MOTCO Barge Pier/Berthing Facility

Closed Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .

Solicitation number
W9123820R0057
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Ca Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks offers to repair the barge pier and potentially the small craft berthing facility at the MOTCO Marina for the Department of the Army Corps of Engineers Engineering District Sacramento. The scope of work for the barge pier includes replacing damaged piles, installing structural jackets and pile wraps, repairing timber curbs and cross bracings, and repairing utilities. For the small craft berthing facility, the work involves removing an existing timber fender, installing offshore piles and a wave attenuator, constructing a gangway platform and gangway, and installing utility systems. Evaluation will be based on past performance, experience, and price. Proposals were due by July 31, 2020.

The opportunity is set aside for total small business and covers NAICS codes 237990 and 238910. No incumbent or current contractor is named. The work must be completed within 450 days of award at the MOTCO installation in Concord, California, and involves repairing the existing barge pier and constructing a new small craft berthing facility estimated to cost over $2 million total.

Notice text

4 versions

Update #4 · Latest ·

****Amendment 3 posts the UXO WD, edits section 00 22 00 and adds section 00 73 00*****

****Amendment 2 lists electronic proposal submission instructions, proposal due date extension, revised pricing schedule and revised spec sections*****

***Amendment 1 lists the Site Visit date and time, and posts a revised Specification Section 01 14 00***

This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility.  The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles.  The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles.  Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier. 

The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats.  Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.

Update #3 ·

****Amendment 2 lists electronic proposal submission instructions, proposal due date extension, revised pricing schedule and revised spec sections*****

***Amendment 1 lists the Site Visit date and time, and posts a revised Specification Section 01 14 00***

This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility.  The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles.  The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles.  Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier. 

The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats.  Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.

Update #2 ·

***Amendment 1 lists the Site Visit date and time, and posts a revised Specification Section 01 14 00***

This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility.  The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles.  The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles.  Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier. 

The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats.  Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.

Update #1 ·

This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility.  The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles.  The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles.  Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier. 

The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats.  Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.

Files

Show all 19

Notice history

Notice Type Posted
YOLO Bypass Latest pre-solicitation Pre-Solicitation
MOTCO Barge Pier/Berthing Facility Award Award Notice
This notice Solicitation
MOTCO Barge Pier/Berthing Facility Pre-Solicitation
MOTCO Barge Pier/Berthing Facility Original Special Notice

Similar open opportunities

Opportunity Agency Set-aside Responses due
CA-humboldt BAY NWR-tide gate repair NAICS 236220 — Total Small Business
Misty Barge Dry Dock Services Wrangell, Alaska 99929, United States · NAICS 336611 Forest Service Total Small Business
JP Murtha Float Mooring Bitts Retrofit JP Murtha Locks and DamMonongahela River BasinGibsonton Road, Monessen, PA 15062 15062 · NAICS 237990 ENDIST Pittsburgh No set-aside
Coos Bay Pier Utilities Coos Bay Pier, 1460 N Bayshore Drive Coos Bay, OR 97420 97420 · NAICS 237990 ENDIST Portland Total Small Business
$465M SPK small business MATOC for DBB/DB construction Usace Sacramento District 1325 J Street Sacramento, CA 95814 95814 · NAICS 236220 ENDIST Sacramento Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors