Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Open Solicitation Posted
- Solicitation number
- W9128F27RA063
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Approximately one (1) mile north of the town of Creede in Mineral County, Colorado 81130
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District Omaha, seeks construction of an interim remedial action at the Nelson Tunnel Superfund Site, with proposals due January 6, 2027. The Set Aside line reads "No Set-Aside Used," and the solicitation is unrestricted and open to both large and small businesses.
The work is in the San Juan Mountains near Creede, CO 81130, and the remedy is Alternative 4 from the Nelson Tunnel Interim Record of Decision. Scope includes a new bypass adit south of Nelson Tunnel to avoid the Nelson Tunnel Portal Pool, rehabilitation of Nelson Tunnel from the bypass connection to the planned bulkhead location, a flow control bulkhead in Nelson Tunnel, and an accessible bulkhead flow control structure on the Commodore 5 level. The remedial action objective is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the tunnel. The NAICS code is 237990, Other Heavy and Civil Engineering Construction, and the PSC is Y1LC, Construction of Tunnels and Subsurface Structures. The solicitation is W9128F27RA063 and is associated with Pre-Solicitation Notice W9128F27RA056. The acquisition approach is best value. The source does not state a contract value or evaluation weighting.
Notice text
NOTE: SOLICITATION W9128F27RA063 is associated with Pre-Solicitation Notice W9128F27RA056.The project is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead at the Nelson Tunnel superfund site in the San Juan Mountains near Creede, CO. PROJECT DESCRIPTION: Construction Services for the Nelson Tunnel/Commodore Waste Rock Site (Nelson Tunnel Site or Site), the focus of the interim remedial action (IRA), consists of an abandoned underground hard rock mine and drainage tunnel with several shafts, crosscuts and drafts branching off the main tunnel. The remedial action objective of the RA is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the Nelson Tunnel. The selected alternative for the Nelson Tunnel Interim Record of Decision (IROD) is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead within Nelson Tunnel.The IROD selected remedy is Alternative 4, Drive New Adit to Intersect Nelson Tunnel, Tunnel Rehabilitation, Install Bulkhead in Nelson Tunnel and Flow Control Structure in Commodore 5 level and include the following remedial components. Installation of a new adit south of Nelson Tunnel, to bypass the Nelson Tunnel Portal Pool. Rehabilitation of Nelson Tunnel from the bypass adit connection to the location where bulkhead construction is planned. Installation of a flow control bulkhead in Nelson Tunnel to protect against a sudden uncontrolled release through Nelson Tunnel. Installation of an accessible bulkhead flow control structure in the Commodore 5 level to protect against a sudden uncontrolled release through this level. The solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The acquisition approach for this project will be Best Value Tradeoff following the Federal Acquisition Regulation (FAR) Part 15 procedures. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237990 is included in their profile prior to submission of offers.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site | ENDIST Omaha | No set-aside | |
| East Bear Creek Pumping Plant and Pipeline Moderni | — | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity