This amendment modifies solicitation number W9127N-22-R-0020 for the Mount St. Helens Spirit Lake Tunnel Intake project issued by the Department of the Army Corps of Engineers Engineering District Portland. The amendment updates specification section 01 10 10.00 25 3.4(a) regarding allowable lake stage levels during construction activities. It also replaces drawing S-701 with the attached revised drawing. The multiphase project focuses on addressing Spirit Lake's drainage issues and includes replacing the aging intake gate. Specific work includes constructing a temporary access road, a lake-side barge loading facility, mechanical dredging from barges or floating platforms, building and working behind a cofferdam, and replacing the inlet gate and slide gate with hydraulic steel structures and concrete repairs to the headwall.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment serves to update specifications and draw ings
1. Section 01 10 10.00 25 3.4(a) has been updated. See Continuation pages.
2. Draw ing S-701 has been updated. See attched draw ing
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Dec-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9127N22R0020
X 9B. DATED (SEE ITEM 11)
08-Nov-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Dec-2022
CODE
USACE, PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N22R0020
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
CHANGES TO SPECIFICATIONS
Specification Section 01 10 10.00 25 3.4(a)
Which previously read;
a. Inflow may be stored above the target operating lake stage of 3,440 ft (NGDVD29) during active construction and drafted back down by the end of the construction season, or the lake may be drawn down below the target operating lake stage and inflow may be stored as it fills up the lake. Under either scenario, the lake stage must not be allowed to exceed 3445 ft (NVGD 29) during active construction or a period when the intake gate is closed or otherwise unavailable.
Shall now read;
a. Inflow may be stored above the target operating lake stage of 3,440 ft (NGDVD29) during active construction and drafted back down by the end of the construction season, or the lake may be drawn down below the target operating lake stage and inflow may be stored as it fills up the lake. Under either scenario, the lake stage must not be allowed to exceed 3445 ft (NVGD 29) during active construction or a period when the intake gate is closed or otherwise unavailable.
Lake stage must not exceed an elevation of 3,441 ft at the end of the IWW season, and gates placed into winter operation mode on or before this date.