Giant Voice Expansion for RAF Fairford and RAF Welford
Closed Solicitation Posted
- Solicitation number
- FA557023R0004
- Agency
- Air Forces Europe and Africa Air Force, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 334220 Radio and Television Broadcasting and Wireless Communications Equipment Manufacturing
- Place of performance
- United Kingdom
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to expand two existing standalone Giant Voice emergency notification systems located at Royal Air Force bases in Fairford and Welford, United Kingdom. The United States Air Force 501st Combat Support Wing located in Europe and Africa is requesting a contractor engineer, design, furnish, install, and test expansions to the systems. The expansions must add new remote speaker sites and upgrade existing control centers. Proposals will be evaluated on a lowest price, technically acceptable basis. Proposals are due by June 30, 2023.
There is no set-aside designation. The work involves expanding public address and notification systems under NAICS code 334290. The place of performance is the United Kingdom. The expansion at RAF Fairford must add five new remote speaker sites by reusing the existing UHF frequency and upgrading two existing control centers while relocating one. The expansion at RAF Welford shall add one new remote speaker site and upgrade one control center, reusing the VHF frequency. Both expansions must integrate new equipment while ensuring continued operations and be completed by December 2023.
Notice text
This Statement of Objectives (SOO) defines requirements for Contractor to Engineer, Design, Furnish, Install, and Test (EDFI&T) expansions to add and integrate five (5) new RSSs into the existing standalone GV system at RAF Fairford and one (1) new RSS into the existing standalone GV system at RAF Welford to provide for areas lacking real-time intelligible acoustic coverages. The GV expansion at RAF Fairford shall reuse the existing UHF frequency for the digital two-way UHF radio communications links, and the GV expansion at RAF Welford shall reuse the existing VHF frequency for the digital two-way VHF radio communications links. The GV expansion at RAF Fairford shall include upgrading two (2) existing outdated CCSs, adding and integrating one (1) new CCS, and relocating one (1) existing RSS. The GV expansion at RAF Welford shall include upgrading and relocating one (1) existing outdated CCS. All GV expansions shall also include configuration, integration, equipment reuse and upgrade, radio equipment, wooden poles, AC circuit extensions, battery backups, solar panels, lightning protection, grounding, cabling, and other components necessary to complete and place each standalone expanded GV system at RAF Fairford and Welford in full service.
Detailed description of requirements are located within Attachment 2 - Statement of Objectives
Attachments
| File | Type | Posted |
|---|---|---|
| FA557023R0004_QandA.docx | DOCX document | |
| Attachment 2 SOO RAF Fairford_Welford GV Expansion v1.pdf | ||
| Combined Solicitation - FA557023R0004_printed.pdf | ||
| Attachment 3 - Past Performance Questionnaire (1).pdf | ||
| Attachment 1 - Pricing Sheet.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Giant Voice Expansion for RAF Fairford and RAF Welford | Solicitation | |
| Giant Voice for RAF Fairford and RAF Welford | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity