OR DOT CRGNSA 100(1) Historic Columbia River Highway State Trail, OR DOT CRGNSA 100(3), Historic Columbia River Highway Summit Creek Viaduct, & OR HOODRIVER 18(1), Wyeth Trailhead
Award Notice Posted
- Solicitation number
- DTFH70-16-B-00019
- Agency
-
Federal Highway Administration
Department of Transportation
- Awarded
- to Stellar J Corp
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- DTFH7017C00007 Federal contract award
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- PSC
- Not on record
- Place of performance
- Approximately 6 miles east of Cascade Locks, Oregon ., United States
Notice details come from SAM.gov. Updated .
Notice text
PROJECT: OR DOT CRGNSA 100(1), Historic Columbia River Highway State Trail
OR DOT CRGNSA 100(3), Historic Columbia River Highway Summit Creek Viaduct
OR HOODRIVER 18(1), Wyeth Trailhead
LOCATION: Columbia River Gorge National Scenic Area. 6 miles east of Cascade Locks, OR.
WORK: The work consists of 2 viaducts and a bridge; mechanically stabilized welded wire walls, bin walls, and tie-back walls; rock fall protection fencing, netting, and rock bolting; controlled blasting and grading; aggregate base and paving; drainage improvements; parking lot, restroom and kiosk; stone masonry, exposed aggregate sidewalk, and decorative steel and cable railings; waterline; guardrail, signing and striping; and I-84 traffic control and cross-over installation and other small items of work.
Bridge Info: The project includes construction of three structures: 1) the Summit Creek Viaduct - a 6 span, 500 -foot long pre-stressed concrete box beam bridge with cast-in-place concrete deck; 2) the Gordon Creek Bridge - a single span, 80-foot long pre-stressed concrete slab bridge with asphalt overlay; and 3) the Lindsey Cut Bridge - a single span, 49-foot long pre-stressed concrete slab bridge with cast-in-place concrete deck.
LENGTH: 3 miles
TENTATIVE COMPLETION DATE: Fall/Winter 2018
TENTATIVE ADVERTISEMENT DATE: Fall 2016
ESTIMATED PRICE RANGE: Between $15,000,000 and $20,000,000
To view the INTERESTED VENDORS LIST you must register as an FBO user. Go to https://www.fbo.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions.
THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS
This project will be advertised with a Base and Option Schedule.
This paragraph announces possible financing available to small businesses. The three types of businesses that are eligible to receive a loan through this program are: (1) Firms that have received DBE certification from a state or local transportation agency; (2) Eligible small business firms; and (3) Firms that have received a disability rating by the Veteran's Administration and have certified themselves as a SDVOSB. Start-up businesses are not eligible to receive a STLP line of credit and should contact the SBA for information about other possible forms of financial assistance. (NOTE - This paragraph does not reserve this solicitation for these types of business): The Department of Transportation's (DOT) Short-Term Lending Program (STLP) offers working capital financing in the form of lines of credit to finance accounts receivable for transportation related contracts. The Maximum line of credit is $750,000. The STLP loan has a variable rate, which is connected to the prime rate. For more information see: http://www.dot.gov/osdbu/financial-assistance/short-term-lending-program.
Files
| File | Type | Posted |
|---|---|---|
| BidSum_HCRH.pdf | ||
| Q&A_2-22-2017.pdf | ||
| A005.pdf | ||
| Q&A_2-14-2017.pdf | ||
| A004_HCR.pdf | ||
| A003.pdf | ||
| Q&A_1-17-2017.pdf | ||
| A002_CRGNSA(2).pdf | ||
| Q&A.pdf | ||
| A001.pdf | ||
| GR_10_15_HCRH_Trail_Seg_A_D_Rockfall_Mitigation.pdf | ||
| SegAC_WFL_earthwork_OptX.xls | XLS spreadsheet | |
| State_Trail_Plans-Sealed.pdf | ||
| Geotech_Report_06_15_Segment_A-C.pdf | ||
| SegAC_WFL_earthwork_BPA1.xls | XLS spreadsheet | |
| As-Builts_Cascade_Locks_-_Mitchell_Point.pdf | ||
| SegAC_WFL_earthwork.xls | XLS spreadsheet | |
| IFB_OR_DOT_CRGNSA.pdf | ||
| Geo_Rpt_12-14_HCRH_Trail_Seg_D_Final_Geotech_Report.pdf | ||
| SegAC_WFL_earthwork_Wyeth.xls | XLS spreadsheet | |
| A-C-CrossSections.pdf | ||
| SWPPP_HCRH_State_Trail_Segments_A-C_OR_DOT_CRGNSA_100(1)_ _(3)_OR_HOODRIVER_18(1).pdf | ||
| SegAC_WFL_earthwork_BPA41.xls | XLS spreadsheet | |
| GR_11_14_HCRH_Trail_Seg_A_E_Prelim_Geotech_Recomm.pdf | ||
| Plan_Request.pdf | ||
| GM_25_14_HCRH_Trail_Shellrock_Bin_Wall_Evaluation.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 27
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| OR DOT CRGNSA 100(1) Historic Columbia River Highway State Trail, OR DOT CRGNSA 100(3) Historic Columbia River Highway Summit Creek Viaduct, OR HOODRIVER 18(1) Wyeth Trailhead | Award Notice |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity