N091--PROJECT # 528-18-110 Fuel Oil Tank Replacement BUFFALO VAMC
Closed Solicitation Posted
- Solicitation number
- 36C24226B0057
- Agency
-
Veterans Integrated Service Network 2
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Buffalo, New York 14215, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2 seeks construction services to remove three existing 40,000-gallon fuel oil tanks and one 7,500-gallon spill connection tank at Buffalo VAMC and replace them with appropriately sized modern tanks and updated monitoring and control systems, with proposals due September 3 and bid deadline extended to September 4. The procurement is a Service-Disabled Veteran-Owned Small Business set-aside.
Place of performance is Snyder, New York 14215. The project requires contractor to provide all supervision, labor, services, tools, equipment, and materials for tank removal, installation of replacement systems, and regulatory compliance improvements including maintainability enhancements and backup fuel supply requirements. The NAICS code is 237110, Water and Sewer Line and Related Structures Construction; PSC is Y1DA, Construction of Hospitals and Infirmaries.
Base contract duration is 420 calendar days from Notice to Proceed, with physical onsite construction anticipated to begin in Spring 2027 and award anticipated October 1, 2026. The contractor must maintain a 16,000-gallon temporary fuel oil supply throughout performance and manage removal of approximately 200 cubic yards of petroleum-impacted soil. Current fuel inventory across three tanks totals approximately 46,012 gallons of No. 2 fuel oil, consumed at approximately 75 gallons monthly. Boiler shutdown is limited to two boilers for longer than 24 hours during cooling season (May through late September) and one boiler for periods exceeding 12 hours during heating season (September through May). The contractor must employ separate full-time Site Safety and Health Officer and Quality Control Manager positions distinct from the project superintendent and must develop a Critical Path Method schedule within 45 days of Notice to Proceed with monthly cost-loaded updates. New tanks must include approximately 100 building automation control points. Loading dock access must remain unobstructed Monday through Friday 6:30 AM to 4:00 PM; shutdowns require minimum four-week advance notice. Prevailing wage applies per NY wage determination NY20260050, effective May 18, 2026. Buy American Certificate and SDVOSB subcontracting limitations at 85 percent for general construction apply.
Notice text
The general scope of this project is to remove the existing three (3) 40,000-gallon fuel tanks and one (1) 7,500-gallon spill connection tank and replace them with appropriately sized modern tanks and to replace the monitoring/control systems to improve maintainability, meet the backup fuel supply requirements, and meet regulatory compliance requirements.
The Buffalo VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation. See SOW and Solicitations documents
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| N091--PROJECT # 528-18-110 Fuel Oil Tank Replacement BUFFALO VAMC | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| H999--Underground Fuel Storage Tank Cleaning, Inspection, Testing and Re-Fueling | Veterans Integrated Service Network 21 | No set-aside | |
| Y1DA--NRM-CONST 528-CSI-102 Urology Equipment Site Prep | FY27 NRM | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Y1DZ--replace chilled water pump at the boiler plant | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| F109--Underground Diesel Storage Tank Boot Replacement , Fargo VA Healthcare System. | Veterans Integrated Service Network 23 | Service-Disabled Veteran-Owned Small Business | |
| J091--Aboveground Fuel Tank Inspection Services - Kansas City VAMC | Veterans Integrated Service Network 15 | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity