Attachment 3 - Drawings_Small Craft Berthing.11.29.2019.pdf
PDF 4 MB Posted
- Attached to
- MOTCO Barge Pier/Berthing Facility Federal contract opportunity
- Solicitation number
- W9123820R0057
About this file
This document outlines a federal contract solicitation for repair and construction work on a MOTCO Marina Project. The solicitation involves repairing an existing Barge Pier through replacing damaged pilings, installing structural jackets and pile wraps, and repairing utilities. It also includes construction of a new Small Craft Berthing Facility such as removing an existing timber fender, installing offshore pilings and a wave attenuator, constructing a cast-in-place concrete gangway platform and aluminum gangway, as well as installing utility pedestals and connecting power, communications, water and sewer lines. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Sacramento and involves munitions and explosives of concern mitigation work for the new berthing facility construction.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination for UXO.pdf | ||
| Amendment 3.pdf | ||
| Pricing Schedule.revised.pdf | ||
| Revised Spec Sections.pdf | ||
| Amendment 2.pdf | ||
| Site Visit Pictures_Part1.pdf | ||
| Site Visit Pictures_Part2.pdf | ||
| Site Visit Pictures_Part3.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| Amendment 1 - Revised Spec Section 01 14 00.pdf | ||
| Amendment 1 - W9123820R0057.pdf | ||
| Attachment 4 - Pricing Schedule.pdf | ||
| Solicitation W9123820R0057.pdf | ||
| Attachment 2 - Drawings_Repair Barge Pier.11.29.2019.pdf | ||
| Attachment 5 - Wage Determination CA20200018.June.5.2020.pdf | ||
| Attachment 1 - Specifications.6.8.2020.pdf | ||
| Attachment 7 - Past Performance Questionnaire.pdf | ||
| Attachment 6 - Pre-Award Survey.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPTION NOTES
OPTION 3 ALL CONSTRUCTION OF THE SMALL CRAFT BERTHING FACILITY IS OPTION 3 PER PRICING SCHEDULE WITH THE EXCEPTION OF
OPTION 4 NOTED BELOW.
OPTION 4 INSTALL 4 PATROL BOAT POWER/COMMUNICATION PEDESTALS PER PRICING SCHEDULE AND AS INDICATED ON E-001 AND E-101
File details come from the government source that posted it. Updated .