Awarded NKRD Maintenance Repairs
Closed Solicitation Posted
- Solicitation number
- 127EAX24Q0028
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Williams, Arizona 86046, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is seeking contractors to perform maintenance repairs and improvements at four government facilities located on the North Kaibab Ranger District of the Kaibab National Forest. The work includes replacing underground water system components, backflow preventers, electrical equipment, plumbing fixtures, and a sewer line. The contractor will also be required to install a French drain with drainage culvert, and a new electrical circuit with outlet on an existing steel lookout tower. The solicitation uses a Firm Fixed-Price contract with a Request for Quote (RFQ) procurement method, evaluated on a Lowest Price Technically Acceptable basis.
This contract opportunity is set aside for small businesses under NAICS code 237310 - Highway, Street, and Bridge Construction. The anticipated award value is between $25,000 and $100,000, with a 180-day period of performance after notice to proceed. The work will take place at various locations in Williams, Arizona 86046. The incumbent contractor is Rusty Bucket Construction, who was awarded the contract on August 22, 2024 for $94,965.16.
Notice text
4 versions
Update #4 · Latest ·
Awarded-- Rusty Bucket Construction
See attached Award notification for the particulars
7/15/2024 Amended Solicitation submittal date:and added questions and answers
Submittal date extended from 7/12/2024 to 7/29/2024 at 12:00 pm
7/15/20246/28/2023--Added specifications_summary of work attachment
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the replacment of two (2)
underground water system control valves, one (1) 4” backflow preventer assembly, two
(2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one
(1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length).
The contractor is also responsible for furnishing all labor, equipment, transportation, and
specified materials/supplies necessary to complete the following new improvements. One
(1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert
(approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on
existing steel lookout tower (intended outlet location is approximatly 100’ above ground
level)
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the repair/replacement of the
existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A). The intent
of this contract is to either clear the blocked sewer line using non-destrictive methods or
to completely replace the blocked section of sewer (damaged sections of sewer line shall
not be left in-place without adaquate repair to fully restore integrity of sewer pipe).
Contractor will be responsible for investigating the nature of the blockage, and
determining the appropriate course of action to bring the blocked sewer into full working
order. If the sewer pipe is found to be physically compromised, then replacment of the
compromised section will be requiered. Only one of the two bid items, #9 and #9A will
be paid. Contractor is responsible for coordinating with COR during the process to elect
which bid item will be necessary for successful repair of the sanitary sewer
Update #3 ·
7/15/2024 Amended Solicitation submittal date:and added questions and answers
Submittal date extended from 7/12/2024 to 7/29/2024 at 12:00 pm
7/15/20246/28/2023--Added specifications_summary of work attachment
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the replacment of two (2)
underground water system control valves, one (1) 4” backflow preventer assembly, two
(2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one
(1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length).
The contractor is also responsible for furnishing all labor, equipment, transportation, and
specified materials/supplies necessary to complete the following new improvements. One
(1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert
(approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on
existing steel lookout tower (intended outlet location is approximatly 100’ above ground
level)
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the repair/replacement of the
existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A). The intent
of this contract is to either clear the blocked sewer line using non-destrictive methods or
to completely replace the blocked section of sewer (damaged sections of sewer line shall
not be left in-place without adaquate repair to fully restore integrity of sewer pipe).
Contractor will be responsible for investigating the nature of the blockage, and
determining the appropriate course of action to bring the blocked sewer into full working
order. If the sewer pipe is found to be physically compromised, then replacment of the
compromised section will be requiered. Only one of the two bid items, #9 and #9A will
be paid. Contractor is responsible for coordinating with COR during the process to elect
which bid item will be necessary for successful repair of the sanitary sewer
Update #2 ·
6/28/2023--Added specifications_summary of work attachment
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the replacment of two (2)
underground water system control valves, one (1) 4” backflow preventer assembly, two
(2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one
(1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length).
The contractor is also responsible for furnishing all labor, equipment, transportation, and
specified materials/supplies necessary to complete the following new improvements. One
(1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert
(approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on
existing steel lookout tower (intended outlet location is approximatly 100’ above ground
level)
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the repair/replacement of the
existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A). The intent
of this contract is to either clear the blocked sewer line using non-destrictive methods or
to completely replace the blocked section of sewer (damaged sections of sewer line shall
not be left in-place without adaquate repair to fully restore integrity of sewer pipe).
Contractor will be responsible for investigating the nature of the blockage, and
determining the appropriate course of action to bring the blocked sewer into full working
order. If the sewer pipe is found to be physically compromised, then replacment of the
compromised section will be requiered. Only one of the two bid items, #9 and #9A will
be paid. Contractor is responsible for coordinating with COR during the process to elect
which bid item will be necessary for successful repair of the sanitary sewer
Update #1 ·
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the replacment of two (2)
underground water system control valves, one (1) 4” backflow preventer assembly, two
(2) electric heaters, two (2) roof penetration boots, one (1) propane shut-off valve, one
(1) electric incinerating toilet, and one (1) ¾” PEX water line (approximatly 3” in length).
The contractor is also responsible for furnishing all labor, equipment, transportation, and
specified materials/supplies necessary to complete the following new improvements. One
(1) French Drain (21’L x 2’W x 2.5’D) and associated underground 4” drainage culvert
(approximatly 65 L.F.), one (1) 120v, 15 amp circuit with quadplex outlet installed on
existing steel lookout tower (intended outlet location is approximatly 100’ above ground
level)
The Contractor shall be responsible for furnishing all labor, equipment, transportation,
and specified materials/supplies necessary to complete the repair/replacement of the
existing 4” sanitary sewer at Big Springs Work Center (Bid Items #9 and #9A). The intent
of this contract is to either clear the blocked sewer line using non-destrictive methods or
to completely replace the blocked section of sewer (damaged sections of sewer line shall
not be left in-place without adaquate repair to fully restore integrity of sewer pipe).
Contractor will be responsible for investigating the nature of the blockage, and
determining the appropriate course of action to bring the blocked sewer into full working
order. If the sewer pipe is found to be physically compromised, then replacment of the
compromised section will be requiered. Only one of the two bid items, #9 and #9A will
be paid. Contractor is responsible for coordinating with COR during the process to elect
which bid item will be necessary for successful repair of the sanitary sewer
Files
| File | Type | Posted |
|---|---|---|
| Award Notification.pdf | ||
| Questions_Answers.docx | DOCX document | |
| 127EAX24Q0028 SF1442.pdf | ||
| 127EAX24Q0028 Synopsis_Solicitation.pdf | ||
| SPECIFICATIONS_summary of work.docx | DOCX document | |
| 127EAX24Q0028 Synopsis_Solicitation.pdf | ||
| 127EAX24Q0028 SF1442.pdf | ||
| BioPreferred.pdf | ||
| WD AZ20240043.txt | TXT text file | |
| EX-1 JACOB LAKE WORK CENTER - UTILITY PLAN.pdf | ||
| EX-3 BIG SPRINGS WORK CENTER - UTILITY PLAN SOUTH.pdf | ||
| EX-2 BIG SPRINGS WORK CENTER - UTILITY PLAN NORTH.pdf | ||
| Fire Plan.pdf |
Show all 13
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Barillas Peak & Encino Vista Lookout Tower Restoration, Santa Fe NF | Forest Service | Total Small Business | |
| New Mexico Forest Engineering and Road Maintenance (FERM) | Forest Service | Total Small Business | |
| Fenn Ranger Station roofing replacement | Forest Service | Total Small Business | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest Service | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity