MOTCO Barge Pier/Berthing Facility
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest pre-solicitation from .
- Solicitation number
- W9123820R0057
- Agency
- ENDIST Sacramento US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Ca Usa
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks offers to repair the barge pier and potentially the small craft berthing facility at the MOTCO Marina for the Department of the Army Corps of Engineers Engineering District Sacramento. The scope of work for the barge pier includes replacing damaged piles, installing structural jackets and pile wraps, repairing timber curbs and cross bracings, and repairing utilities. For the small craft berthing facility, the work involves removing an existing timber fender, installing offshore piles and a wave attenuator, constructing a gangway platform and gangway, and installing utility systems. Evaluation will be based on past performance, experience, and price. Proposals were due by July 31, 2020.
The opportunity is set aside for total small business and covers NAICS codes 237990 and 238910. No incumbent or current contractor is named. The work must be completed within 450 days of award at the MOTCO installation in Concord, California, and involves repairing the existing barge pier and constructing a new small craft berthing facility estimated to cost over $2 million total.
Notice text
4 versions
Update #4 · Latest ·
****Amendment 3 posts the UXO WD, edits section 00 22 00 and adds section 00 73 00*****
****Amendment 2 lists electronic proposal submission instructions, proposal due date extension, revised pricing schedule and revised spec sections*****
***Amendment 1 lists the Site Visit date and time, and posts a revised Specification Section 01 14 00***
This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility. The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles. The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles. Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier.
The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats. Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.
Update #3 ·
****Amendment 2 lists electronic proposal submission instructions, proposal due date extension, revised pricing schedule and revised spec sections*****
***Amendment 1 lists the Site Visit date and time, and posts a revised Specification Section 01 14 00***
This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility. The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles. The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles. Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier.
The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats. Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.
Update #2 ·
***Amendment 1 lists the Site Visit date and time, and posts a revised Specification Section 01 14 00***
This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility. The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles. The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles. Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier.
The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats. Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.
Update #1 ·
This MOTCO Marina Project involves repairing the Barge Pier and possibly the Small Craft Berthing Facility. The Barge Pier work involves replacing broken, damaged, missing, and loose piles, as well as repairing splits in select piles. The contractor will also need to replace timber curbs and select cross bracings, install structural jackets on selected piles and install pile wraps on all bearing piles. Lastly for the Barge Pier, the contractor will need to remove and replace failing firewall boards and repair select utilities integral to the pier.
The Small Craft Berthing Facility work will include the removal of the timber fender (at the gangway platform), construction support for munitions and explosives of concern (MEC), fabrication and installation of offshore piles, wave attenuator and finger dock floats. Additionally, the construction of cast-in-place concrete gangway platform on piles, fabrication and installation of an aluminum gangway between the platform and the floating dock, installation of utility pedestals, and installation of power, communications, water and sewer lines.
Attachments
Show all 19
Notice history
| Notice | Type | Posted |
|---|---|---|
| YOLO Bypass | Pre-Solicitation | |
| MOTCO Barge Pier/Berthing Facility | Award Notice | |
| MOTCO Barge Pier/Berthing Facility | Solicitation | |
| MOTCO Barge Pier/Berthing Facility | Pre-Solicitation | |
| MOTCO Barge Pier/Berthing Facility | Special Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity