This pricing schedule outlines costs for repair and construction work on a barge pier and small craft berthing facility. The barge pier repair work includes eight contract line items for activities such as mobilization, underwater repairs, replacing damaged piles, installing pile protection wraps and jackets. Pile wrapping is further broken out into two line items for different sections of the pier. The small craft berthing facility work encompasses thirteen line items including munitions support, demolishing existing structures, constructing landside and waterside infrastructure, installing utilities and transferring power equipment. Bid totals are listed for each facility as well as an overall grand total. The solicitation details repairing structural and safety issues on the existing barge pier, and constructing a new small craft berthing area with gangways, docks and utility connections.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MOTCO Barge Pier Repair and Small Craft Berthing Facility
Contract Line Item No.
Item Description Total Price
0001 Barge Pier Repair
0001.1 Mobilization and Demobilization $
0001.2 MEC Support $
0001.3 Underdeck Repairs $
0001.4 Above Deck Repairs $
0001.5 Repair Wingwall Abutment $
0001.6 Electrical $
0001.7 Furnish and Install Pile
Protection Wrap System
0001.8 Furnish and Install Structural Pile
Jacket
0001.9 Furnish and Install Fender Piles $
CLIN 0001 Total $
1001 Pile Wrapping Bents 1-17 $
1002 Pile Wrapping Bents 18-32 $
2001 Small Craft Berthing Facility
2001.1 MEC/UXO Standby $
2001.2 Demo and Prep Area for Platform $
2001.3 Land Side Structures for
Gangway Platforms
2001.4 Water Site Guide Piles $
2001.5 Water Side Guide Pile Collars $
2001.6 Furnish and Install Wave
Attenuators
2001.7 Furnish and Install Wave Docks $
2001.8 Water Pipe $
2001.9 Sewer Line $
2001.10 Furnish and Install PVC Conduit
for Wiring
2001.11 Furnish and Install Copper
Conductor
2001.12 Furnish and Install fiber Optic
Cable
2001.13 Relocate 1FB shore Power
Pedestal
CLIN 1003 Total $
2002 Small Craft Power/Comms
Pedestal
GRAND TOTAL $