1282A718R0006
RFP
Montana and Idaho – Construction and Facility Maintenance and Repair Services ID/IQ
QUESTIONS & ANSWERS REGARDING:
SOLICITATION/REQUEST FOR PROPOSALS NO. 1282A718R0006
Amendment 0002
Montana and Idaho – Construction and Facility Maintenance and Repair Services ID/IQ
(AMENDMENT 0001) – Addressed with Amendment 0001
QUESTIONS RECEIVED AS OF 6/19/2018:
1. We have several questions regarding your Section B Price Schedule. We are calculating different quantities and Units of Measure than as presented on the form. For Example:
• CLIN 002 shows 317 SF and we find 217 SF.
• CLIN 003 shows 38 LF and we calculate 46 LF.
• CLINs 004 and 011 are stated as 104 LF and 100 LF and we find 176 SF and 217 SF respectively.
• This one is important as 175’ x 8’ tall walls equals 1400 SF of drywall and we find only 176
SF (22’ x 8’).
• CLIN 007 shows a quantity of 200 and we find 205.
• CLIN 008 shows a quantity of 100 and we find 97.
• CLIN 009 shows a quantity of 100 and we find 108.
ANSWER: The attached Schedule – Seed Project 1 – Corrected, corrects CLIN 002, 004 and 005 (not 011 as stated above) to the correct quantities and/or units. Please use this schedule, instead of the one attached with Attachment 1. Additionally Page 5 of Section 010150 – General Requirements has been corrected, and is attached below. In regards to the additional items shown above with errors, there is not enough of a difference, and the Government requires contractors to price as stated in the quantities included in schedule.
(AMENDMENT 0002)
QUESTIONS RECEIVED AS OF 6/25/2018:
2. In the Statement of Work/ 1.1, A2; it states that the sludge in the lagoon measured at 18.6 inches.
Can we receive the date that measurement was taken?
ANSWER: The date the lagoon was measured at 18.6 inches was 5/10/2016.
3. In the Statement of Work/ 1.1, A2; it states that the lagoon is 7.6 feet deep. How full will the pond be at the time that work will be completed?
ANSWER: The pond will be approximately the same depth of 7.6 feet deep.
1282A718R0006
RFP
Montana and Idaho – Construction and Facility Maintenance and Repair Services ID/IQ
4. Normal sludge remove projects that we have done in the past allowed for the transfer of overburden water to other lagoons to minimize the sludge/water separation. Does this facility have any adjacent lagoons with capacity to receive overburden water?
ANSWER: The facility does not have any adjacent lagoons.
5. I understand a bid guarantee is required but there is no amount or rate/percentage that is specified. Could you tell me what the amount and/or rate should be so I can obtain a bid bond?
ANSWER: This was an oversite in FAR 52.228-1 – Bid Guarantee – It should read “The amount of the bid guarantee shall be 100% of the bid price or 20%, whichever is less.” The Bid Guarantee is 20% of the total amount of the proposal.