Q&A.pdf
PDF 71 KB Posted
- Solicitation number
- DTFH70-16-B-00019
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidSum_HCRH.pdf | ||
| Q&A_2-22-2017.pdf | ||
| A005.pdf | ||
| Q&A_2-14-2017.pdf | ||
| A004_HCR.pdf | ||
| A003.pdf | ||
| Q&A_1-17-2017.pdf | ||
| A002_CRGNSA(2).pdf | ||
| A001.pdf | ||
| SegAC_WFL_earthwork_Wyeth.xls | XLS spreadsheet | |
| Geo_Rpt_12-14_HCRH_Trail_Seg_D_Final_Geotech_Report.pdf | ||
| Geotech_Report_06_15_Segment_A-C.pdf | ||
| SegAC_WFL_earthwork_BPA1.xls | XLS spreadsheet | |
| As-Builts_Cascade_Locks_-_Mitchell_Point.pdf | ||
| SegAC_WFL_earthwork.xls | XLS spreadsheet | |
| GR_10_15_HCRH_Trail_Seg_A_D_Rockfall_Mitigation.pdf | ||
| SegAC_WFL_earthwork_OptX.xls | XLS spreadsheet | |
| IFB_OR_DOT_CRGNSA.pdf | ||
| State_Trail_Plans-Sealed.pdf | ||
| SegAC_WFL_earthwork_BPA41.xls | XLS spreadsheet | |
| SWPPP_HCRH_State_Trail_Segments_A-C_OR_DOT_CRGNSA_100(1)_ _(3)_OR_HOODRIVER_18(1).pdf | ||
| GM_25_14_HCRH_Trail_Shellrock_Bin_Wall_Evaluation.pdf | ||
| GR_11_14_HCRH_Trail_Seg_A_E_Prelim_Geotech_Recomm.pdf | ||
| Plan_Request.pdf | ||
| A-C-CrossSections.pdf | ||
| PROJECT_DESCRIPTION.pdf |
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No.
OR DOT CRGNSA 100(1),
OR DOT CRGNSA 100(3), and
OR HOODRIVER 18(1)
Project Historic Columbia River Highway State Trail, Historic Columbia River Highway Summit Creek Viaduct, and Wyeth Trailhead
# General Technical Question Answer Date 1 x Are CAD files available on the OR DOT CRGNSA
100(1) Historic Columbia River Highway State Trai, OR DOT CRGNSA 100(3), Historic Columbia River Highway Summit Creek Viaduct, & OR HOODRIVER 18(1), Wyeth Trailhead project?
CAD Files are not available 8-Dec-16
2 x
Could the quantity for item no. 55201-0200 Structural concrete superstructure be clarified?
The quantity in the bid schedule seems to be very high. What is included in this quantity? Are the east and west approaches to be included in this quantity?
The superstructure concrete includes Deck, Diaphragms, West Approach Slab, East Approach Slab, East Approach Beams, and East Approach Right Curb.