PART I - THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
Solicitation – 1282A718R0006
Seed Project 2 – Sewer Biosolids Removal
Anaconda Job Corps Center Anaconda, MT 59711
Deer Lodge County, Montana
Item Method of Estimated Unit No. Description Measurement Unit Quantity Price Total
001 Sewer Biosolids Removal EA Gallon 90,500 $ $
BASE ITEMS TOTAL $
Lump Sum Quantities: These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
FAR 36.204 Disclosure of the magnitude of construction projects
The Government’s estimate is: Between $100,000 and $250,000
SEWAGE LAGOON SLUDGE REMOVAL 010150 – 1
ANACONDA JOB CORPS CCC GENERAL REQUIREMENTS
SEWAGE LAGOON SLUDGE REMOVAL
ANACONDA JOB CORPS CIVILIAN CONSERVATION CENTER
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:
1. Removal and disposal of 90,500 gallons of sludge from the sewer lagoon. Sludge shall be disposed of in an approved municipal sewer treatment facility.
2. The lagoon is 154 feet long, 89 feet wide, 7.6 feet deep with 2:1 side slope.
Measured average thickness of sludge is 18.6 inches.
3. Potential sites for disposal of the sludge are Anaconda Public Sewer Lagoon and
Butte City Sewer.
4. Past Work Experience: Contractor must have completed at least 3 similar projects in the last 10 years.
5. All work to meet Federal Environmental Protection Agency (EPA) standards and
Montana Department of Environmental Quality (DEQ) standards.
1.2 LOCATION
A. This project is located at the Anaconda Job Corps Civilian Conservation Center approximately eight miles west of Anaconda Montana on State Highway 1. The address is 1407 Foster Creek Road, Anaconda, MT, 59711. Driving directions can be obtained by calling the Center at (406) 563-8700.
1.3 PROJECT SCHEDULING
A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.
1.4 POINT OF CONTACT
Center Point of Contact: Brett Hackman, 406-563-8736, bhackman@fs.fed.us
1.5 USE OF PREMISES
A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate
SEWAGE LAGOON SLUDGE REMOVAL 010150 – 2
Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.6 WORK RESTRICTIONS
A. Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
1.7 PERMITS
A. State Electrical Inspection is required for this project. Obtain permits for electrical work if the State Electrical Inspector requires a permit to do the inspection.
1.8 SCHEDULE OF ITEMS
A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items.
1. Provide pricing for all items listed in the Schedule of Items.
2. Contract award will be made for all Base Items.
B. Base Items (BI):
1. Base Item No. 1- Sludge Removal and Disposal
a. Measurement: This item is measured as a Lump Sum quantity.
b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove and dispose of 90,500 gallons of sludge from the sewage lagoon.
PART 2 – SUBMITTAL PROCEDURES
2.1 DEFINITIONS
A. Action Submittals: Written and graphic information that requires Government approval.
B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.
2.2 PROCEDURES
A. Contractor Responsibilities
SEWAGE LAGOON SLUDGE REMOVAL 010150 – 3
1. Review each submittal and check for compliance with the Contract Documents.
2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.
3. Include the following information on label or cover sheet for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Date of Contractor’s approval.
i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.
4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.
5. Unless additional copies are required for final submittal, and unless the Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
6. Only final submittals with mark indicating action taken by Government are to be used for construction.
7. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
B. Processing Time: Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Government will review initial submittal within 10 working days.
Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.
2.3 ACTION SUBMITTALS
A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
1. Submit two copies of each submittal, unless otherwise indicated. CO will return one copy. Mark up and retain one returned copy as a Project Record Document.
Electronic submission of PDFs is an acceptable alternative to paper submission.
B. Collect information into a single submittal for each element of construction and type of product or equipment.
SEWAGE LAGOON SLUDGE REMOVAL 010150 – 4
1. Mark each copy of each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
e. Wiring diagrams showing factory-installed wiring.
f. Compliance with recognized trade association standards.
g. Compliance with recognized testing agency standards.
C. Required Action Submittals
1. None
2.4 INFORMATIONAL SUBMITTALS
A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.
1. Submit one copy of each submittal, unless otherwise indicated. CO will not return copy. Electronic submission of PDFs is an acceptable alternative to paper submission.
2. Provide a statement that includes signature of entity responsible for preparing certification.
B. Required Informational Submittals:
1. Prior to start of work, furnish a plan that includes proposed method of removal and hauling, including the name and contact information for the disposal facility
2. Furnish copies of receipts from facility receiving the sludge. Receipts shall indicate dates and the number of gallons disposed at the facility.
PART 3 – TEMPORARY FACILITIES AND CONTROLS
3.1 USE OF UTILITIES
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service.
3.2 SANITARY FACILITIES
A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.
SEWAGE LAGOON SLUDGE REMOVAL 010150 – 5
3.3 STAGING AREAS
A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).
3.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.
3.5 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel and public of possible hazard.
C. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
PART 4 – EXECUTION REQUIREMENTS
4.1 EXAMINATION
A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
B. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
SEWAGE LAGOON SLUDGE REMOVAL 010150 – 6
4.2 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
4.3 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
C. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
ANALYTICAL SUMMARY REPORT
The analyses presented in this report were performed by Energy Laboratories, Inc., 1120 S 27th St., Billings, MT 59101, unless otherwise noted. Any exceptions or problems with the analyses are noted in the Laboratory Analytical Report, the QA/QC Summary Report, or the Case Narrative.
The results as reported relate only to the item(s) submitted for testing.
If you have any questions regarding these test results, please call.
Lab ID Client Sample ID Collect Date Receive Date Matrix Test
Report Approved By:
B16041060-001 AJC Lagoon 04/12/16 13:45 04/13/16 Solid Metals by ICP/ICPMS, Total or Soluble Bacteria, Fecal Coliform-sludge Mercury in Solid By CVAA Moisture, % Dry Basis Ammonia as N, KCL Extract Nitrate as N, KCL Extract Total Kjeldahl Nitrogen Percent Moisture Digestion, Total Metals Digestion, Mercury by CVAA Solids Content
Water and Environmental Technologies
Project Name: AJC MOI
Work Order: B16041060
480 E Park St Ste 200
Butte, MT 59701
April 22, 2016
Energy Laboratories Inc Billings MT received the following 1 sample for Water and Environmental Technologies on 4/13/2016 for analysis.
LABORATORY ANALYTICAL REPORT
Client: Water and Environmental Technologies
Project: AJC MOI
Lab ID: B16041060-001
Client Sample ID: AJC Lagoon
Collection Date: 04/12/16 13:45
Matrix: Solid
Report Date: 04/22/16
DateReceived: 04/13/16
Prepared by Billings, MT Branch
Analyses Result Units Analysis Date / ByRL Method
MCL/
QCLQualifiers
MICROBIOLOGICAL
04/13/16 09:55 / ldv1CFU/g46000Bacteria, Fecal Coliform, as Received A9222 Dmod
04/13/16 09:55 / ldv1CFU/g2700000Bacteria, Fecal Coliform, Dry Basis A9222 Dmod
PHYSICAL CHARACTERISTICS
04/14/16 18:13 / jh0.20wt%98.3Moisture A2540 G
04/14/16 18:13 / jh0.01wt%1.69Solids, Total A2540 G
CHEMICAL CHARACTERISTICS
04/22/16 11:27 / srm60mg/kg-dry4570Ammonia as N, KCL Extract ASA33-7
04/22/16 11:27 / srm60mg/kg-dry104Nitrate as N, KCL Extract ASA33-8
04/22/16 16:19 / srm600mg/kg-dry56400Total Kjeldahl Nitrogen ASA31-3
METALS, TOTAL - EPA SW846
04/19/16 18:36 / mas2mg/kg-dry10Arsenic SW6020
D 04/19/16 18:36 / mas2mg/kg-dry6Cadmium SW6020
04/19/16 03:34 / rlh3mg/kg-dry69Chromium SW6010B
04/19/16 03:34 / rlh6mg/kg-dry925Copper SW6010B
04/19/16 18:36 / mas0.4mg/kg-dry78.3Lead SW6020
04/14/16 15:01 / ser0.3mg/kg-dry2.6Mercury SW7471B
04/19/16 18:36 / mas1mg/kg-dry19Molybdenum SW6020
04/19/16 18:36 / mas8mg/kg-dry14Nickel SW6020
04/19/16 18:36 / mas2mg/kg-dry6Selenium SW6020
04/19/16 03:34 / rlh8mg/kg-dry1930Zinc SW6010B
Report Definitions:
RL - Analyte reporting limit. MCL - Maximum contaminant level.
QCL - Quality control limit. ND - Not detected at the reporting limit.
D - RL increased due to sample matrix.
Project: AJC MOI
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: SW6010B Analytical Run: ICP203-B_160418A
Lab ID: QCS 04/18/16 10:16Initial Calibration Verification Standard3
Chromium 99 90 1100.0500.796 mg/L
Copper 99 90 1100.0100.796 mg/L
Zinc 102 90 1100.0100.812 mg/L
Lab ID: ICSA 04/18/16 10:20Interference Check Sample A3
Chromium 0.050-0.000780 mg/L
Copper 0.010-0.00104 mg/L
Zinc 0.0100.00388 mg/L
Lab ID: ICSAB 04/18/16 10:24Interference Check Sample AB3
Chromium 90 80 1200.0500.452 mg/L
Copper 95 80 1200.0100.474 mg/L
Zinc 94 80 1200.0100.936 mg/L
Method: SW6010B Batch: 98439
Lab ID: MB-98439 04/19/16 02:34Method Blank Run: ICP203-B_160418A3
Chromium 0.07ND mg/kg
Copper 0.2ND mg/kg
Zinc 0.20.4 mg/kg
Lab ID: SRM2-98439 04/19/16 02:37Standard Reference Material Run: ICP203-B_160418A3
Chromium 99 70 1305.099.1 mg/kg
Copper 97 70 1305.096.9 mg/kg
Zinc 99 70 1305.099.3 mg/kg
Lab ID: SRM3-98439 04/19/16 02:48Standard Reference Material Run: ICP203-B_160418A3
Chromium 92 73 1205.0107 mg/kg
Copper 88 76 1205.0121 mg/kg
Zinc 107 65 1205.0247 mg/kg
Lab ID: B16041092-001ADIL 04/19/16 03:59Serial Dilution Run: ICP203-B_160418A3
Chromium 0 0 101.0 7.49.19 mg/kg
Copper 0 0 101.1 7.029.3 mg/kg
Zinc 0 0 101.4 7.559.4 mg/kg
Lab ID: B16041092-001APDS 04/19/16 04:03Post Digestion/Distillation Spike Run: ICP203-B_160418A3
Chromium 88 75 1251.070.9 mg/kg
Copper 88 75 1251.090.1 mg/kg
Zinc 91 75 1251.0120 mg/kg
Lab ID: B16041092-001AMS3 04/19/16 04:13Sample Matrix Spike Run: ICP203-B_160418A3
Chromium 101 75 1251.078.4 mg/kg
Copper 86 75 1251.087.1 mg/kg
Zinc 88 75 1251.0116 mg/kg
Lab ID: B16041092-001AMSD 04/19/16 04:17Sample Matrix Spike Duplicate Run: ICP203-B_160418A3
Chromium 99 75 125 201.0 1.277.4 mg/kg
Qualifiers:
RL - Analyte reporting limit. ND - Not detected at the reporting limit.
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: SW6010B Batch: 98439
Lab ID: B16041092-001AMSD 04/19/16 04:17Sample Matrix Spike Duplicate Run: ICP203-B_160418A3
Copper 87 75 125 201.0 0.887.8 mg/kg
Zinc 90 75 125 201.0 1.2118 mg/kg
Qualifiers:
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: SW6020 Analytical Run: ICPMS202-B_160419B
Lab ID: QCS 04/19/16 13:34Initial Calibration Verification Standard6
Arsenic 101 90 1100.00100.0506 mg/L
Cadmium 103 90 1100.00100.0256 mg/L
Lead 95 90 1100.00100.0473 mg/L
Molybdenum 95 90 1100.00100.0473 mg/L
Nickel 98 90 1100.00100.0490 mg/L
Selenium 100 90 1100.00100.0499 mg/L
Lab ID: ICSA 04/19/16 13:42Interference Check Sample A6
Arsenic 0.00100.000260 mg/L
Cadmium 0.00100.000290 mg/L
Lead 0.00100.000290 mg/L
Molybdenum 104 70 1300.00100.829 mg/L
Nickel 0.00100.00125 mg/L
Selenium 0.00100.000470 mg/L
Lab ID: ICSAB 04/19/16 13:45Interference Check Sample AB6
Arsenic 96 70 1300.00100.00957 mg/L
Cadmium 94 70 1300.00100.00937 mg/L
Lead 0 00.00100.000200 mg/L
Molybdenum 106 70 1300.00100.848 mg/L
Nickel 92 70 1300.00100.0184 mg/L
Selenium 97 70 1300.00100.00972 mg/L
Method: SW6020 Batch: 98439
Lab ID: MB-98439 04/19/16 18:25Method Blank Run: ICPMS202-B_160419B6
Arsenic 0.05ND mg/kg
Cadmium 0.0080.04 mg/kg
Lead 0.0070.03 mg/kg
Molybdenum 0.03ND mg/kg
Nickel 0.04ND mg/kg
Selenium 0.06ND mg/kg
Lab ID: B16041092-001ADIL 04/19/16 18:50Serial Dilution Run: ICPMS202-B_160419B6
Arsenic 0 0 101.04.37 mg/kg N
Cadmium 0 0 101.00.380 mg/kg N
Lead 0 0 101.0 5.08.60 mg/kg
Molybdenum 0 0 101.01.62 mg/kg N
Nickel 0 0 101.0 7.112.8 mg/kg
Selenium 0 0 101.0ND mg/kg
Lab ID: SRM2-98439 04/19/16 18:53Standard Reference Material Run: ICPMS202-B_160419B6
Arsenic 50 1301.0ND mg/kg
Cadmium 105 70 1301.0105 mg/kg
Lead 102 70 1301.0102 mg/kg
Molybdenum 104 70 1301.0104 mg/kg
Qualifiers:
RL - Analyte reporting limit. ND - Not detected at the reporting limit.
N - The analyte concentration was not sufficiently high to calculate a RPD for the serial dilution test.
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: SW6020 Batch: 98439
Lab ID: SRM2-98439 04/19/16 18:53Standard Reference Material Run: ICPMS202-B_160419B6
Nickel 110 70 1301.0110 mg/kg
Selenium 70 1301.0ND mg/kg
Lab ID: SRM3-98439 04/19/16 18:55Standard Reference Material Run: ICPMS202-B_160419B6
Arsenic 101 71 1201.0197 mg/kg
Cadmium 111 73.2 1201.0110 mg/kg
Lead 109 74 1201.0114 mg/kg
Molybdenum 105 66 1201.0133 mg/kg
Nickel 112 72 1201.096.9 mg/kg
Selenium 97 71 1201.0198 mg/kg
Lab ID: B16041092-001APDS1 04/19/16 18:58Post Digestion/Distillation Spike Run: ICPMS202-B_160419B6
Arsenic 103 75 1251.023.1 mg/kg
Cadmium 101 75 1251.018.4 mg/kg
Lead 102 75 1251.027.4 mg/kg
Molybdenum 105 75 1251.020.5 mg/kg
Nickel 111 75 1251.031.9 mg/kg
Selenium 104 75 1251.019.6 mg/kg
Lab ID: B16041092-001AMS3 04/19/16 19:00Sample Matrix Spike Run: ICPMS202-B_160419B6
Arsenic 107 75 1251.078.8 mg/kg
Cadmium 105 75 1251.036.6 mg/kg
Lead 113 75 1251.087.7 mg/kg
Molybdenum 105 75 1251.074.7 mg/kg
Nickel 118 75 1251.093.8 mg/kg
Selenium 104 75 1251.073.3 mg/kg
Lab ID: B16041092-001AMSD 04/19/16 19:11Sample Matrix Spike Duplicate Run: ICPMS202-B_160419B6
Arsenic 100 75 125 201.0 6.174.2 mg/kg
Cadmium 101 75 125 201.0 3.435.4 mg/kg
Lead 109 75 125 201.0 3.185.0 mg/kg
Molybdenum 101 75 125 201.0 4.171.7 mg/kg
Nickel 118 75 125 201.0 0.494.2 mg/kg
Selenium 97 75 125 201.0 6.868.5 mg/kg
Qualifiers:
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: SW7471B Analytical Run: HGCV202-B_160414A
Lab ID: ICV 04/14/16 14:20Initial Calibration Verification Standard
Mercury 104 90 1101.00.00208 mg/kg
Method: SW7471B Batch: 98410
Lab ID: MB-98410 04/14/16 14:25Method Blank Run: HGCV202-B_160414A
Mercury 0.00030.001 mg/kg
Lab ID: LCS3-98410 04/14/16 14:26Laboratory Control Sample Run: HGCV202-B_160414A
Mercury 106 80 1201.00.212 mg/kg
Lab ID: B16040414-001ADIL 04/14/16 14:33Serial Dilution Run: HGCV202-B_160414A
Mercury 0 0 101.0 1.13.31 mg/kg
Lab ID: B16041069-001AMS3 04/14/16 15:07Sample Matrix Spike Run: HGCV202-B_160414A
Mercury 89 80 1201.00.294 mg/kg
Lab ID: B16041069-001AMSD 04/14/16 15:08Sample Matrix Spike Duplicate Run: HGCV202-B_160414A
Mercury 86 80 120 201.00.289 mg/kg
Qualifiers:
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: ASA31-3 Batch: R259947
Lab ID: B16040954-001A DUP 04/22/16 16:19Sample Duplicate Run: MISC-SOIL_160422C
Total Kjeldahl Nitrogen 30320 0.075400 mg/kg-dry
Lab ID: LCS-1604221619 04/22/16 16:19Laboratory Control Sample Run: MISC-SOIL_160422C
Total Kjeldahl Nitrogen 85 50 15010560 mg/kg
Lab ID: B16040954-001A MS 04/22/16 16:19Sample Matrix Spike Run: MISC-SOIL_160422C
Total Kjeldahl Nitrogen 109 50 150320145000 mg/kg-dry
Qualifiers:
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: ASA33-7 Batch: OM_4-22-2016_11-15-29AM
Lab ID: LCS 04/22/16 11:16Laboratory Control Sample Run: FIA205-B_160422A
Ammonia as N, KCL Extract 127 70 1301.04.56 mg/kg
Lab ID: B16040954-001ADUP 04/22/16 11:21Sample Duplicate Run: FIA205-B_160422A
Ammonia as N, KCL Extract 303200 2.923300 mg/kg-dry
Lab ID: B16040954-001AMS 04/22/16 11:21Sample Matrix Spike Run: FIA205-B_160422A
Ammonia as N, KCL Extract 110 70 130340059600 mg/kg-dry
Qualifiers:
Work Order: B16041060
QA/QC Summary Report
04/22/16Report Date:
Analyte Result %REC RPDLow Limit High Limit RPDLimitRLUnits QualCount
Prepared by Billings, MT Branch
Method: ASA33-8 Batch: OM_4-22-2016_11-15-29AM
Lab ID: LCS 04/22/16 11:16Laboratory Control Sample Run: FIA205-B_160422A
Nitrate as N, KCL Extract 95 70 1301.07.05 mg/kg
Lab ID: B16041187-002ADUP 04/22/16 11:39Sample Duplicate Run: FIA205-B_160422A
Nitrate as N, KCL Extract 301.0 1.323.2 mg/kg
Lab ID: B16041187-002AMS 04/22/16 11:40Sample Matrix Spike Run: FIA205-B_160422A
Nitrate as N, KCL Extract 91 70 1301.028.2 mg/kg
Qualifiers:
Shipping container/cooler in good condition?
Custody seals intact on all shipping container(s)/cooler(s)?
Custody seals intact on all sample bottles?
Chain of custody present?
Chain of custody signed when relinquished and received?
Chain of custody agrees with sample labels?
Samples in proper container/bottle?
Sample containers intact?
Sufficient sample volume for indicated test?
All samples received within holding time?
(Exclude analyses that are considered field parameters such as pH, DO, Res Cl, Sulfite, Ferrous Iron, etc.)
Container/Temp Blank temperature:
Water - VOA vials have zero headspace?
Water - pH acceptable upon receipt?
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
No
No
No
No
No
No
No
R £
R
R
R
R
R
R
R
R
Not Present
Not Present
Not Present
R
Not Applicable
Not Applicable R
R
3.7°C On Ice
4/13/2016Gina McCartney
UPS
jrz
Date Received:
Received by:
Login completed by:
Carrier name:
BL2000\tedwards
4/15/2016
Reviewed by:
Reviewed Date:
Contact and Corrective Action Comments:
None
Temp Blank received in all shipping container(s)/cooler(s)? Yes NoR £ Not Applicable £
Lab measurement of analytes considered field parameters that require analysis within 15 minutes of sampling such as pH, Dissolved Oxygen and Residual Chlorine, are qualified as being analyzed outside of recommended holding time.
Solid/soil samples are reported on a wet weight basis (as received) unless specifically indicated. If moisture corrected, data units are typically noted as –dry. For agricultural and mining soil parameters/characteristics, all samples are dried and ground prior to sample analysis.
Standard Reporting Procedures:
Work Order Receipt Checklist Water and Environmental Technologies B16041060
General Decision Number: MT180076 03/16/2018 MT76
Superseded General Decision Number: MT20170076
State: Montana
Construction Type: Heavy
Counties: Beaverhead, Broadwater, Deer Lodge, Gallatin, Granite, Jefferson, Lewis And Clark, Madison, Meagher, Powell, Silver Bow and Yellowstone National Park Counties in Montana.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 03/16/2018
BRMT0001-004 06/01/2017
BEAVERHEAD, DEER LODGE, GRANITE, JEFFERON, MADISON, POWELL, AND
SILVER BOW COUNTIES
Rates Fringes
BRICKLAYER.......................$ 29.79 17.73
BRMT0005-002 06/01/2017
GALLATIN COUNTY
Rates Fringes
BRICKLAYER.......................$ 29.79 17.73
BRMT0006-005 06/01/2017
BROADWATER, LEWIS AND CLARK, MEAGHER, AND YELLOWSTONE NATIONAL
5/25/2018https://www.wdol.gov/wdol/scafiles/davisbacon/MT76.dvb?v=1
PARK COUNTIES
Rates Fringes
BRICKLAYER.......................$ 29.79 17.73
ELEC0044-003 06/01/2017
Rates Fringes
LINE CONSTRUCTION
(1) Lineman.................$ 44.41 12.96+5.75%
* ELEC0233-018 01/01/2018
BEAVERHEAD, DEER LODGE, GRANITE, JEFFERSON, MADISON, POWELL,
AND SILVER BOW COUNTIES
Rates Fringes
ELECTRICIAN......................$ 29.59 14.36
* ELEC0233-020 01/01/2018
BROADWATER, LEWIS AND CLARK, AND MEAGHER COUNTIES
Rates Fringes
ELECTRICIAN......................$ 31.05 12.846
ELEC0322-003 06/01/2017
YELLOWSTONE NATIONAL PARK
Rates Fringes
ELECTRICIAN......................$ 29.59 14.13
ENGI0400-009 05/01/2013
Rates Fringes
POWER EQUIPMENT OPERATOR:
(Zone 1)
(1) A-frame truck Crane, oiler (except crane).......$ 23.47 10.40
(2) Crane Oiler,Bulldozer, Roller (Dirt and Grade Compaction).................$ 23.94 10.40
(3) Mechanic, Scraper.......$ 24.34 10.40
(4) Cranes, 25 tons - 44 tons........................$ 27.00 11.40
(5) Cranes, 45 tons to and incl. 74 tons...............$ 28.00 11.40
(6) Cranes, 75 tons to and incl. 149 tons; Cranes, Whirley (All)...............$ 29.00 11.40
(7) Cranes, 150 tons to including 250 tons (add $1.00 for every 100 tons over 250 tons); Crane, Stiff- Leg or
Derrick; Helicopter Hoist; Crane, Tower (all)...$ 30.00 11.40
ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS:
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the nearest County Court House of the following listed towns to the center of the job:
BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL,
MISSOULA
Zone 1: 0 to 30 miles - Base Pay Zone 2: 30 to 60 miles - Base Pay + $3.50 Zone 3: Over 60 miles - Base Pay + $5.50
* IRON0732-018 06/01/2017
Rates Fringes
IRONWORKER: Reinforcing and Structural.......................$ 27.25 21.72
LABO1686-011 05/01/2012
Rates Fringes
LABORER
(2) Mason Tender............$ 20.10 9.05
(3) Pipelayer...............$ 20.24 9.05
ZONE DEFINITIONS FOR LABORERS
The zone hourly rates applicable to each project shall be determined by measuring the road miles over the shortest practical maintained route from the County Courthouse of the following listed town to the center of the job:
Billings, Bozeman, Butte, Helena, Great Falls, Missoula, Kalispell
TRAVEL ZONES:
ZONE 1: 0 to 30 miles, Base Pay ZONE 2: 30-60, add $3.05 to Base Pay ZONE 3: Over 60 miles, add $4.85 to Base Pay
SUMT2011-051 02/08/2011
Rates Fringes
CARPENTER (Form Work Only).......$ 24.30 7.80
CARPENTER, Excludes Form Work....$ 21.13 7.00
LABORER: Common or General......$ 18.11 5.90
LABORER: Landscape and Irrigation.......................$ 15.14 1.30
OPERATOR: Backhoe...............$ 24.16 8.05
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 21.99 8.55
OPERATOR: Excavator.............$ 23.12 7.81
OPERATOR: Grader/Blade..........$ 24.69 8.40
OPERATOR: Loader (Front End)....$ 24.20 7.84
TRUCK DRIVER: Dump Truck........$ 18.84 5.92
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
| Schedule - Seed Project 2 |
| SOW_AnacondaSludge - corrected 5.21.2018 |
| SOW_AnacondaSludge |
| 1. |
| 1.1 Description |
| A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows: |
| 1. Removal and disposal of 90,500 gallons of sludge from the sewer lagoon. Sludge shall be disposed of in an approved municipal sewer treatment facility. |
| 2. The lagoon is 154 feet long, 89 feet wide, 7.6 feet deep with 2:1 side slope. Measured average thickness of sludge is 18.6 inches. |
| 3. Potential sites for disposal of the sludge are Anaconda Public Sewer Lagoon and Butte City Sewer. |
| 4. Past Work Experience: Contractor must have completed at least 3 similar projects in the last 10 years. |
| 5. All work to meet Federal Environmental Protection Agency (EPA) standards and Montana Department of Environmental Quality (DEQ) standards. |
| 1.2 location |
| A. This project is located at the Anaconda Job Corps Civilian Conservation Center approximately eight miles west of Anaconda Montana on State Highway 1. The address is 1407 Foster Creek Road, Anaconda, MT, 59711. Driving directions can be obtained b... |
| 1.3 project scheduling |
| A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday. |
| 1.4 point of contact |
| Center Point of Contact: Brett Hackman, 406-563-8736, bhackman@fs.fed.us |
| 1.5 USE OF PREMISES |
| A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated. |
| B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's... |
| C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or obs... |
| 1.6 WORK RESTRICTIONS |
| A. Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes. |
| 1.7 permits |
| A. State Electrical Inspection is required for this project. Obtain permits for electrical work if the State Electrical Inspector requires a permit to do the inspection. |
| 1.8 schedule of items |
| A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items and Optional Items. |
| 1. Provide pricing for all items listed in the Schedule of Items. |
| 2. Contract award will be made for all Base Items. |
| B. Base Items (BI): |
| 1. Base Item No. 1- Sludge Removal and Disposal |
| a. Measurement: This item is measured as a Lump Sum quantity. |
| b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to remove and dispose of 90,500 gallons of sludge from the sewage lagoon. |
| 2. |
| 2.1 DEFINITIONS |
| A. Action Submittals: Written and graphic information that requires Government approval. |
| B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements. |
| 2.2 PROCEDURES |
| A. Contractor Responsibilities |
| 1. Review each submittal and check for compliance with the Contract Documents. |
| 2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals. |
| 3. Include the following information on label or cover sheet for processing and recording action taken: |
| a. Project name. |
| b. Date. |
| c. Name and address of Contractor. |
| d. Name of manufacturer. |
| e. Unique identifier, including revision number. |
| f. Number and title of appropriate Specification Section. |
| g. Drawing number and detail references, as appropriate. |
| h. Date of Contractor’s approval. |
| i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents. |
| 4. The Government will not review submittals that do not bear Contractor's approval and will return them without action. |
| 5. Unless additional copies are required for final submittal, and unless the Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal. |
| 6. Only final submittals with mark indicating action taken by Government are to be used for construction. |
| 7. Submittals not required by the Contract Documents will not be reviewed and may be discarded. |
| B. Processing Time: Time for review shall commence on CO's receipt of submittal. |
| 1. Initial Review: Government will review initial submittal within 10 working days. Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being proc... |
| 2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal. |
| 2.3 ACTION SUBMITTALS |
| A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection. |
| 1. Submit two copies of each submittal, unless otherwise indicated. CO will return one copy. Mark up and retain one returned copy as a Project Record Document. Electronic submission of PDFs is an acceptable alternative to paper submission. |
| B. Collect information into a single submittal for each element of construction and type of product or equipment. |
| 1. Mark each copy of each submittal to show which products and options are applicable. |
| 2. Include the following information, as applicable: |
| a. Manufacturer's written recommendations. |
| b. Manufacturer's product specifications. |
| c. Manufacturer's installation instructions. |
| d. Manufacturer's catalog cuts. |
| e. Wiring diagrams showing factory-installed wiring. |
| f. Compliance with recognized trade association standards. |
| g. Compliance with recognized testing agency standards. |
| C. Required Action Submittals |
| 1. None |
| 2.4 INFORMATIONAL SUBMITTALS |
| A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection. |
| 1. Submit one copy of each submittal, unless otherwise indicated. CO will not return copy. Electronic submission of PDFs is an acceptable alternative to paper submission. |
| 2. Provide a statement that includes signature of entity responsible for preparing certification. |
| B. Required Informational Submittals: |
| 1. Prior to start of work, furnish a plan that includes proposed method of removal and hauling, including the name and contact information for the disposal facility |
| 2. Furnish copies of receipts from facility receiving the sludge. Receipts shall indicate dates and the number of gallons disposed at the facility. |
| 3. |
| 3.1 use of UTILITies |
| A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilitie... |
| 3.2 sanitary facilities |
| A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily. |
| 3.3 Staging areas |
| A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR). |
| 3.4 construction WASTE DISPOSAL faciLITIES |
| A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. |
| 3.5 safety and environmental PROTECTION |
| A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamina... |
| B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform p... |
| C. Fire Protection. |
| 1. Store combustible materials in containers in fire-safe locations. |
| 2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas. |
| 3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition. |
| 4. |
| 4.1 EXAMINATION |
| A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. |
| B. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. |
| 4.2 PROGRESS CLEANING |
| A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully. |
| 1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris. |
| 2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C). |
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
| 4.3 fiNAL CLEANING |
| A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. |
| B. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project: |
| 1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances. |
| 2. Remove tools, construction equipment, machinery, and surplus material from Project site. |
| 3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. |
C. Remove waste materials from Project site and dispose of lawfully.
Sludge-test-results
DB Wage Determinations