Multi-Award ID/IQ Construction and Facilities Maintenance Contract for the Montana and Idaho Forest Service Job Corps Centers

Award Notice Posted

Solicitation number
1282A718R0006
Agency
Awarded
to RB Construction Company
Set-aside
Total Small Business

Opportunity facts

Contract number
1282A718D0007 Federal IDV award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record
Place of performance
See Above, United States

Notice details come from SAM.gov. Updated .

Notice text

11 versions

Update #11 · Latest ·

3 of 4 Multi-Award ID/IQ Contracts

Update #10 ·

4 of 4 Multi-Award ID/IQ Contracts

Update #9 ·

2 of 4 Multi-Award ID/IQ Contracts

Update #8 ·

1 of 4 Multi-Award ID/IQ Contracts

Update #7 ·

This offical Amendment addresses additional contractor asked questions and extends the closing date to July 16, 2018.

Update #6 ·

No SF-30 - Amendment will be posted  with this Amendment.  The Award Notice was made in Error and should have been posted to 1282A718R0005 instead, disregard the Award Notice of this RFP.  Unfortunately FBO does not allow you to go back and make corrections or changes to award and/or posting notices. 

The soliciation remains open and closes on July 9, 2018 by no later than 12PM Mountain Time.

Update #5 ·

1 of 3 Multi-Award ID/IQ Contracts.

Update #4 ·

Amendment 0001 - Addresses additional Contractor asked questions.  It does NOT extend the closing date, and remains July 9, 2018, by 12PM Mountain Time.

Update #3 ·

Full solicitation is now posted as of May 25, 2018.

Amendment 0001 - Addresses Contractor asked questions and extends the closing date to July 9, 2018.

Update #2 ·

Full solicitation is now posted as of May 25, 2018.

Update #1 ·

The USDA - Forest Service WO-AQM Job Corps Support Branch has identified the need to issue a single solicitation and award three (3) or more Indefinite Delivery/Indefinite Quantity (ID/IQ) contracts for the two (2) Montana and One (1) Idaho State Forest Service operated Job Corps Centers as authorized by FAR 16.504 (c)(1). The three (3) Forest Service operated Job Corps Centers will only include:

Anaconda Job Corps Center
1384 Foster Creek Road
Anaconda, MT 59711
Deer Lodge County, MT


Trapper Creek Job Corps Center
5139 W. Fork Road
Darby, MT 59829-9609
Ravalli County, MT


Centennial Job Corps Center
3201 Ridgecrest Drive
Nampa, ID 83687-8399
Canyon County, ID


The solicitation and resulting multi-award ID/IQ Contracts will be for construction and facility maintenance and repair projects. The base ID/IQ contracts will not be funded. The construction and facility maintenance and repair projects will be issued through separate Task Orders on an as needed basis, and competed against all the awarded ID/IQ holders throughout Period of Performance of base ID/IQ contracts.


The following list indicates various work projects and tasks that the Forest Service is intending to issue. These are just examples only and the actual tasks may vary. The Task Order will indicate the actual statement of work which the contractor(s) will bid for and construct.
1) Energy efficient lighting retrofits for interior and exterior application
a) Lighting fixtures and assemblies
b) Ceiling replacement anticipated in some applications.
c) Wiring, conduit, controls and panel board modification and troubleshooting.
d) Light Tube application optional.
e) LED lighting to be considered.
f) LED EXIT light replacement, which may include the coordination of the proper disposal of existing Tritium Gas EXIT signs per NRC regulations.
2) Retrofitting thermal envelopes on existing buildings.
a) Demolish finish or siding surface of exterior walls or ceiling/ roofs.
b) Install combination or high R insulations to replace or add to existing.
c) Install and test air barrier to meet 0.05 cfm/sf @ 50 Pascal using 3rd party testing.
d) Install wrap and flashings to windows and other critical assemblies.
e) Replace interior and/or exterior surface with Green and sustainable materials.
f) Reglazing of existing windows and removal and caulking (sealing) around, windows, doors, and other envelope penetrations.
3) HVAC systems upgrades/performance improvements/troubleshooting.
a) Meet or exceed 30% energy reduction as compared to existing system or as directed in the TO.
b) Correct and replace system components, distribution problems and controls to achieve maximum occupancy comfort.
4) Window and door replacements to achieve maximum thermal performance and operation inefficiencies.
a) Interior/Exterior Doors, rated and non-rated
b) Overhead door and door operator replacement and/or repairs
5) Plumbing, water and wastewater upgrades/performance improvement that will conserve water and reduce pollution.
a) Replace and upgrade fixtures.
b) Upgrade distribution system and piping and other.
c) Replace hot water heating devices/boilers with Energy Star products where applicable.
d) Above/Underground leak detection and repairs
6) Photo Voltaic (PV) system installations and/or wind generation systems.
a) Install complete PV systems to provide required percentage of total building load as per Task Order.
b) Include complete installation and device needed to interface with existing systems.
c) All electrical installation shall meet NEC standards. Solar Panels Installation by NABCEP Certified Installer
7) Solar hot water Retrofits
8) Biomass heating system upgrades.
a) Provide biomass delivery, storage, application, combustion and distribution systems to interface with existing applications.
9) Electrical load reduction/troubleshooting
a) Evaluate existing system and reduce significant high electric load devices.
b) Replace dated, non-code compliant or old equipment
10) Roofing Replacement
a) Demolish existing roofing and/or other substrates.
b) Investigate and Repair Roof Leaks
c) Construct new roofing systems.
11) Siding Replacement
a) Demolish or cover existing siding systems.
b) Dispose of any hazardous material substances in State approved sites.
c) Construct new siding systems and trim with a minimum 15year warranty.
12) Painting
a) Provide interior or exterior painting to manufacturer's recommended installation practices.
b) Use green and low VOC paints that meet or exceed LEED standards as approved by the COR.
13) On-site well renovation and upgrade.
a) Upgrade existing wells, casings, pumps and equipment.
b) Replace distribution systems.
c) Abandon existing wells in accordance with State and/or federal regulations.
d) Drill and install new wells (includes new hand pumps or pressurized systems)
14) On-site utility systems
a) Upgrade, repair or modify existing wastewater, power, gas lines or fuel systems.
15) Parking, road, sidewalk, and drainage structures.
a) Upgrade, repair or replace existing pavement systems, substrates or drainage systems
b) Restripe and mark paving.
c) Include signs as needed.
d) Regrade and reshape roadways
e) Gravel resurfacing of existing road ways
f) Clearing and brushing of existing roadways
g) Ditch cleaning and reshaping
h) Chip sealing and other surface treatments of existing roads
i) Culvert replacement
j) New roadway installation/construction.
16) Condition Surveys, Inspections and investigations
a) Bridge Safety Inspections
b) Dam safety Inspections
c) Water & waste water Condition surveys
d) Sanitary Surveys
e) Road Condition Surveys
f) Geotechnical Investigations
g) Site Surveys
17) Construct and install Pre-Engineered and modular building systems
a) Metal buildings
18) Install fencing and security gate systems
a) Perimeter fencing
b) Road closure gates
c) Automated card or keypad activated gates
d) Associated power and utility systems.
19) Landscape Improvements
a) Plant vegetation.
b) Develop and shape sites for drainage and water retention.
c) Construct features, curbing, walls, paving, signage, exterior lighting and associated systems.
20) HomeLand Security Upgrades and Security Upgrades
a) Electronic security, controls, and monitoring systems.
b) Traffic control and surveillance equipment
c) Video camera equipment
d) Physically security feature upgrades.
e) Radio tower upgrades.
f) Electronic door locking system and card/FOB reader systems.
21) Dismantling, Demolition and/or Removal of Improvements
a) Evaluate/Test building/location for hazardous materials prior to demolition/removal
b) Remove and dispose of all hazardous materials in Federal and State approved sites.
c) Demolish infrastructure in safe and an OSHA regulated manner.
d) Recycle building materials as per EPA waste management regulations.
e) Remove all sub-surface structures and stabilize site & soils as per Task Order.
f) Disconnect all utilities
22) Placement and procurement of aggregate and rock to the requirements of the Task Order
23) Control of herbaceous/woody invasive species
a) Control by mechanical or herbicide application
24) Environmental Remediation and Abatement Activities
a) Mold remediation
b) Asbestos removal and cleanup
c) Lead paint removal and cleanup
25) Career Technical Student Training (CTST) Supplies and services
a) Supply materials for CTST projects on Center
26) Equipment installation/repair
a) Walk-in refrigerator and/or freezer units
b) Larger commercial appliances
27) 24/7 Emergency Response/Repair Services
28) Fire detection/alarm and Fire Suppression Systems repairs/replacement


The Contractor (s) shall furnish all the necessary supervision, management, personnel, material, equipment, services and facilities. All interested contractors who provide a response to this solicitation must be capable of providing ALL work listed above and in solicitation, either through self-performance or subcontracted performance.
This requirement will be issued as a Request for Proposal (RFP), under FAR Part 15. The RFP will result in three (3) or more ID/IQ base awards with a base year and four (4) one year options from the terms and conditions set forth in the solicitation once it is released. It is anticipated that the maximum value of each ID/IQ will be set at $3Million with a $10,000.00 minimum guarantee.


The North American Industry Classification System (NAICS) is 236220. The size standard is $36.5.


This requirement will be set aside exclusively to Small Business concerns as authorized by FAR 19.502-2 (b).


The contractors must perform to all applicable Department of Labor wage determinations which will be included at Task Order Level only. The wage determinations may include either Construction Wage Determinations (Davis-Bacon) or Service Contract Act Wage Determinations depending on nature of work at Task Order Level.


The solicitation will include two (2) seed projects that will be used for price and/or cost analysis to determine fair and reasonable. The two (2) seed projects will include:

Wastewater Treatment Plant Sludge Removal - Anaconda Job Corps Center
Shower Room Replacement - Anaconda Job Corps Center


Once three (3) or more ID/IQ awards are selected for award based on non-price factors that will be stated in solicitation; the lowest price of the ID/IQ holders will be selected for award of the two (2) seed projects. One or more of the two (2) seed projects may be awarded to a single contractor.


There will be no formal site visit, and all vendors are encouraged to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
The specifications WILL NOT be provided in a paper hard copy format or CD ROM, and will only be posted on the Federal Business Opportunities (FBO) website after May 18, 2018. The address for downloading this solicitation from the Internet is https://www.fbo.gov. Registration and downloading from the Internet is free of charge; however, some specifications may take a considerable amount of time to download. All prospective offerors are required to register on the Federal Business Opportunities (FEDBIZOPPS) website for this procurement. An official plan holders list will be maintained on and can be printed from the website. If you fail to register, the Government cannot be responsible for your being notified of any amendments to the solicitation. Notification of any changes to this solicitation (amendments) shall be made only on the internet through FBO. Therefore, it is the contractor's responsibility to check the Internet site daily for any posted changes to the solicitation.
In addition, all contractors doing business with the Federal Government must be registered in the U.S. Contractor Registration System SAMS at https://www.sam.gov. NOTE: Offerors should submit verification of their firm's registration in the SAMS database with their offer.


Full solicitation requirements will be posted at time solicitation in posted.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors