Mount ST. Helens spirit lake tunnel intake

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9127N-22-R-0020
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Cougar, Washington 98616, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks a contractor to replace the intake gate at Mount St. Helens Spirit Lake Tunnel and conduct related infrastructure work. The Department of the Army Corps of Engineers Engineering District Portland is procuring construction services including a temporary access road, barge loading facility, mechanical dredging, cofferdam installation, replacement of the inlet gate and slide gate with hydraulic steel structures, and concrete repairs. Proposals will be evaluated based on experience, past performance, and technical approach. The closing date for proposals is January 9, 2023.

The opportunity is set aside for total small business and falls under NAICS codes 237990 and 237310. Potential incumbents include those currently working on drainage projects at Spirit Lake. The place of performance is Cougar, Washington and the period of performance is expected to conclude by October 1, 2026 based on a projected notice to proceed of March 3, 2023.

Notice text

Project Scope: The multifaceted project focuses primarily on Spirit Lake’s drainage issues.   Re-establishing the road from Windy Ridge to the south shore of the lake would allow access the area to make it easier to replace the aging intake gate.  The proposed access road would be built along an old road used by the U.S. Army Corps of Engineers in the early 1980s that generally tracks along the Truman Trail

Spirit Lake Gate Replacement will include to the following items:

• A temporary access road.

• A lake-side barge loading facility consisting of an earthen ramp, and a staging area

• Mechanical Dredging from barges or floating work platforms

• Construction of and working behind a cofferdam

• Replacement of inlet gate, design of slide gate, hydraulic steel structures

• Concrete repair to Headwall

Files

Show all 20

Notice history

Notice Type Posted
Mount ST. Helens spirit lake tunnel intake Award Award Notice
This notice Latest solicitation Solicitation
Mount ST. Helens spirit lake tunnel intake Pre-Solicitation
Mount ST. Helens spirit lake intake headwall Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning Foster Dam, Linn County, Oregon 93745 · NAICS 237990 ENDIST Portland Total Small Business
LLA Navigation Lock Switchgear Pomeroy, Washington 99347, United States · NAICS 238210 ENDIST Walla Walla Total Small Business
CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep Chief Joseph Dam, Bridgeport, WA 98813 · NAICS 237990 ENDIST Seattle Total Small Business
FY26 Willapa Harbor Maintenance Dredging Washington, United States · NAICS 237990 ENDIST Seattle No set-aside
Navigation lock tainter valve (TV) repair, TV1 The Dalles Dam (Washington side), Lyle, WA 98635. 98635 · NAICS 237990 ENDIST Portland No set-aside