items (e.g., delineators at $45-$215 each) to major construction elements (e.g., large precast concrete arch culverts at $10,074-$19,500 per linear foot). The work also includes environmental design features such as dry swales for stormwater management. Pricing appears to be on a firm fixed-price basis with quantities and unit rates specified for each pay item, allowing for detailed cost comparison across all bidders.

View the file

Other files

File Type Posted
BidSum_OR FLAP DOT CRGNSA 100(7).pdf PDF
Amendment A001.pdf PDF
QA_10.14.2026.pdf PDF
QA_10.8.2026.pdf PDF
ora-dot-crgnsa100-7_plans.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF
IFB_69056726B000009_OR FLAP DOT CRGNSA 100(7).pdf PDF
Physical Data.zip ZIP file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TABULATION REPORT

Project No. : OR FLAP DOT CRGNSA 100(7) Project Name: Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead

Contractor Responsive? Base Schedule A Central Southern Construction Corp. $15,633,900.00

Cascade Civil Corp $8,195,105.50 Crestline Construction Co. LLC $7,990,242.50 Conway Construction Co $7,694,396.38 Westech Construction, Inc. $7,489,129.76 MJ Hughes Construction $6,999,784.97 Engineer's Estimate $9,171,291.08

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Generated by : Rebekah Webb

Project No. : OR FLAP DOT

CRGNSA 100(7)

Project Name: Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead

Division: Western Federal Lands

Schedule: A Schedule Type: Base Lead Designer:

Solicitation No. : 69056726B000009 Opened at: WFLHD Vancouver, WA

Opened by: Marino Chea

State: OR County: Hood River Federal Land: Columbia River

Gorge National Scenic Area

Bid Open Date and Time: 10/21/2026

Contract Awarded to: Award Date:

Contractor Comment Bid Amount Responsive Central Southern Construction Corp., 119 Sewald Street, Jacksonville, FL, 32204

$15,633,900.00

Cascade Civil Corp, 255 SE Black Butte Blvd., Redmond, OR, 97756

$8,195,105.50

Crestline Construction Co. LLC, 3600 Crates Way #100, The Dalles, OR, 97058

$7,990,242.50

Conway Construction Co, 6620 NW Whitney Rd. Suite 100, Vancouver, WA, 98665

$7,694,396.38

I certify that this Bid Tabulation reflects the offers received for this solicitation

Signed:

Title:

Date:

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

Westech Construction, Inc., 2204 NE 194th Ave, Portland, OR, 97230

$7,489,129.76

MJ Hughes Construction, 11510 NE 87th Ave, Vancouver, WA, 98662

$6,999,784.97

Engineer's Estimate $9,171,291.08

Project No. : OR FLAP DOT CRGNSA 100(7) Project Name: Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead

Schedule: A Schedule Type: Base

Line Item Number

Pay Item Number Description Contractor Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION Central Southern Construction Corp. $1,300,000.00

Westech Construction, Inc. $1,170,769.65

Cascade Civil Corp $815,000.00 Conway Construction Co $760,000.00

MJ Hughes Construction $680,000.00

Crestline Construction Co. LLC $555,000.00

Engineer's Estimate ALL LPSM LPSM $982,638.33

A0040 15201-0000 CONSTRUCTION

SURVEY AND

STAKING

Central Southern Construction Corp. $750,000.00

Cascade Civil Corp $120,000.00 Conway Construction Co $115,000.00

Westech Construction, Inc. $97,763.09

MJ Hughes Construction $95,000.00

Crestline Construction Co. LLC $92,000.00

Engineer's Estimate ALL LPSM LPSM $101,000.00

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

Central Southern Construction Corp. $950,000.00

Cascade Civil Corp $325,000.00 MJ Hughes Construction $250,000.00

Westech Construction, Inc. $239,963.95

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL

Conway Construction Co $225,000.00

Crestline Construction Co. LLC $153,000.00

Engineer's Estimate ALL LPSM LPSM $233,000.00

A0080 15401-0000 CONTRACTOR

TESTING

Central Southern Construction Corp. $650,000.00

MJ Hughes Construction $135,000.00

Cascade Civil Corp $130,000.00 Conway Construction Co $90,000.00

Westech Construction, Inc. $55,547.21

Crestline Construction Co. LLC $51,000.00

Engineer's Estimate ALL LPSM LPSM $78,000.00

A0100 15501-0000 CONSTRUCTION

SCHEDULE

Cascade Civil Corp $55,000.00 Central Southern Construction Corp. $50,000.00

MJ Hughes Construction $20,000.00

Crestline Construction Co. LLC $12,000.00

Conway Construction Co $10,000.00

Westech Construction, Inc. $5,554.72

Engineer's Estimate ALL LPSM LPSM $16,000.00

A0120 15702-6000 SOIL EROSION

CONTROL,

TEMPORARY

STORMWATER

DIVERSION

MJ Hughes Construction $115,000.00

Central Southern Construction Corp. $90,000.00

Crestline Construction Co. LLC $35,000.00

Westech Construction, Inc. $20,932.63

Cascade Civil Corp $10,000.00 Conway Construction Co $2,500.00

Engineer's Estimate ALL LPSM LPSM $42,000.00

A0140 15703-2500 SOIL EROSION

CONTROL,

MULCHING,

HYDRAULIC

METHOD

Central Southern Construction Corp. 5.300 $3,500.00 $18,550.00

Westech Construction, Inc. 5.300 $3,332.83 $17,664.00

MJ Hughes Construction 5.300 $3,280.00 $17,384.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0140 15703-2500 SOIL EROSION

CONTROL,

MULCHING,

HYDRAULIC

METHOD

Cascade Civil Corp 5.300 $3,000.00 $15,900.00 Crestline Construction Co. LLC 5.300 $2,400.00 $12,720.00

Conway Construction Co 5.300 $2,200.00 $11,660.00

Engineer's Estimate 5.300 ACRE $3,640.00 $19,292.00

A0160 15705-0100 SOIL EROSION

CONTROL, SILT

FENCE

Central Southern Construction Corp. 5,250.000 $12.00 $63,000.00

Crestline Construction Co. LLC 5,250.000 $6.00 $31,500.00

Westech Construction, Inc. 5,250.000 $5.43 $28,507.50

Conway Construction Co 5,250.000 $5.20 $27,300.00

MJ Hughes Construction 5,250.000 $4.60 $24,150.00

Cascade Civil Corp 5,250.000 $4.20 $22,050.00 Engineer's Estimate 5,250.000 LNFT $5.10 $26,775.00

A0180 15705-1400 SOIL EROSION

CONTROL, FIBER

ROLL

Central Southern Construction Corp. 1,950.000 $15.00 $29,250.00

Crestline Construction Co. LLC 1,950.000 $10.00 $19,500.00

Conway Construction Co 1,950.000 $6.00 $11,700.00

MJ Hughes Construction 1,950.000 $5.90 $11,505.00

Westech Construction, Inc. 1,950.000 $5.53 $10,783.50

Cascade Civil Corp 1,950.000 $5.50 $10,725.00 Engineer's Estimate 1,950.000 LNFT $6.10 $11,895.00

A0200 15706-0200 SOIL EROSION

CONTROL, CHECK

DAM (TEMPORARY,

FILTER ROCK)

Central Southern Construction Corp. 55.000 $1,100.00 $60,500.00

Crestline Construction Co. LLC 55.000 $550.00 $30,250.00

Cascade Civil Corp 55.000 $344.00 $18,920.00 Westech Construction, Inc. 55.000 $223.64 $12,300.20

Conway Construction Co 55.000 $210.00 $11,550.00

MJ Hughes Construction 55.000 $16.40 $902.00

Engineer's Estimate 55.000 EACH $431.00 $23,705.00

A0220 15706-1200 SOIL EROSION

CONTROL, INLET

PROTECTION TYPE

B

Central Southern Construction Corp. 4.000 $500.00 $2,000.00

Westech Construction, Inc. 4.000 $420.73 $1,682.92

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0220 15706-1200 SOIL EROSION

CONTROL, INLET

PROTECTION TYPE

B

Conway Construction Co 4.000 $200.00 $800.00

Crestline Construction Co. LLC 4.000 $130.00 $520.00

Cascade Civil Corp 4.000 $112.00 $448.00 MJ Hughes Construction 4.000 $100.00 $400.00

Engineer's Estimate 4.000 EACH $204.00 $816.00

A0240 15706-1300 SOIL EROSION

CONTROL, INLET

PROTECTION TYPE

C

Central Southern Construction Corp. 5.000 $500.00 $2,500.00

Westech Construction, Inc. 5.000 $215.11 $1,075.55

Crestline Construction Co. LLC 5.000 $200.00 $1,000.00

MJ Hughes Construction 5.000 $170.00 $850.00

Conway Construction Co 5.000 $110.00 $550.00

Cascade Civil Corp 5.000 $90.00 $450.00 Engineer's Estimate 5.000 EACH $204.00 $1,020.00

A0260 15706-1600 SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION

EXIT

Conway Construction Co 6.000 $5,100.00 $30,600.00

Central Southern Construction Corp. 6.000 $5,000.00 $30,000.00

MJ Hughes Construction 6.000 $4,750.00 $28,500.00

Westech Construction, Inc. 6.000 $4,718.56 $28,311.36

Cascade Civil Corp 6.000 $3,200.00 $19,200.00 Crestline Construction Co. LLC 6.000 $1,850.00 $11,100.00

Engineer's Estimate 6.000 EACH $3,060.00 $18,360.00

A0280 20101-0000 CLEARING AND

GRUBBING

Conway Construction Co 1.900 $48,000.00 $91,200.00

Central Southern Construction Corp. 1.900 $45,000.00 $85,500.00

Cascade Civil Corp 1.900 $30,000.00 $57,000.00 Westech Construction, Inc. 1.900 $29,447.82 $55,950.86

MJ Hughes Construction 1.900 $21,300.00 $40,470.00

Crestline Construction Co. LLC 1.900 $19,000.00 $36,100.00

Engineer's Estimate 1.900 ACRE $55,000.00 $104,500.00 A0300 20301-1400 REMOVAL OF INLET Central Southern

Construction Corp. 4.000 $1,500.00 $6,000.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0300 20301-1400 REMOVAL OF INLET Conway Construction Co 4.000 $1,000.00 $4,000.00

MJ Hughes Construction 4.000 $670.00 $2,680.00

Crestline Construction Co. LLC 4.000 $625.00 $2,500.00

Westech Construction, Inc. 4.000 $555.75 $2,223.00

Cascade Civil Corp 4.000 $425.00 $1,700.00 Engineer's Estimate 4.000 EACH $2,000.00 $8,000.00

A0320 20301-2400 REMOVAL OF SIGN Central Southern Construction Corp. 19.000 $250.00 $4,750.00

Crestline Construction Co. LLC 19.000 $225.00 $4,275.00

Westech Construction, Inc. 19.000 $158.44 $3,010.36

Cascade Civil Corp 19.000 $100.00 $1,900.00 Conway Construction Co 19.000 $100.00 $1,900.00

MJ Hughes Construction 19.000 $82.00 $1,558.00

Engineer's Estimate 19.000 EACH $255.00 $4,845.00 A0340 20302-0200 REMOVAL OF CURB Central Southern

Construction Corp. 1,155.000 $15.00 $17,325.00

Crestline Construction Co. LLC 1,155.000 $13.00 $15,015.00

MJ Hughes Construction 1,155.000 $6.80 $7,854.00

Cascade Civil Corp 1,155.000 $4.00 $4,620.00 Westech Construction, Inc. 1,155.000 $3.43 $3,961.65

Conway Construction Co 1,155.000 $3.00 $3,465.00

Engineer's Estimate 1,155.000 LNFT $11.25 $12,993.75

A0360 20302-0700 REMOVAL OF

FENCE

Central Southern Construction Corp. 1,100.000 $10.00 $11,000.00

Cascade Civil Corp 1,100.000 $5.00 $5,500.00 Crestline Construction Co. LLC 1,100.000 $5.00 $5,500.00

Conway Construction Co 1,100.000 $4.00 $4,400.00

Westech Construction, Inc. 1,100.000 $2.24 $2,464.00

MJ Hughes Construction 1,100.000 $2.10 $2,310.00

Engineer's Estimate 1,100.000 LNFT $5.50 $6,050.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0380 20302-1200 REMOVAL OF

GUARDRAIL

Central Southern Construction Corp. 930.000 $20.00 $18,600.00

Westech Construction, Inc. 930.000 $10.55 $9,811.50

Cascade Civil Corp 930.000 $9.00 $8,370.00 MJ Hughes Construction 930.000 $6.55 $6,091.50

Conway Construction Co 930.000 $6.00 $5,580.00

Crestline Construction Co. LLC 930.000 $6.00 $5,580.00

Engineer's Estimate 930.000 LNFT $7.00 $6,510.00

A0400 20302-1400 REMOVAL OF

CONCRETE

BARRIER

Central Southern Construction Corp. 220.000 $70.00 $15,400.00

Westech Construction, Inc. 220.000 $56.47 $12,423.40

Conway Construction Co 220.000 $26.25 $5,775.00

Crestline Construction Co. LLC 220.000 $25.00 $5,500.00

Cascade Civil Corp 220.000 $24.00 $5,280.00 MJ Hughes Construction 220.000 $16.05 $3,531.00

Engineer's Estimate 220.000 LNFT $35.00 $7,700.00

A0420 20302-2100 REMOVAL OF PIPE

CULVERT

Central Southern Construction Corp. 120.000 $90.00 $10,800.00

Westech Construction, Inc. 120.000 $83.78 $10,053.60

Crestline Construction Co. LLC 120.000 $25.00 $3,000.00

Cascade Civil Corp 120.000 $21.00 $2,520.00 MJ Hughes Construction 120.000 $16.15 $1,938.00

Conway Construction Co 120.000 $15.00 $1,800.00

Engineer's Estimate 120.000 LNFT $60.00 $7,200.00

A0440 20304-1000 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(EXISTING

WINGWALLS /

HEADWALLS)

Central Southern Construction Corp. $260,000.00

Westech Construction, Inc. $46,397.76

Crestline Construction Co. LLC $37,000.00

Cascade Civil Corp $32,100.00 Conway Construction Co $30,000.00

MJ Hughes Construction $2,530.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0440 20304-1000 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(EXISTING

WINGWALLS /

HEADWALLS)

Engineer's Estimate ALL LPSM LPSM $5,000.00

A0460 20304-1000 REMOVAL OF

STRUCTURES AND

OBSTRUCTIONS

(NON-CLEAN

MATERIAL)

Cascade Civil Corp $125,000.00 Central Southern Construction Corp. $100,000.00

Crestline Construction Co. LLC $41,000.00

MJ Hughes Construction $29,600.00

Conway Construction Co $10,000.00

Westech Construction, Inc. $7,737.84

Engineer's Estimate ALL LPSM LPSM $61,000.00

A0480 20315-0000 SAWCUTTING

PAVEMENT

Cascade Civil Corp 8,100.000 $10.00 $81,000.00 Central Southern Construction Corp. 8,100.000 $7.00 $56,700.00

Crestline Construction Co. LLC 8,100.000 $6.00 $48,600.00

MJ Hughes Construction 8,100.000 $5.50 $44,550.00

Conway Construction Co 8,100.000 $4.00 $32,400.00

Westech Construction, Inc. 8,100.000 $3.33 $26,973.00

Engineer's Estimate 8,100.000 LNFT $5.00 $40,500.00

A0500 20401-0000 ROADWAY

EXCAVATION

Central Southern Construction Corp. 13,700.000 $90.00 $1,233,000.00

Crestline Construction Co. LLC 13,700.000 $47.00 $643,900.00

Westech Construction, Inc. 13,700.000 $43.27 $592,799.00

Cascade Civil Corp 13,700.000 $36.00 $493,200.00 MJ Hughes Construction 13,700.000 $32.00 $438,400.00

Conway Construction Co 13,700.000 $26.00 $356,200.00

Engineer's Estimate 13,700.000 CUYD $69.00 $945,300.00

A0520 20401-0000 ROADWAY

EXCAVATION (I-84)

Central Southern Construction Corp. 710.000 $175.00 $124,250.00

Cascade Civil Corp 710.000 $100.00 $71,000.00 Conway Construction Co 710.000 $71.00 $50,410.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0520 20401-0000 ROADWAY

EXCAVATION (I-84)

Westech Construction, Inc. 710.000 $62.74 $44,545.40

MJ Hughes Construction 710.000 $44.10 $31,311.00

Crestline Construction Co. LLC 710.000 $44.00 $31,240.00

Engineer's Estimate 710.000 CUYD $76.00 $53,960.00

A0540 20401-0000 ROADWAY

EXCAVATION

(TPAR)

Central Southern Construction Corp. 990.000 $110.00 $108,900.00

Conway Construction Co 990.000 $71.00 $70,290.00

Westech Construction, Inc. 990.000 $61.11 $60,498.90

Cascade Civil Corp 990.000 $52.00 $51,480.00 Crestline Construction Co. LLC 990.000 $44.00 $43,560.00

MJ Hughes Construction 990.000 $17.60 $17,424.00

Engineer's Estimate 990.000 CUYD $63.00 $62,370.00 A0560 20402-0000 SUBEXCAVATION Central Southern

Construction Corp. 125.000 $300.00 $37,500.00

Westech Construction, Inc. 125.000 $165.86 $20,732.50

Conway Construction Co 125.000 $122.00 $15,250.00

Crestline Construction Co. LLC 125.000 $111.00 $13,875.00

MJ Hughes Construction 125.000 $57.00 $7,125.00

Cascade Civil Corp 125.000 $50.00 $6,250.00 Engineer's Estimate 125.000 CUYD $69.00 $8,625.00

A0580 20466-0000 CONSERVE AND

STOCKPILE TOPSOIL

Cascade Civil Corp 470.000 $70.00 $32,900.00 Central Southern Construction Corp. 470.000 $35.00 $16,450.00

Crestline Construction Co. LLC 470.000 $35.00 $16,450.00

MJ Hughes Construction 470.000 $17.70 $8,319.00

Westech Construction, Inc. 470.000 $16.80 $7,896.00

Conway Construction Co 470.000 $10.00 $4,700.00

Engineer's Estimate 470.000 CUYD $20.00 $9,400.00 A0600 20470-0000 BOULDER Cascade Civil Corp 12.000 $1,875.00 $22,500.00

MJ Hughes Construction 12.000 $1,470.00 $17,640.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0600 20470-0000 BOULDER Central Southern Construction Corp. 12.000 $900.00 $10,800.00

Conway Construction Co 12.000 $800.00 $9,600.00

Westech Construction, Inc. 12.000 $390.55 $4,686.60

Crestline Construction Co. LLC 12.000 $255.00 $3,060.00

Engineer's Estimate 12.000 EACH $1,000.00 $12,000.00

A0620 20701-2000 SEPARATION

GEOTEXTILE, NON-

WOVEN

Central Southern Construction Corp. 2,100.000 $12.00 $25,200.00

Crestline Construction Co. LLC 2,100.000 $6.00 $12,600.00

Conway Construction Co 2,100.000 $3.25 $6,825.00

MJ Hughes Construction 2,100.000 $2.05 $4,305.00

Westech Construction, Inc. 2,100.000 $1.72 $3,612.00

Cascade Civil Corp 2,100.000 $1.25 $2,625.00 Engineer's Estimate 2,100.000 SQYD $6.00 $12,600.00

A0640 20701-2000 SEPARATION

GEOTEXTILE, NON-

WOVEN

(TEMPORARY)

Central Southern Construction Corp. 2,850.000 $12.00 $34,200.00

Crestline Construction Co. LLC 2,850.000 $6.00 $17,100.00

Conway Construction Co 2,850.000 $3.80 $10,830.00

MJ Hughes Construction 2,850.000 $2.05 $5,842.50

Westech Construction, Inc. 2,850.000 $1.79 $5,101.50

Cascade Civil Corp 2,850.000 $1.25 $3,562.50 Engineer's Estimate 2,850.000 SQYD $6.00 $17,100.00

A0660 20703-1200 GEOTEXTILE

FILTER, CLASS 1,

NON-WOVEN

Central Southern Construction Corp. 40.000 $200.00 $8,000.00

Cascade Civil Corp 40.000 $7.50 $300.00 Crestline Construction Co. LLC 40.000 $6.00 $240.00

Conway Construction Co 40.000 $5.00 $200.00

MJ Hughes Construction 40.000 $4.35 $174.00

Westech Construction, Inc. 40.000 $4.32 $172.80

Engineer's Estimate 40.000 SQYD $10.00 $400.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0680 20703-2200 GEOTEXTILE

FILTER, CLASS 2,

NON-WOVEN

Central Southern Construction Corp. 175.000 $20.00 $3,500.00

Crestline Construction Co. LLC 175.000 $6.00 $1,050.00

Cascade Civil Corp 175.000 $4.00 $700.00 Conway Construction Co 175.000 $3.60 $630.00

MJ Hughes Construction 175.000 $1.90 $332.50

Westech Construction, Inc. 175.000 $1.75 $306.25

Engineer's Estimate 175.000 SQYD $10.00 $1,750.00 A0700 20802-0000 FOUNDATION FILL Crestline

Construction Co. LLC 230.000 $175.00 $40,250.00

Central Southern Construction Corp. 230.000 $150.00 $34,500.00

Westech Construction, Inc. 230.000 $136.08 $31,298.40

Conway Construction Co 230.000 $107.00 $24,610.00

MJ Hughes Construction 230.000 $94.00 $21,620.00

Cascade Civil Corp 230.000 $85.00 $19,550.00 Engineer's Estimate 230.000 CUYD $250.00 $57,500.00

A0720 25101-0100 PLACED RIPRAP,

CLASS 1

Central Southern Construction Corp. 13.000 $400.00 $5,200.00

MJ Hughes Construction 13.000 $240.00 $3,120.00

Westech Construction, Inc. 13.000 $228.71 $2,973.23

Conway Construction Co 13.000 $200.00 $2,600.00

Crestline Construction Co. LLC 13.000 $187.00 $2,431.00

Cascade Civil Corp 13.000 $156.00 $2,028.00 Engineer's Estimate 13.000 CUYD $250.00 $3,250.00

A0740 25105-0200 KEYED RIPRAP,

CLASS 2

Central Southern Construction Corp. 75.000 $350.00 $26,250.00

Westech Construction, Inc. 75.000 $215.23 $16,142.25

Conway Construction Co 75.000 $200.00 $15,000.00

MJ Hughes Construction 75.000 $200.00 $15,000.00

Crestline Construction Co. LLC 75.000 $187.00 $14,025.00

Cascade Civil Corp 75.000 $161.00 $12,075.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0740 25105-0200 KEYED RIPRAP,

CLASS 2 Engineer's Estimate 75.000 CUYD $280.00 $21,000.00

A0760 30201-2000 ROADWAY

AGGREGATE,

METHOD 2

Westech Construction, Inc. 965.000 $130.86 $126,279.90

Central Southern Construction Corp. 965.000 $125.00 $120,625.00

Crestline Construction Co. LLC 965.000 $118.00 $113,870.00

Conway Construction Co 965.000 $103.00 $99,395.00

MJ Hughes Construction 965.000 $87.00 $83,955.00

Cascade Civil Corp 965.000 $70.00 $67,550.00 Engineer's Estimate 965.000 CUYD $130.00 $125,450.00

A0780 30201-2000 ROADWAY

AGGREGATE,

METHOD 2 (I-84)

Central Southern Construction Corp. 950.000 $135.00 $128,250.00

Westech Construction, Inc. 950.000 $127.27 $120,906.50

Crestline Construction Co. LLC 950.000 $118.00 $112,100.00

Cascade Civil Corp 950.000 $90.00 $85,500.00 Conway Construction Co 950.000 $77.00 $73,150.00

MJ Hughes Construction 950.000 $72.00 $68,400.00

Engineer's Estimate 950.000 CUYD $130.00 $123,500.00

A0800 30201-2000 ROADWAY

AGGREGATE,

METHOD 2

(TEMPORARY)

Conway Construction Co 630.000 $200.00 $126,000.00

Crestline Construction Co. LLC 630.000 $155.00 $97,650.00

Westech Construction, Inc. 630.000 $154.77 $97,505.10

Central Southern Construction Corp. 630.000 $120.00 $75,600.00

MJ Hughes Construction 630.000 $100.00 $63,000.00

Cascade Civil Corp 630.000 $65.00 $40,950.00 Engineer's Estimate 630.000 CUYD $163.00 $102,690.00

A0820 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

(I-84 TEMPORARY)

Central Southern Construction Corp. 485.000 $250.00 $121,250.00

Westech Construction, Inc. 485.000 $224.98 $109,115.30

Conway Construction Co 485.000 $194.00 $94,090.00

Crestline Construction Co. LLC 485.000 $185.00 $89,725.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0820 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

(I-84 TEMPORARY)

MJ Hughes Construction 485.000 $172.00 $83,420.00

Cascade Civil Corp 485.000 $171.00 $82,935.00 Engineer's Estimate 485.000 TON $243.00 $117,855.00

A0840 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

(I-84)

Central Southern Construction Corp. 800.000 $250.00 $200,000.00

Westech Construction, Inc. 800.000 $204.41 $163,528.00

Crestline Construction Co. LLC 800.000 $195.00 $156,000.00

Conway Construction Co 800.000 $193.00 $154,400.00

MJ Hughes Construction 800.000 $185.00 $148,000.00

Cascade Civil Corp 800.000 $184.00 $147,200.00 Engineer's Estimate 800.000 TON $200.00 $160,000.00

A0860 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

(TPAR)

Central Southern Construction Corp. 160.000 $250.00 $40,000.00

Westech Construction, Inc. 160.000 $240.26 $38,441.60

Conway Construction Co 160.000 $209.00 $33,440.00

Crestline Construction Co. LLC 160.000 $202.00 $32,320.00

MJ Hughes Construction 160.000 $178.00 $28,480.00

Cascade Civil Corp 160.000 $177.00 $28,320.00 Engineer's Estimate 160.000 TON $270.00 $43,200.00

A0880 40301-0100 ASPHALT

CONCRETE

PAVEMENT, TYPE 1

(TRAIL AND MPD)

Central Southern Construction Corp. 900.000 $250.00 $225,000.00

Westech Construction, Inc. 900.000 $199.97 $179,973.00

Crestline Construction Co. LLC 900.000 $195.00 $175,500.00

Conway Construction Co 900.000 $189.00 $170,100.00

MJ Hughes Construction 900.000 $181.00 $162,900.00

Cascade Civil Corp 900.000 $180.00 $162,000.00 Engineer's Estimate 900.000 TON $150.00 $135,000.00

A0900 40301-0200 ASPHALT

CONCRETE

PAVEMENT, TYPE 2

(RUMBLE STRIPS)

Westech Construction, Inc. 85.000 $275.51 $23,418.35

Crestline Construction Co. LLC 85.000 $265.00 $22,525.00

Conway Construction Co 85.000 $260.00 $22,100.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0900 40301-0200 ASPHALT

CONCRETE

PAVEMENT, TYPE 2

(RUMBLE STRIPS)

Central Southern Construction Corp. 85.000 $250.00 $21,250.00

MJ Hughes Construction 85.000 $250.00 $21,250.00

Cascade Civil Corp 85.000 $248.00 $21,080.00 Engineer's Estimate 85.000 TON $415.00 $35,275.00

A0920 40602-0000 FOG SEAL (MICRO

COAT)

Central Southern Construction Corp. 33,500.000 $5.00 $167,500.00

MJ Hughes Construction 33,500.000 $0.55 $18,425.00

Westech Construction, Inc. 33,500.000 $0.54 $18,090.00

Conway Construction Co 33,500.000 $0.52 $17,420.00

Cascade Civil Corp 33,500.000 $0.50 $16,750.00 Crestline Construction Co. LLC 33,500.000 $0.50 $16,750.00

Engineer's Estimate 33,500.000 SQYD $9.00 $301,500.00 A0940 41201-0000 TACK COAT Central Southern

Construction Corp. 1.700 $1,400.00 $2,380.00

Crestline Construction Co. LLC 1.700 $100.00 $170.00

Westech Construction, Inc. 1.700 $1.11 $1.89

MJ Hughes Construction 1.700 $1.10 $1.87

Cascade Civil Corp 1.700 $1.00 $1.70 Conway Construction Co 1.700 $1.00 $1.70

Engineer's Estimate 1.700 TON $800.00 $1,360.00

A0960 41201-0000 TACK COAT

(TEMPORARY)

Central Southern Construction Corp. 1.000 $1,400.00 $1,400.00

Crestline Construction Co. LLC 1.000 $100.00 $100.00

Westech Construction, Inc. 1.000 $1.11 $1.11

Cascade Civil Corp 1.000 $1.10 $1.10 MJ Hughes Construction 1.000 $1.10 $1.10

Conway Construction Co 1.000 $1.00 $1.00

Engineer's Estimate 1.000 TON $800.00 $800.00

A0980 41301-0600 ASPHALT

PAVEMENT

MILLING, 2-INCH

DEPTH (RUMBLE

STRIPS)

Central Southern Construction Corp. 700.000 $28.00 $19,600.00

Crestline Construction Co. LLC 700.000 $26.00 $18,200.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A0980 41301-0600 ASPHALT

PAVEMENT

MILLING, 2-INCH

DEPTH (RUMBLE

STRIPS)

Conway Construction Co 700.000 $25.00 $17,500.00

MJ Hughes Construction 700.000 $24.75 $17,325.00

Westech Construction, Inc. 700.000 $20.41 $14,287.00

Cascade Civil Corp 700.000 $14.50 $10,150.00 Engineer's Estimate 700.000 SQYD $20.00 $14,000.00

A1000 41301-0800 ASPHALT

PAVEMENT

MILLING, 3-INCH

DEPTH

Central Southern Construction Corp. 1,500.000 $35.00 $52,500.00

Westech Construction, Inc. 1,500.000 $13.96 $20,940.00

Conway Construction Co 1,500.000 $9.00 $13,500.00

Crestline Construction Co. LLC 1,500.000 $9.00 $13,500.00

MJ Hughes Construction 1,500.000 $8.80 $13,200.00

Cascade Civil Corp 1,500.000 $8.75 $13,125.00 Engineer's Estimate 1,500.000 SQYD $11.00 $16,500.00

A1020 41301-1300 ASPHALT

PAVEMENT

MILLING, 6-INCH

DEPTH

Central Southern Construction Corp. 500.000 $62.00 $31,000.00

Conway Construction Co 500.000 $34.00 $17,000.00

Crestline Construction Co. LLC 500.000 $34.00 $17,000.00

MJ Hughes Construction 500.000 $33.05 $16,525.00

Westech Construction, Inc. 500.000 $32.95 $16,475.00

Cascade Civil Corp 500.000 $23.00 $11,500.00 Engineer's Estimate 500.000 SQYD $25.00 $12,500.00

A1040 55201-0200 STRUCTURAL

CONCRETE, CLASS

A (AE) (EXISTING

WINGWALL AND

HEADWALL

EXTENSION)

Cascade Civil Corp 4.000 $10,200.00 $40,800.00 Conway Construction Co 4.000 $8,500.00 $34,000.00

Crestline Construction Co. LLC 4.000 $6,950.00 $27,800.00

Westech Construction, Inc. 4.000 $4,443.78 $17,775.12

Central Southern Construction Corp. 4.000 $4,200.00 $16,800.00

MJ Hughes Construction 4.000 $1,940.00 $7,760.00

Engineer's Estimate 4.000 CUYD $5,000.00 $20,000.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1060 56202-0000 TEMPORARY

SUPPORT

STRUCTURE (GRS

BACKFILL WALL)

Central Southern Construction Corp. $475,000.00

Crestline Construction Co. LLC $147,200.00

Cascade Civil Corp $125,000.00 Conway Construction Co $75,000.00

Westech Construction, Inc. $70,427.83

MJ Hughes Construction $64,600.00

Engineer's Estimate ALL LPSM LPSM $32,550.00

A1080 56202-0000 TEMPORARY

SUPPORT

STRUCTURE (I-84

UNDERCROSSING

EXCAVATION

SHORING)

Central Southern Construction Corp. $675,000.00

Crestline Construction Co. LLC $555,000.00

Cascade Civil Corp $500,000.00 MJ Hughes Construction $455,000.00

Conway Construction Co $450,000.00

Westech Construction, Inc. $394,385.19

Engineer's Estimate ALL LPSM LPSM $484,000.00

A1100 56202-0000 TEMPORARY

SUPPORT

STRUCTURE

(SHOULDER

WIDENING)

Central Southern Construction Corp. $325,000.00

Cascade Civil Corp $215,000.00 MJ Hughes Construction $159,200.00

Crestline Construction Co. LLC $132,000.00

Conway Construction Co $120,000.00

Westech Construction, Inc. $87,421.24

Engineer's Estimate ALL LPSM LPSM $154,200.00

A1160 56302-1000 COATING,

CONCRETE

STRUCTURE (ANTI-

GRAFFITI COATING)

Central Southern Construction Corp. 4,000.000 $12.00 $48,000.00

Cascade Civil Corp 4,000.000 $10.00 $40,000.00 Westech Construction, Inc. 4,000.000 $6.67 $26,680.00

MJ Hughes Construction 4,000.000 $2.75 $11,000.00

Crestline Construction Co. LLC 4,000.000 $1.00 $4,000.00

Conway Construction Co 4,000.000 $0.50 $2,000.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1160 56302-1000 COATING,

CONCRETE

STRUCTURE (ANTI-

GRAFFITI COATING)

Engineer's Estimate 4,000.000 SQFT $9.00 $36,000.00

A1180 56302-1000 COATING,

CONCRETE

STRUCTURE

(CEMENTITIOUS

COATING)

Cascade Civil Corp 140.000 $100.00 $14,000.00 Central Southern Construction Corp. 140.000 $100.00 $14,000.00

Westech Construction, Inc. 140.000 $38.88 $5,443.20

Conway Construction Co 140.000 $26.00 $3,640.00

Crestline Construction Co. LLC 140.000 $25.00 $3,500.00

MJ Hughes Construction 140.000 $7.05 $987.00

Engineer's Estimate 140.000 SQFT $140.00 $19,600.00

A1200 57801-0000 PRECAST

STRUCTURAL

CONCRETE

(PILASTERS)

MJ Hughes Construction 2.000 $16,600.00 $33,200.00

Central Southern Construction Corp. 2.000 $16,000.00 $32,000.00

Cascade Civil Corp 2.000 $10,000.00 $20,000.00 Crestline Construction Co. LLC 2.000 $10,000.00 $20,000.00

Westech Construction, Inc. 2.000 $4,223.01 $8,446.02

Conway Construction Co 2.000 $750.00 $1,500.00

Engineer's Estimate 2.000 CUYD $9,000.00 $18,000.00

A1220 60201-0200 6-INCH PIPE

CULVERT

Cascade Civil Corp 26.000 $205.00 $5,330.00 Central Southern Construction Corp. 26.000 $185.00 $4,810.00

Westech Construction, Inc. 26.000 $113.20 $2,943.20

Crestline Construction Co. LLC 26.000 $85.00 $2,210.00

MJ Hughes Construction 26.000 $82.00 $2,132.00

Conway Construction Co 26.000 $72.00 $1,872.00

Engineer's Estimate 26.000 LNFT $180.00 $4,680.00

A1240 60201-0400 12-INCH PIPE

CULVERT

Central Southern Construction Corp. 180.000 $225.00 $40,500.00

Conway Construction Co 180.000 $180.00 $32,400.00

Crestline Construction Co. LLC 180.000 $161.00 $28,980.00

Westech Construction, Inc. 180.000 $101.53 $18,275.40

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1240 60201-0400 12-INCH PIPE

CULVERT

Cascade Civil Corp 180.000 $90.00 $16,200.00 MJ Hughes Construction 180.000 $90.00 $16,200.00

Engineer's Estimate 180.000 LNFT $210.00 $37,800.00

A1260 60201-0600 18-INCH PIPE

CULVERT

Central Southern Construction Corp. 100.000 $275.00 $27,500.00

Conway Construction Co 100.000 $230.00 $23,000.00

Crestline Construction Co. LLC 100.000 $181.00 $18,100.00

Westech Construction, Inc. 100.000 $154.01 $15,401.00

Cascade Civil Corp 100.000 $135.00 $13,500.00 MJ Hughes Construction 100.000 $110.00 $11,000.00

Engineer's Estimate 100.000 LNFT $230.00 $23,000.00

A1280 60203-0400 12-INCH SLOTTED

DRAIN PIPE

Central Southern Construction Corp. 430.000 $165.00 $70,950.00

Crestline Construction Co. LLC 430.000 $103.00 $44,290.00

Cascade Civil Corp 430.000 $35.00 $15,050.00 Conway Construction Co 430.000 $22.00 $9,460.00

Westech Construction, Inc. 430.000 $21.76 $9,356.80

MJ Hughes Construction 430.000 $17.15 $7,374.50

Engineer's Estimate 430.000 LNFT $75.00 $32,250.00

A1300 60210-0400 END SECTION FOR

12-INCH PIPE

CULVERT

Central Southern Construction Corp. 1.000 $1,900.00 $1,900.00

Westech Construction, Inc. 1.000 $1,157.46 $1,157.46

Conway Construction Co 1.000 $520.00 $520.00

MJ Hughes Construction 1.000 $510.00 $510.00

Crestline Construction Co. LLC 1.000 $475.00 $475.00

Cascade Civil Corp 1.000 $250.00 $250.00 Engineer's Estimate 1.000 EACH $1,000.00 $1,000.00

A1320 60210-0600 END SECTION FOR

18-INCH PIPE

CULVERT

Central Southern Construction Corp. 1.000 $2,400.00 $2,400.00

Westech Construction, Inc. 1.000 $1,294.14 $1,294.14

MJ Hughes Construction 1.000 $530.00 $530.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1320 60210-0600 END SECTION FOR

18-INCH PIPE

CULVERT

Conway Construction Co 1.000 $520.00 $520.00

Crestline Construction Co. LLC 1.000 $475.00 $475.00

Cascade Civil Corp 1.000 $400.00 $400.00 Engineer's Estimate 1.000 EACH $1,200.00 $1,200.00

A1340 60216-0000 LARGE PRECAST

CONCRETE ARCH

CULVERT

Central Southern Construction Corp. 101.000 $19,500.00 $1,969,500.00

Cascade Civil Corp 101.000 $19,200.00 $1,939,200.00 Conway Construction Co 101.000 $16,488.06 $1,665,294.06

MJ Hughes Construction 101.000 $13,500.00 $1,363,500.00

Crestline Construction Co. LLC 101.000 $13,000.00 $1,313,000.00

Westech Construction, Inc. 101.000 $10,074.00 $1,017,474.00

Engineer's Estimate 101.000 LNFT $13,100.00 $1,323,100.00 A1360 60401-0000 MANHOLE Central Southern

Construction Corp. 3.000 $11,000.00 $33,000.00

Cascade Civil Corp 3.000 $10,500.00 $31,500.00 Crestline Construction Co. LLC 3.000 $8,600.00 $25,800.00

MJ Hughes Construction 3.000 $6,830.00 $20,490.00

Conway Construction Co 3.000 $6,500.00 $19,500.00

Westech Construction, Inc. 3.000 $6,438.21 $19,314.63

Engineer's Estimate 3.000 EACH $8,000.00 $24,000.00 A1380 60403-0000 INLET (DITCH) Cascade Civil Corp 2.000 $5,500.00 $11,000.00

Conway Construction Co 2.000 $4,800.00 $9,600.00

Central Southern Construction Corp. 2.000 $4,500.00 $9,000.00

Crestline Construction Co. LLC 2.000 $3,700.00 $7,400.00

Westech Construction, Inc. 2.000 $2,699.04 $5,398.08

MJ Hughes Construction 2.000 $1,280.00 $2,560.00

Engineer's Estimate 2.000 EACH $4,000.00 $8,000.00

A1400 60403-0000 INLET (ODOT TYPE

G-2) Central Southern Construction Corp. 3.000 $6,500.00 $19,500.00

Conway Construction Co 3.000 $4,400.00 $13,200.00

Cascade Civil Corp 3.000 $3,900.00 $11,700.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1400 60403-0000 INLET (ODOT TYPE

G-2)

Crestline Construction Co. LLC 3.000 $3,550.00 $10,650.00

Westech Construction, Inc. 3.000 $2,598.86 $7,796.58

MJ Hughes Construction 3.000 $2,130.00 $6,390.00

Engineer's Estimate 3.000 EACH $6,000.00 $18,000.00 A1420 60403-0000 INLET (PVC) Central Southern

Construction Corp. 4.000 $3,600.00 $14,400.00

MJ Hughes Construction 4.000 $3,480.00 $13,920.00

Westech Construction, Inc. 4.000 $2,784.94 $11,139.76

Crestline Construction Co. LLC 4.000 $2,600.00 $10,400.00

Conway Construction Co 4.000 $1,500.00 $6,000.00

Cascade Civil Corp 4.000 $1,050.00 $4,200.00 Engineer's Estimate 4.000 EACH $2,500.00 $10,000.00

A1440 60501-0000 STANDARD

UNDERDRAIN

SYSTEM

Central Southern Construction Corp. 630.000 $105.00 $66,150.00

Crestline Construction Co. LLC 630.000 $58.00 $36,540.00

Conway Construction Co 630.000 $48.00 $30,240.00

Westech Construction, Inc. 630.000 $32.27 $20,330.10

Cascade Civil Corp 630.000 $30.00 $18,900.00 MJ Hughes Construction 630.000 $26.50 $16,695.00

Engineer's Estimate 630.000 LNFT $60.00 $37,800.00

A1460 60515-0400 UNDERDRAIN

CLEANOUT, 6-INCH

Central Southern Construction Corp. 3.000 $2,200.00 $6,600.00

Cascade Civil Corp 3.000 $1,800.00 $5,400.00 Westech Construction, Inc. 3.000 $894.21 $2,682.63

Conway Construction Co 3.000 $850.00 $2,550.00

MJ Hughes Construction 3.000 $800.00 $2,400.00

Crestline Construction Co. LLC 3.000 $650.00 $1,950.00

Engineer's Estimate 3.000 EACH $2,000.00 $6,000.00

A1480 60901-0200 CURB, CONCRETE,

4-INCH DEPTH

Central Southern Construction Corp. 295.000 $75.00 $22,125.00

MJ Hughes Construction 295.000 $35.55 $10,487.25

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1480 60901-0200 CURB, CONCRETE,

4-INCH DEPTH

Crestline Construction Co. LLC 295.000 $35.00 $10,325.00

Westech Construction, Inc. 295.000 $24.44 $7,209.80

Conway Construction Co 295.000 $23.00 $6,785.00

Cascade Civil Corp 295.000 $15.00 $4,425.00 Engineer's Estimate 295.000 LNFT $35.00 $10,325.00

A1500 60901-1500 CURB, CONCRETE,

16-INCH DEPTH

Central Southern Construction Corp. 65.000 $185.00 $12,025.00

MJ Hughes Construction 65.000 $59.00 $3,835.00

Westech Construction, Inc. 65.000 $49.26 $3,201.90

Crestline Construction Co. LLC 65.000 $48.00 $3,120.00

Conway Construction Co 65.000 $46.00 $2,990.00

Cascade Civil Corp 65.000 $40.00 $2,600.00 Engineer's Estimate 65.000 LNFT $70.00 $4,550.00

A1520 61009-0000 DETECTABLE

WARNING PANELS

(WHITE)

Crestline Construction Co. LLC 6.000 $6,200.00 $37,200.00

Central Southern Construction Corp. 6.000 $900.00 $5,400.00

Westech Construction, Inc. 6.000 $666.57 $3,999.42

Conway Construction Co 6.000 $630.00 $3,780.00

Cascade Civil Corp 6.000 $300.00 $1,800.00 MJ Hughes Construction 6.000 $150.00 $900.00

Engineer's Estimate 6.000 SQYD $530.00 $3,180.00

A1540 61701-4700 GUARDRAIL

SYSTEM MGS, TYPE

2, CLASS B, WOOD

POSTS (ODOT TYPE

2A)

Central Southern Construction Corp. 1,930.000 $112.00 $216,160.00

MJ Hughes Construction 1,930.000 $55.00 $106,150.00

Conway Construction Co 1,930.000 $52.50 $101,325.00

Crestline Construction Co. LLC 1,930.000 $52.00 $100,360.00

Westech Construction, Inc. 1,930.000 $51.83 $100,031.90

Cascade Civil Corp 1,930.000 $32.00 $61,760.00 Engineer's Estimate 1,930.000 LNFT $67.00 $129,310.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1560 61701-4700 GUARDRAIL

SYSTEM MGS, TYPE

2, CLASS B, WOOD

POSTS (ODOT TYPE

3)

Central Southern Construction Corp. 50.000 $200.00 $10,000.00

Westech Construction, Inc. 50.000 $146.64 $7,332.00

MJ Hughes Construction 50.000 $120.00 $6,000.00

Conway Construction Co 50.000 $115.50 $5,775.00

Crestline Construction Co. LLC 50.000 $112.00 $5,600.00

Cascade Civil Corp 50.000 $61.00 $3,050.00 Engineer's Estimate 50.000 LNFT $120.00 $6,000.00

A1580 61702-1500 TERMINAL SYSTEM,

TYPE MGS

TANGENT (ODOT

TEST LEVEL 2 NON-

FLARED ENERGY

ABSORBING

TERMINAL)

Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00

Westech Construction, Inc. 1.000 $5,876.89 $5,876.89

MJ Hughes Construction 1.000 $4,810.00 $4,810.00

Conway Construction Co 1.000 $4,600.00 $4,600.00

Crestline Construction Co. LLC 1.000 $4,500.00 $4,500.00

Cascade Civil Corp 1.000 $3,825.00 $3,825.00 Engineer's Estimate 1.000 EACH $7,000.00 $7,000.00

A1600 61702-1500 TERMINAL SYSTEM,

TYPE MGS

TANGENT (ODOT

TEST LEVEL 3 NON-

FLARED ENERGY

ABSORBING

TERMINAL)

Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00

Westech Construction, Inc. 1.000 $7,326.68 $7,326.68

MJ Hughes Construction 1.000 $5,140.00 $5,140.00

Conway Construction Co 1.000 $4,900.00 $4,900.00

Crestline Construction Co. LLC 1.000 $4,800.00 $4,800.00

Cascade Civil Corp 1.000 $4,125.00 $4,125.00 Engineer's Estimate 1.000 EACH $7,000.00 $7,000.00

A1620 61702-1600 TERMINAL SYSTEM,

TYPE MGS FLARED

(ODOT FLARED

ENERGY

ABSORBING

TERMINAL)

Central Southern Construction Corp. 1.000 $10,000.00 $10,000.00

Westech Construction, Inc. 1.000 $7,198.92 $7,198.92

MJ Hughes Construction 1.000 $5,250.00 $5,250.00

Conway Construction Co 1.000 $5,000.00 $5,000.00

Crestline Construction Co. LLC 1.000 $4,900.00 $4,900.00

Cascade Civil Corp 1.000 $4,125.00 $4,125.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1620 61702-1600 TERMINAL SYSTEM,

TYPE MGS FLARED

(ODOT FLARED

ENERGY

ABSORBING

TERMINAL)

Engineer's Estimate 1.000 EACH $5,500.00 $5,500.00

A1640 61703-0000 TERMINAL END

(ODOT TYPE 1

ANCHOR & TYPE C

END PIECE)

Central Southern Construction Corp. 4.000 $3,300.00 $13,200.00

Westech Construction, Inc. 4.000 $2,777.36 $11,109.44

MJ Hughes Construction 4.000 $2,020.00 $8,080.00

Conway Construction Co 4.000 $2,000.00 $8,000.00

Crestline Construction Co. LLC 4.000 $1,900.00 $7,600.00

Cascade Civil Corp 4.000 $1,235.00 $4,940.00 Engineer's Estimate 4.000 EACH $3,000.00 $12,000.00

A1660 61707-0000 STRUCTURE

TRANSITION

RAILING

Central Southern Construction Corp. 82.400 $425.00 $35,020.00

MJ Hughes Construction 82.400 $260.00 $21,424.00

Conway Construction Co 82.400 $250.00 $20,600.00

Westech Construction, Inc. 82.400 $244.41 $20,139.38

Crestline Construction Co. LLC 82.400 $240.00 $19,776.00

Cascade Civil Corp 82.400 $218.00 $17,963.20 Engineer's Estimate 82.400 LNFT $250.00 $20,600.00

A1680 61801-0000 CONCRETE

BARRIER

Central Southern Construction Corp. 176.000 $700.00 $123,200.00

MJ Hughes Construction 176.000 $210.00 $36,960.00

Westech Construction, Inc. 176.000 $183.31 $32,262.56

Conway Construction Co 176.000 $173.00 $30,448.00

Crestline Construction Co. LLC 176.000 $168.00 $29,568.00

Cascade Civil Corp 176.000 $165.00 $29,040.00 Engineer's Estimate 176.000 LNFT $170.00 $29,920.00

A1700 61805-1000 REMOVE AND

RESET BARRIER

Central Southern Construction Corp. 1,900.000 $95.00 $180,500.00

Crestline Construction Co. LLC 1,900.000 $53.00 $100,700.00

Westech Construction, Inc. 1,900.000 $32.22 $61,218.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1700 61805-1000 REMOVE AND

RESET BARRIER

Cascade Civil Corp 1,900.000 $31.00 $58,900.00 Conway Construction Co 1,900.000 $30.50 $57,950.00

MJ Hughes Construction 1,900.000 $3.55 $6,745.00

Engineer's Estimate 1,900.000 LNFT $50.00 $95,000.00 A1720 61901-0000 FENCE (TYPE 1-4W) Westech

Construction, Inc. 1,100.000 $64.43 $70,873.00

Central Southern Construction Corp. 1,100.000 $48.00 $52,800.00

MJ Hughes Construction 1,100.000 $38.30 $42,130.00

Conway Construction Co 1,100.000 $37.00 $40,700.00

Crestline Construction Co. LLC 1,100.000 $25.00 $27,500.00

Cascade Civil Corp 1,100.000 $15.00 $16,500.00 Engineer's Estimate 1,100.000 LNFT $34.00 $37,400.00

A1740 61904-0000 BOLLARD

(COLLAPSIBLE)

Central Southern Construction Corp. 2.000 $3,500.00 $7,000.00

Westech Construction, Inc. 2.000 $2,083.02 $4,166.04

Crestline Construction Co. LLC 2.000 $2,050.00 $4,100.00

Conway Construction Co 2.000 $1,900.00 $3,800.00

MJ Hughes Construction 2.000 $1,040.00 $2,080.00

Cascade Civil Corp 2.000 $1,000.00 $2,000.00 Engineer's Estimate 2.000 EACH $2,000.00 $4,000.00

A1760 62002-0000 STONE MASONRY

(HEADWALLS AND

WINGWALLS)

Central Southern Construction Corp. 240.000 $2,500.00 $600,000.00

Crestline Construction Co. LLC 240.000 $1,855.00 $445,200.00

Westech Construction, Inc. 240.000 $1,458.11 $349,946.40

Conway Construction Co 240.000 $1,350.00 $324,000.00

Cascade Civil Corp 240.000 $1,315.00 $315,600.00 MJ Hughes Construction 240.000 $1,250.00 $300,000.00

Engineer's Estimate 240.000 SQYD $1,800.00 $432,000.00

A1780 62010-0000 STONE MASONRY

(FLUSH BASALT

BAND, 36-INCH)

Crestline Construction Co. LLC 120.000 $1,000.00 $120,000.00

Westech Construction, Inc. 120.000 $501.30 $60,156.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1780 62010-0000 STONE MASONRY

(FLUSH BASALT

BAND, 36-INCH)

Central Southern Construction Corp. 120.000 $485.00 $58,200.00

Conway Construction Co 120.000 $480.00 $57,600.00

MJ Hughes Construction 120.000 $410.00 $49,200.00

Cascade Civil Corp 120.000 $350.00 $42,000.00 Engineer's Estimate 120.000 LNFT $420.00 $50,400.00

A1800 62102-0000 MARKER

(GOVERNMENT

FURNISHED TRAIL

MEDALLION)

Central Southern Construction Corp. 2.000 $850.00 $1,700.00

Crestline Construction Co. LLC 2.000 $575.00 $1,150.00

Cascade Civil Corp 2.000 $532.00 $1,064.00 MJ Hughes Construction 2.000 $500.00 $1,000.00

Conway Construction Co 2.000 $350.00 $700.00

Westech Construction, Inc. 2.000 $166.64 $333.28

Engineer's Estimate 2.000 EACH $420.00 $840.00

A1820 62201-0250 DUMP TRUCK, 10

CUBIC YARD

MINIMUM

CAPACITY

MJ Hughes Construction 30.000 $230.00 $6,900.00

Conway Construction Co 30.000 $225.00 $6,750.00

Crestline Construction Co. LLC 30.000 $202.00 $6,060.00

Central Southern Construction Corp. 30.000 $200.00 $6,000.00

Westech Construction, Inc. 30.000 $166.64 $4,999.20

Cascade Civil Corp 30.000 $150.00 $4,500.00 Engineer's Estimate 30.000 HOUR $170.00 $5,100.00

A1840 62201-3150 HYDRAULIC

EXCAVATOR, 1.0

CUBIC YARD

MINIMUM

CAPACITY WITH

THUMB

ATTACHMENT

MJ Hughes Construction 40.000 $270.00 $10,800.00

Central Southern Construction Corp. 40.000 $250.00 $10,000.00

Conway Construction Co 40.000 $210.00 $8,400.00

Cascade Civil Corp 40.000 $204.00 $8,160.00 Crestline Construction Co. LLC 40.000 $202.00 $8,080.00

Westech Construction, Inc. 40.000 $141.52 $5,660.80

Engineer's Estimate 40.000 HOUR $200.00 $8,000.00 A1860 62201-3750 CHAIN SAW Central Southern

Construction Corp. 40.000 $130.00 $5,200.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1860 62201-3750 CHAIN SAW Conway Construction Co 40.000 $110.00 $4,400.00

Crestline Construction Co. LLC 40.000 $107.00 $4,280.00

Cascade Civil Corp 40.000 $100.00 $4,000.00 MJ Hughes Construction 40.000 $96.00 $3,840.00

Westech Construction, Inc. 40.000 $94.35 $3,774.00

Engineer's Estimate 40.000 HOUR $100.00 $4,000.00

A1880 62410-0000 PLACING

MANUFACTURED

TOPSOIL (4-INCH

DEPTH)

Westech Construction, Inc. 5,750.000 $20.00 $115,000.00

MJ Hughes Construction 5,750.000 $19.70 $113,275.00

Cascade Civil Corp 5,750.000 $18.00 $103,500.00 Central Southern Construction Corp. 5,750.000 $17.00 $97,750.00

Crestline Construction Co. LLC 5,750.000 $15.00 $86,250.00

Conway Construction Co 5,750.000 $8.00 $46,000.00

Engineer's Estimate 5,750.000 SQYD $19.25 $110,687.50

A1900 62510-2000 SEEDING,

HYDRAULIC

METHOD

(GOVERNMENT

FURNISHED SEED)

Central Southern Construction Corp. 5.300 $3,300.00 $17,490.00

Crestline Construction Co. LLC 5.300 $1,125.00 $5,962.50

Westech Construction, Inc. 5.300 $1,110.94 $5,887.98

MJ Hughes Construction 5.300 $1,090.00 $5,777.00

Cascade Civil Corp 5.300 $1,000.00 $5,300.00 Conway Construction Co 5.300 $995.40 $5,275.62

Engineer's Estimate 5.300 ACRE $2,780.00 $14,734.00

A1920 62515-2000 MULCHING,

HYDRAULIC

METHOD

Central Southern Construction Corp. 5.300 $4,000.00 $21,200.00

Westech Construction, Inc. 5.300 $3,332.83 $17,664.00

MJ Hughes Construction 5.300 $3,280.00 $17,384.00

Cascade Civil Corp 5.300 $2,980.00 $15,794.00 Crestline Construction Co. LLC 5.300 $2,400.00 $12,720.00

Conway Construction Co 5.300 $2,300.00 $12,190.00

Engineer's Estimate 5.300 ACRE $3,490.00 $18,497.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A1940 62901-0700 ROLLED EROSION

CONTROL

PRODUCT, TYPE 2.C

Central Southern Construction Corp. 450.000 $13.00 $5,850.00

Crestline Construction Co. LLC 450.000 $11.00 $4,950.00

Westech Construction, Inc. 450.000 $9.44 $4,248.00

MJ Hughes Construction 450.000 $9.30 $4,185.00

Cascade Civil Corp 450.000 $8.50 $3,825.00 Conway Construction Co 450.000 $8.00 $3,600.00

Engineer's Estimate 450.000 SQYD $8.25 $3,712.50 A1960 63301-0000 SIGN SYSTEM Crestline

Construction Co. LLC 27.000 $4,425.00 $119,475.00

Conway Construction Co 27.000 $2,000.00 $54,000.00

Westech Construction, Inc. 27.000 $1,888.61 $50,992.47

Central Southern Construction Corp. 27.000 $1,650.00 $44,550.00

Cascade Civil Corp 27.000 $825.00 $22,275.00 MJ Hughes Construction 27.000 $270.00 $7,290.00

Engineer's Estimate 27.000 EACH $660.00 $17,820.00

A1980 63301-0000 SIGN SYSTEM (ON

CONCRETE TRAIL

SIGN SUPPORT)

Crestline Construction Co. LLC 2.000 $8,500.00 $17,000.00

Central Southern Construction Corp. 2.000 $6,500.00 $13,000.00

Conway Construction Co 2.000 $4,400.00 $8,800.00

Westech Construction, Inc. 2.000 $1,222.04 $2,444.08

MJ Hughes Construction 2.000 $1,090.00 $2,180.00

Cascade Civil Corp 2.000 $1,000.00 $2,000.00 Engineer's Estimate 2.000 EACH $1,060.00 $2,120.00

A2000 63309-0100 DELINEATOR, TYPE

Crestline Construction Co. LLC 32.000 $185.00 $5,920.00

Central Southern Construction Corp. 32.000 $180.00 $5,760.00

MJ Hughes Construction 32.000 $160.00 $5,120.00

Conway Construction Co 32.000 $157.00 $5,024.00

Westech Construction, Inc. 32.000 $138.87 $4,443.84

Cascade Civil Corp 32.000 $65.00 $2,080.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A2000 63309-0100 DELINEATOR, TYPE

1 Engineer's Estimate 32.000 EACH $85.00 $2,720.00

A2020 63309-0400 DELINEATOR, TYPE

Central Southern Construction Corp. 5.000 $215.00 $1,075.00

MJ Hughes Construction 5.000 $160.00 $800.00

Crestline Construction Co. LLC 5.000 $121.00 $605.00

Conway Construction Co 5.000 $94.00 $470.00

Westech Construction, Inc. 5.000 $55.55 $277.75

Cascade Civil Corp 5.000 $45.00 $225.00 Engineer's Estimate 5.000 EACH $85.00 $425.00

A2040 63313-0000 RUMBLE STRIP Central Southern Construction Corp. 11,500.000 $4.00 $46,000.00

Crestline Construction Co. LLC 11,500.000 $1.00 $11,500.00

MJ Hughes Construction 11,500.000 $0.95 $10,925.00

Westech Construction, Inc. 11,500.000 $0.94 $10,810.00

Conway Construction Co 11,500.000 $0.90 $10,350.00

Cascade Civil Corp 11,500.000 $0.85 $9,775.00 Engineer's Estimate 11,500.000 LNFT $0.75 $8,625.00

A2060 63316-1000 REMOVE AND

RESET SIGN

SYSTEM

Crestline Construction Co. LLC 5.000 $5,200.00 $26,000.00

Westech Construction, Inc. 5.000 $1,721.96 $8,609.80

Conway Construction Co 5.000 $1,500.00 $7,500.00

Central Southern Construction Corp. 5.000 $1,050.00 $5,250.00

MJ Hughes Construction 5.000 $550.00 $2,750.00

Cascade Civil Corp 5.000 $300.00 $1,500.00 Engineer's Estimate 5.000 EACH $560.00 $2,800.00

A2080 63401-2300 PAVEMENT

MARKINGS, TYPE L,

SOLID (GROOVED)

Central Southern Construction Corp. 23,800.000 $5.85 $139,230.00

Westech Construction, Inc. 23,800.000 $5.39 $128,282.00

MJ Hughes Construction 23,800.000 $5.30 $126,140.00

Conway Construction Co 23,800.000 $5.00 $119,000.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A2080 63401-2300 PAVEMENT

MARKINGS, TYPE L,

SOLID (GROOVED)

Crestline Construction Co. LLC 23,800.000 $5.00 $119,000.00

Cascade Civil Corp 23,800.000 $4.85 $115,430.00 Engineer's Estimate 23,800.000 LNFT $2.50 $59,500.00

A2100 63401-2400 PAVEMENT

MARKINGS, TYPE L,

BROKEN

(GROOVED)

Central Southern Construction Corp. 12,700.000 $3.15 $40,005.00

Crestline Construction Co. LLC 12,700.000 $2.00 $25,400.00

Westech Construction, Inc. 12,700.000 $1.94 $24,638.00

MJ Hughes Construction 12,700.000 $1.90 $24,130.00

Conway Construction Co 12,700.000 $1.80 $22,860.00

Cascade Civil Corp 12,700.000 $1.75 $22,225.00 Engineer's Estimate 12,700.000 LNFT $2.50 $31,750.00

A2120 63403-0800 PAVEMENT

MARKINGS, TYPE H

Central Southern Construction Corp. 65.000 $38.00 $2,470.00

Westech Construction, Inc. 65.000 $27.77 $1,805.05

MJ Hughes Construction 65.000 $27.35 $1,777.75

Conway Construction Co 65.000 $26.00 $1,690.00

Cascade Civil Corp 65.000 $25.00 $1,625.00 Crestline Construction Co. LLC 65.000 $25.00 $1,625.00

Engineer's Estimate 65.000 SQFT $100.00 $6,500.00

A2140 63407-0300 RECESSED

PAVEMENT

MARKER, MONO-

DIRECTIONAL

REFLECTIVE

Central Southern Construction Corp. 290.000 $110.00 $31,900.00

Westech Construction, Inc. 290.000 $31.11 $9,021.90

MJ Hughes Construction 290.000 $30.60 $8,874.00

Conway Construction Co 290.000 $29.00 $8,410.00

Cascade Civil Corp 290.000 $28.00 $8,120.00 Crestline Construction Co. LLC 290.000 $28.00 $8,120.00

Engineer's Estimate 290.000 EACH $15.00 $4,350.00

A2160 63502-0300 TEMPORARY

TRAFFIC CONTROL,

ARROW BOARD,

TYPE C

Central Southern Construction Corp. 2.000 $14,000.00 $28,000.00

MJ Hughes Construction 2.000 $4,500.00 $9,000.00

Cascade Civil Corp 2.000 $2,800.00 $5,600.00 Crestline Construction Co. LLC 2.000 $2,550.00 $5,100.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A2160 63502-0300 TEMPORARY

TRAFFIC CONTROL,

ARROW BOARD,

TYPE C

Conway Construction Co 2.000 $2,500.00 $5,000.00

Westech Construction, Inc. 2.000 $2,221.89 $4,443.78

Engineer's Estimate 2.000 EACH $5,000.00 $10,000.00

A2180 63502-0500 TEMPORARY

TRAFFIC CONTROL,

BARRICADE TYPE 2

Crestline Construction Co. LLC 2.000 $325.00 $650.00

Central Southern Construction Corp. 2.000 $250.00 $500.00

MJ Hughes Construction 2.000 $150.00 $300.00

Conway Construction Co 2.000 $80.00 $160.00

Cascade Civil Corp 2.000 $41.00 $82.00 Westech Construction, Inc. 2.000 $38.89 $77.78

Engineer's Estimate 2.000 EACH $5.00 $10.00

A2200 63502-0600 TEMPORARY

TRAFFIC CONTROL,

BARRICADE TYPE 3

Crestline Construction Co. LLC 12.000 $725.00 $8,700.00

Central Southern Construction Corp. 12.000 $425.00 $5,100.00

Conway Construction Co 12.000 $200.00 $2,400.00

Westech Construction, Inc. 12.000 $166.64 $1,999.68

MJ Hughes Construction 12.000 $150.00 $1,800.00

Cascade Civil Corp 12.000 $148.00 $1,776.00 Engineer's Estimate 12.000 EACH $250.00 $3,000.00

A2220 63502-0600 TEMPORARY

TRAFFIC CONTROL,

BARRICADE TYPE 3

(4-FOOT)

Crestline Construction Co. LLC 25.000 $725.00 $18,125.00

Central Southern Construction Corp. 25.000 $325.00 $8,125.00

Conway Construction Co 25.000 $200.00 $5,000.00

Westech Construction, Inc. 25.000 $166.64 $4,166.00

MJ Hughes Construction 25.000 $150.00 $3,750.00

Cascade Civil Corp 25.000 $148.00 $3,700.00 Engineer's Estimate 25.000 EACH $260.00 $6,500.00

A2240 63502-1050 TEMPORARY

TRAFFIC CONTROL,

TUBULAR MARKER

Crestline Construction Co. LLC 250.000 $225.00 $56,250.00

Central Southern Construction Corp. 250.000 $110.00 $27,500.00

MJ Hughes Construction 250.000 $30.00 $7,500.00

Report Generated on 10/22/2026 6:34 PM [Timezone: (UTC-05:00) Eastern Time (US & Canada)]

A2240 63502-1050 TEMPORARY

TRAFFIC CONTROL,

TUBULAR MARKER

Westech Construction, Inc. 250.000 $22.22 $5,555.00

Cascade Civil Corp 250.000 $18.00 $4,500.00 Conway Construction Co 250.000 $6.00 $1,500.00

Engineer's Estimate 250.000 EACH $40.00 $10,000.00

A2260 63502-1300 TEMPORARY

TRAFFIC…