SWPPP HCRH State Trail Segments A-C OR DOT CRGNSA 100(1) (3) OR HOODRIVER 18(1)

View the file

Other files

File Type Posted
BidSum_HCRH.pdf PDF
Q&A_2-22-2017.pdf PDF
A005.pdf PDF
Q&A_2-14-2017.pdf PDF
A004_HCR.pdf PDF
A003.pdf PDF
Q&A_1-17-2017.pdf PDF
A002_CRGNSA(2).pdf PDF
Q&A.pdf PDF
A001.pdf PDF
SegAC_WFL_earthwork_Wyeth.xls XLS spreadsheet
Geo_Rpt_12-14_HCRH_Trail_Seg_D_Final_Geotech_Report.pdf PDF
Geotech_Report_06_15_Segment_A-C.pdf PDF
SegAC_WFL_earthwork_BPA1.xls XLS spreadsheet
As-Builts_Cascade_Locks_-_Mitchell_Point.pdf PDF
SegAC_WFL_earthwork.xls XLS spreadsheet
GR_10_15_HCRH_Trail_Seg_A_D_Rockfall_Mitigation.pdf PDF
SegAC_WFL_earthwork_OptX.xls XLS spreadsheet
IFB_OR_DOT_CRGNSA.pdf PDF
State_Trail_Plans-Sealed.pdf PDF
SegAC_WFL_earthwork_BPA41.xls XLS spreadsheet
GM_25_14_HCRH_Trail_Shellrock_Bin_Wall_Evaluation.pdf PDF
GR_11_14_HCRH_Trail_Seg_A_E_Prelim_Geotech_Recomm.pdf PDF
Plan_Request.pdf PDF
A-C-CrossSections.pdf PDF
PROJECT_DESCRIPTION.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAB 1: SWPPP/ESCP Narrative

TAB 2: NPDES Permit (Construction General Permit or Corresponding State Permit)

TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence

TAB 4: Delegation of Authority

TABS: Maps

TAB 6: Erosion/Sediment Control Plan Sheets (plan set and BMP typical details)

TAB 7: Permanent Stabilization and Revegetation Plan{plan sets and details)

TAB 8: SWPPP Amendment Log

TAB 9: Erosion/Sediment Control Inspection Reports and Requirements

TAB 10: Corrective Action Log

TAB il: Water Quality Monitoring, Reporting Requirements, and Reports

TAB 12: Training Log

TAB 13: Waste and/or Borrow Site Information

TAB 14: Grading and Stabjlization .Log

TAB 15: Hazardous Spill Plan

TAB 16: Other Applicable Permits(§ 404, § 401, Oregon Remove-Fill Permit)

TAB 17: NPDES Quality Assurance Checklist

TAB 18: NPDES Notice of Termination (NOT)

TAB 3: NOI, EPA/State Acknowledgement, Other Applicable EPA/State Correspondence

NOTE: NOI does not apply to Oregon projects

Ad~itional Constructi~n Site Requirements:

A sign or other notice will be posted conspicuously near the main entrance of the construction site. For linear projects, the sl.gn or other.notice will be posted at a publicly accessible location near the active part of the construction project. ·

If displaying near the main entrance is infeasible, th13 notice can be posted in a local public building such as the town hall or public library. ·

The sign or other notice will contain the following information:

1. A copy of the completed Notice of Intent (NOI) as submitted to the EPA Storm water Notice Processing Center or State Authorization; and

2. The current location of the SWPPP and the name and telephone number of the contact person for scheduling SWPPP viewing .

f .

l.... • • .~.

. f . .. ·. I

'..... '• l,~ ' • ·" .,,_.

r., ,.

. !: ,. • . . i.. . •.J .

":.l/ :~' -~. ;~: .':: : I;: • -~~f' • ~ .... : •, ~ ~-~ :·~ /'

'.~'r ' ~ t' ~ -~'. : , .. ., .. 7 . ..

·r:i• ,;.·; i!:.:.~2 ~ ·; ·.·,].1..~.:::: .'"& •

·;: ~ :~.,r:.A-i::

' . .f

Tab3

CONTRACTOR:

ALASKA PROJECTS ONLY:

File electronic or hard-copy NOI with Alaska Department of Environmental Conservation (ADEC) following instructions at http://dec.alaska.gov/water/wnpspc/stormwater/ APDESeNO I.html

If you do not have an existing my Alaska account, follow ADEC instructions to register.

When filling out your NOI, use the same information as the FHWA NOI in tab 3 AND the following:

@ ·SeCtion I. Single/Multiple NOI Project. Fee has been paid by FHW A

$ Section U. Operator Information. Complete this section using information for

YOUR COMPANY:

After your NOi has been signed or paid, you will receive an email certifying that your application was signed or paid and another after being both signed and paid that your application was successfully submitted.

If you submitted a hard-copy signature page, it may take a few days to process.

Provide a copy of this acknowledgement email to the CO.

·File copy of Contractor's NOI and ADEC Acknowledgement e-mail in Tab 3.

Tah3

CONTRACTOR:

WASHINGTON AND IDAHO PROJECTS ONLY:

File electronic NOi with EPA at http://cfpub.epa.gov/npdes/stormwater/cgpenoi.cfm

If you do not have an existing CDX account with EPA, follow EPA instructions to register.

When filling out your NOI, use the same information as the FHW A NOi in tab 3 AND the following:

• Section HI. Operator Information. Complete this section using information for

YOUR COMPANY.

• Section IV. Project/Site Information. Question. Are you requesting coverage under this NOI as a "federal operator" as defined in Appendix A? ANSWER

YES ..

• · Section IV. Project/Site Information. Question. Have stormwater discharges from your project/site been covered previously under an NPDES permit? ANSWER YES. Provide the FHW A Permit Tracking Number in the EPA acknowledgement email in Tab 3.

• Section VII. Stormwater Pollution Prevention Plan (SWPPP) Information. Use contact information for YOUR COMPANY

• Section X. Certification Information. NOi must .be certified by YOUR responsible corporate officer as defined in CGP I.11.1. If your Certifying Official is a different person than the one preparing the NOI, then the Certifying Official must also have an EPA CDX account.

When the NOI has been completed, it will be electronically delivered to the email address of your Certifying Official. Follow the instructions in the email to complete the Certification of the NOI.

When you have successfully completed and certified your NOI, the preparer and Certifying Official will receive an email from EPA acknowledging that your CGP NOI Certification is complete. Provide a copy of this acknowledgement email to the CO.

File copy of Contractor's NOi and EPA Acknowledgement e-mail in Tab 3.

Please Insert Permanent Soil Stabilizatio11

Structures such as Retaining Walls, Riprap Slope Stabilization and Revegetation

Plans from the Plan Sheets

Inspection Requirements for NPDES Compliance

EPA Construction General Permit Part 4 inspection requirements for NP DES compliance:

Inspection Frequency: You must conduct inspections in accordance with one of the two schedules listed below.

You must specify in your SWPPP which schedule you will be following.

1. At least once every 7 calendar days, OR

2. At least once every 14 calendar days and within 24 hours of the end of a storm event of O .5 inches or greater. (If this option is chosen, a rain gauge is required to be on-site: The SWPPP should also include a daily rainfall log.)

Case-by-Case Reductions in Inspection Freque1tcy: You may reduce your inspection frequency to at least once every month if: · ·

1. The entire site is temporarily stabilized, 2: Runoff is unlikely due to winter.conditions (e.g., site is covered with snow, ice, or the ground is frozen), or

3. Construction is· occurring during seasonal arid periods in arid areas and semi-arid areas.

Inspection Waiver for Frozen Conditions: A waiver of the inspection requirements is aviiilable until one month before thawing conditions are e;x.pected to result in a discharge if all of the following requirements are met:

· 1. The project is located in an area where frozen conditions are anticipated to continue for extended periods of time (i.e., more than one month);

2. Land disturbance activities have been suspended; and

3. The beginning and ending dates of the waiver period are documented in the SWPPP.

Qualified Personnel: Inspections must be .conducted by qualified personnel (provided by the operator or cooperatively by multiple operators). "Qualified personnel" means a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact stormwaterquality and to assess the effectiveness of any sediment and erosion control measures · selected to control the quality of storm water discharges from the construction activity. ·

Scope of Inspections: Inspections must include all areas of the site disturbed by construction activity and areas used for storage of materials that are exposed to precipitation. Inspectors must look for evidence of, or the potential for, pollutants entering the stormwater conveyance system. Sedimentation and erosion control measures must be observed to ensure proper operation. Discharge locations must be inspected to ascertain whether erosion control measures are effective in preventing significant impacts to waters of the United States, where accessible. Where discharge locations are inaccessible, nearby downstream locations must be inspected to the extent that such inspections .are practicable. Locations where vehicles enter or exit the site must be inspected for evidence of off-site sediment tracking.

All reports required by this permit, including tlie SWPPP, S.WPPP amendtitents, and i11spectio11 reports must be sig1ted by a person described in Appendix G, Subsection 11.A (below) or by a duly authorized representative of that person.

1. For a corporation: By a responsible corporate officer. For the purpose of this Part, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge .of a principal business function, or any other person who performs similar policy- 01: decision-making functions for the corporation, or (ii) the manager of one or more manufacturing, production, or operafing facilities, provided, the manager is authorized to make management decisions Which govern the operation of the r~gulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long term environmental compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures.

2. For a partnership· or sole proprietorship: By a general partner or the proprietor, respectivyly; or

· 3. For a municipality, state, federal, or other public agency: By either a principal executivy officer or ranking elected official. For purposes of this Part, a principal executive officer of a federal agency includes (i) the chief executive officer of the agency, or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit ~fthe agency (e.g., Regional Administrator of EPA). · ·

A person is a duly authorized representative only if:

The authorization, is made in writing by a-person described in Appendix G, Subsection I I .A;

The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, positfon of equivalent respon.sibility, or an individual or position having overall responsibility for environmental matters for the company. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and ·

The signed and dated written authorization is included in the SWPPP. A copy must be submitted to EPA, if requested. ·

.l'l'Jrut.,.-~mGHW.AY ADMINISTRATION WFs.rtm:N L.ANDS

DIVISION

SWPl'P CONSTRUCTION SITE INSl11EC1JON lIBPORT

Type of fospection:

0Regular D Post-storm.event .O Reduced inspection frequency period lliui U11.e!re been a sfoir.p11 event since i:lme lastinspect:ion'l' D Yes D No If yes, pirovide:

Estimated Storm Start Date & Estimated Sto~ Duratioµ (hrs):

Approximate Am,ount of Precipitation (in):------

Weather at time t[):lf this iim;pediollll? · D Clear 0Cloudy D Rain' 0 Sleet 0Fog 0 Snowing D High Winds 0 Other:

Temperature: ______ _

WFLBD 157-2 (5/201l)

Site-specific BMPs

• BMP- Describe and give the location of the structural and non-structural BMPs identified in your SWPPP in the BMP column below (add as many BMPs as necessary on the continuation $heels. Include areas that are required to be inspected by the CGP, such as material storage areas that are exposed to precipztation.

• BMP Installed.:._ If a BMP should be installed a.t the current phase of the project and you marked "No" in the "BMP Installed" column, then you must check "Yes" in the "BMP Action Required?" column

• BMP.Action Required? - .If a BMP needs repair, modification, replacement, maintenance or a new BMP is needed or a SWPPP amendment is needed, then a BMP Action is required.

• BMP Action Required, Complete by Date - Before certifYing the report, fill in the date when the BMP Action can reasonably be expected to be completed. When a BMP Action is NOT required, leave the "Complete by Date" blank. ·

• Describe BMP Action, if Needed -Anytime you check "Yes" for "BMP Action Required", then you must also fill in the "Describe BMP Action" column. .

• Delay~d Action Item Report - When a iJMP Action is required and the Complete by Date is not met, you must then fill out. the Delayed Action Item Report to explain why the date was not met. Keep the Delayed A{:tion Item Report in the SWPPP. ·

• Corrective Action Log - When a BMP Action is required as noted in this report, you must also enter all the

· information for this action in the Corrective Action Loi.

BMP & Location BMP BMPAction Describe BMP Action, if Needed Installed? Required?

0Yes QNo 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes LJNo

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

Page2 Project Name:

Inspection Date:

i

BMP & Location

Page3

BMP BMP Acijon Describe BMP Action, if Needed Installed? Required?

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No LJYes 0No f

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date.:

0Yes 0No 0Yes 0No

Complete by

Date:

0Yes 0No 0Ye& 0No

Complete by.

Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No LJYes LJNo

Complete by Date:

LJYesONo 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes 0No 0Yes 0No

Complete by Date:

0Yes LJNo 0Yes LJNo

Complete by Date:

LJYes 0No 0Yes 0No

Complete by Date:

use continuation are additim1al to list.

Project Name:

Overall Site Issues

• BMP or Activity · -- These are some general ~ite issues that must be assessed during inspections.

• Implemented? - If a BMP or activity should be implemented at the current phase· of the project and you check "No", then you must mark "Yes" in the "Corrective Action Required?" column.

• Corrective Action Required? - When maintenance or some other corrective action is required, ~heck

"Yes" in this co.lumn. .

• Corrective Action Required, Complete by Date - When a corrective actio.n is required, before certifying the report, fill in the date when the corrective action can reasonably be expected to be completed. When a corrective action is NOT required, leave the: "Complete by Date" blank .

• Describe Corrective Action, if Needed - Anytime you check "Yes" in the "Corrective Action Required?"

column, you must fill in the "Describe Corrective Action" column as well.

• Delayed Action Item Report - When a Corrective Action is required and the Complete by Date is not met, you must then fill out the Delayed Action Item Report to explain why the daie was not met. Keep the Delayed Action Itein Report in the SWPPP.

• Corrective Action Log - When a Corrective Action is required as noted in this report, you must also enter all the information for this action in the Corrective Action Log

BMP or Activity Implemented? Corrective Describe Corrective Action and Location, if Needed Action Required?

Have stabilization 0Yes 0No 0Yes 0No mea:;ures been initiated on slopes and disturbed Complete ·by areas not actively being Date:

worked?

Are natural resource 0Yes 0No 0Yes 0No areas (e.g., streams, wetlands, mature trees, Complete by etc.) required by the Date:

SWPPP to be delineated in the field, identified with barriers or markin_gs?

Are perimeter controls 0Yes 0No 0Yes 0No and sediment barriers

. adequately installed Complete by (keyed into substrate) .Date:

and maintained?

Are .storm drain inlets 0Yes 0No 0Yes 0No prpperly protected? Complete by

Date:

Are the construction 0Yes 0No OY~s LJNo ' exits preventing sediment from being Complete by tracked· into the street? Date:

Is trash/litter from work 0Yes 0No 0Yes 0No areas collected and placed in covered Complete by dumpsters? Date:

Are washout facilities 0Yes 0No 0Yes 0No (e.g., paint, concrete) available, clearly Complete by marked, and maintained? Date:

Page4 Project Name:

BMP or Activity Implemented? Corrective Describe Corrective Action and Locatio111if Needed ·'

Action Required?

8 Are vehicle and 0Yes 0No 0Yes 0No equipment fueling, cleaning, and Complete by maintenance areas free Date:

of spills, leaks, or any other deleterious material?

9 Are materials that are 0Yes 0No 0Yes O·No potential stonnwater Complete by contaminants stored Date:

inside or under cover?

10 Are non-stonnwater 0Yes 0No 0Yes 0No discharges (e.g., wash Complete by water, dewatering) Date:

properly controlled?

Overall Site Issue Answer to Corrective Question Action Describe Corrective Action and Location, if Needed

Required?

l. At the time of 0Yes 0No 0Yes 0No inspection, ate the Complete by discharge points and Date:

receiving waters free of pollutant discharges (sediment deposits, sediment plume or oil sheen)? (See continuation page for list of discharge points)

2 Since the last inspection; 0Yes 0No 0Yes 0No are the discharge points Complete by and receiving waters free Date:

of evidence that pollutants had left the project site (for example, sediment deposits, oily residue)?· (See continuation page for list .of discharge points) ·

3 Has Spill Response kit 0Yes 0No LJYes LJNo been used since the last Complete by inspection? If yes, has Date:

stock been maintained?

4 . Are any additional 0Yes 0No 0Yes 0No BMPs needed? Complete by

Date:

5 (Other) LJYes L.JNo LJYes 0No

D Complete by Date:

Page5 Project Name:

Scope oflnspection

Did you inspect all areas of the project that are 0Yes 0No If you did not inspect any required. areas, list those required to be inspected by the CGP (areas locations here and explain why they weren't inspected.

disturbed by construction activity, areas used for storage of materials that are exposed to precipitation, discharge locations and locations .where vehides enter or exit the site)?

• Check the box below if the project is in compliance with the CGP and the SWPPP:

DI certify that on the date of this inspection, this project was found to be in compliance with the terms ofits Storm Water·Pollution Prevention Plan and the curn~nt Construction General Permit.

• If there are incidences of non-compliance, then do not check the box above.

• When you don't check the box above, then you must describe each incident of non-compliance and the· actions that are·needed to bring the project into compliance.

• If there is an Action Item described in the non-compliance box· that does not already have a "Complete by

Date" assigned elsewhere in this report, then add a completion date Within the box.

Non-Compliance

Incidence of Non-compliance:

Action Item and Complete by Date:

CERTIFICATION STATEMENT

"I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am.aware that there· are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations."

Contractor's Duly Authorized Representative FHW A's Duly Authori:ied Representative

Print name: Print Name:·

Title: Superintendent Title: Proj~t Engineer Signature: Signature:

Page6 Project Name:

Please I11sert Water Quali~y Mo11Jto!:i~1g ~eg:q.~ren1ent~ and 401 Permit

Please Insert Waste or Borrow Site Plan Sheets

Please Insert Jlazardous Spill Plan

OREGON INVENTORY OF HISTORIC PROPERTIES

SECTION 106 LEVEL OF EFFECT FORM

Continuation Sheet

Agency/Project: FHWA-Westem Federal Lands Highway Division & Oregon Department of Transportation/

Historic Columbia River Highway State Trail: Wyeth-Starvation Creek Project

FHWA Project. No. OR PFH 163(019) and OR DOT CRGNSA 100(1), ODOT Key No. 17686

Property Name: Columbia River Highway National Register District

Street Address: Historic Columbia River Highway, Historic Mile Post 52.69 to Historic Mile Post 57 .04 City, County: Cascade Locks vie., Hood River between Viento State Park and Hood River, east of the current project. When completed, the current project, and the one follovving, it, will represent the last part of a multi-phase, multi-year action to reconnect the Columbia River Highway from the Sandy River, near Troutdale, to Chenoweth Creek, near The Dalles. It will offer bicyclists an alternate route to Interstate 84 through the· Columbia Gorge on drivable segments of the Historic Columbia River Highway and on bike/pedestrian segments ofthe Histori.c Columpia River Highway State Trail. In addition, the Historic Columbia River Highway State Trail segments alsc offer recreation opportunities for bicyclists and pedestrians to explore the Columbia Gorge on a transportation facility dedicated to non-motorized use.

The project includes the following components:

1. At HMP 52.69, construct a trailhead with parking and other improvements immediately west of the Gorton Creek Bridge.

2. From HMP 53.0 to 54.0, construct a bike/ped trail where the CRH no longer exists.

3. From HMP 54.0 to 54.84, rehabilitate extant, but low integrity segment of the CRH at Shellrock Mountain, behind the rock catchment binwall along Interstate 84, for bike/ped use.

4. From HMP 54.84 to 55.0, construct a bike/ped trail where the CRH no longer exists.

5. From HMP 55.0 to 55.46, rehabilitate Summit Creek-Lindsey Creek segment of the CRH for bike/ped use.

6. From HMP 55.46 to 56.47, construct a bike/ped trail where the CRH no longer exists.

7. From HMP 56.47 to 56.77, rehabilitate Starvation Creek segment of the CRH for bike/ped use.

8. From HMP 56.77 to 57.0, construct a bike/ped trail in the Starvation Creek Trailhead parking lot from the east end of Starvation Creek segment to the west end of the rehabilitated Starvation Creek to Viento segment.

IDENTIFICATION AND DESCRIPTION OF HISTORIC PROPERTY

The Columbia River Highway National Register District is located in the state of Oregon, along the south side of the Columbia River between the cities ofTroutdale (14.2 miles east of Portland) and The Dalles (88 miles east of Portland). The Columbia River Highway was the first modern highway in the Pacific Northwest and the first scenic highway in the United States. The road became a trunk route from Portland's large commercial center to eastern Oregon and points beyond. The highway's alignment remains true to the plan that Samuel C. Lancaster, Samuel Hill, and others envisioned for its original configuration.

The road was the pinnacle of early-20th-century rural highway design created to take visitors to the Columbia River Gorge's most breathtaking and beautiful natural wonders and scenic vistas. Construction on the Columbia River Highway took place from 1913 to 1922. The Keeper of the National Register listed the Columbia River Highway Historic District on December 12, 1983 (NRIS 83004168).

The nomination's preparer described the district as narrow and linear shaped. It runs 73.8 miles, the length of the original highway from the Sandy River to The Dalles. The nominated highway within that 73.8-mile distance is the extant 55 miles.

This is defined as "those portions which are still intact with observable engineering features of the original highway present (pavement, guard rails, retaining walls, bridges, viaducts, tunnels, pedestrian overlooks, and distinctive cuts and fills) Smaller fragments do exist and are included in the nominations area, but are not included in the calculations" (see sheet 10.8 of the NR nomination). All observable pieces of the Columbia River Highway within the project's Area of Potential Effect (APE are included within the nomination property. In addition, one structure within the APE is a contributing feature to the distri"t It is the Gorton Creek Bridge No. 00173, which dates from 1918.

The National Register nomination divided the Columbia River Highway Historic District into three sections. Section 1 included the road and contributing features from the Sandy River to Dodson (HMP 14.2 to 35.8). Section 2 included the road and contributing features from Dodson to Mosier (HMP 35.8 to 73.4). Section 3 included the road and contributing features from Mosier to The Dalles (HMP 73.4 to 88.0). The project is in Section 2, from HMP 52.69 to 57.0.

H-65

Wildlife Habitat Plan ................................................................................................................ A-18 Schedule .................................................................................................................................... A-21 Maintenance .............................................................................................................................. A-21 Monitoring ................................................................................................................................ A-21

Attachment 2. Photographs ........................................................................................................... A-24

CRG819 29 of 70

Permit Project: OR DOT CRGNSA 100(1 ), Historic Columbia River Highway State Trail OR DOT CRGNSA 100(3), Historic Columbia River Highway Summit Creek Viaduct OR HOODRIVER 18(1), Wyeth Trailhead

Please Insert NPDES Notice of Termination

Table of Contents
Tab 1
Tab 2
Tab 3
Tab 4
Tab 5
Tab 6
Tab 7
Tab 8
Tab 9
Tab 10
Tab 11
Tab 12
Tab 13
Tab 14
Tab 15
Tab 16
Tab 17
Tab 18

File details come from the government source that posted it. Updated .