BidSum_OR FLAP DOT CRGNSA 100(7).pdf
PDF 153 KB Posted
- Solicitation number
- 69056726B000009
About this file
This is a Bid Opening Summary for a construction project under Solicitation No. 69056726B000009. The bid opening occurred on October 21, 2026, at 2:00 p.m. for the OR FLAP DOT CRGNSA 100(7) project: Historic Columbia River Highway State Trail, Mitchell Point Drive to Ruthton Trailhead. Six contractors submitted bids, with MJ Hughes submitting the lowest bid of $6,999,784.97. The other bids ranged from $7,489,129.76 to $15,633,900.00. The Engineer's Estimate was established at $9,171,291.08. The low bidder's phone number is 360-314-2024.
Multiple contractors submitted modifications to their initial offers, received at various times on October 20-21, 2026, indicating the solicitation allowed for bid revisions. The bid opening was attended by 3 in-person guests and 7 WFL staff members, with an additional 9 online participants. Rebekah Webb served as the Bid Opening Officer, with Haydar Mohammad as Assistant.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidTabulation_OR FLAP DOT CRGNSA 100(7).pdf | ||
| Amendment A001.pdf | ||
| QA_10.14.2026.pdf | ||
| QA_10.8.2026.pdf | ||
| ora-dot-crgnsa100-7_plans.pdf | ||
| WFLHD Construction Contract Administration_FY 23 V2.pdf | ||
| IFB_69056726B000009_OR FLAP DOT CRGNSA 100(7).pdf | ||
| Physical Data.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID OPENING SUMMARY
Solicitation No. 69056726B000009 Bid Opening Date 10/21/2026 Time 2:00 p.m.
Project Number/Name: OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead
OFFER RECEIVED
REC'D
BY
CONTRACTOR
DATE
TIME
Schedule A
1.
10/20/2026 Mod 1 10/21/2026 Mod 2 10/21/2026
9:59am Mod 1 5:28am Mod 2 12:46pm
RW
Mod 1
RW
Mod 2
RW
Central Southern Construction
$15,633,900.00
2.
Mod 10/21/2026
11:05am Mod 1:49pm
HM
Mod
ER
Conway Construction Company
$7,694,396.38
3.
Mod 10/21/2026
12:55pm Mod 12:10pm
HM
Mod
RW
Cascade Civil Corp. $8,195,105.50
4.
10/21/2026 1:45pm RW Westech Construction $7,489,129.76
5.
10/21/2026 1:51pm RW Crestline Construction Company, LLC
$7,990,242.50
6.
10/21/2026 1:56pm RW MJ Hughes $6,999,784.97
7.
8.
9.
10.
Engineer’s Estimate $9,171,291.08
LOW BIDDER'S
PHONE NUMBER: 360-314-2024
Attendance: In person: 3 guests; 7 WFL staff. Online: 9 guests
Bid Opening Officer: Rebekah Webb Assistant: Haydar Mohammad
File details come from the government source that posted it. Updated .