Revised Spec Sections.pdf
PDF 2 MB Posted
- Attached to
- MOTCO Barge Pier/Berthing Facility Federal contract opportunity
- Solicitation number
- W9123820R0057
About this file
This solicitation is for a project involving repair and construction work at the Military Ocean Terminal Concord (MOTCO) Marina. Work includes replacing damaged piles, repairing splits in select piles, replacing timber curbs and bracings, installing structural jackets and pile wraps on bearing piles, and repairing utilities for the Barge Pier. For the Small Craft Berthing Facility, the work consists of removing an existing timber fender, conducting munitions and explosives construction support, installing offshore and wave attenuator floats, constructing an aluminum gangway and cast-in-place concrete platform, and installing utility pedestals and utility lines for power, communications, water and sewer. The solicitation provides relevant details on the scope of work required to complete these repairs and new construction elements at the MOTCO Marina facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination for UXO.pdf | ||
| Amendment 3.pdf | ||
| Pricing Schedule.revised.pdf | ||
| Amendment 2.pdf | ||
| Site Visit Pictures_Part3.pdf | ||
| Site Visit Pictures_Part1.pdf | ||
| Site Visit Pictures_Part2.pdf | ||
| Site Visit Sign-In Sheet.pdf | ||
| Amendment 1 - W9123820R0057.pdf | ||
| Amendment 1 - Revised Spec Section 01 14 00.pdf | ||
| Attachment 7 - Past Performance Questionnaire.pdf | ||
| Attachment 6 - Pre-Award Survey.pdf | ||
| Attachment 4 - Pricing Schedule.pdf | ||
| Attachment 3 - Drawings_Small Craft Berthing.11.29.2019.pdf | ||
| Solicitation W9123820R0057.pdf | ||
| Attachment 2 - Drawings_Repair Barge Pier.11.29.2019.pdf | ||
| Attachment 5 - Wage Determination CA20200018.June.5.2020.pdf | ||
| Attachment 1 - Specifications.6.8.2020.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR BARGE PIER AND CONSTRUCT SMALL CRAFT BERTHING FACILITY,
MOTCO, CONCORD, CA
AMENDMENT 0002
Summary of Changes:
A) SPECIFICATIONS REVISED
1. TABLE OF CONTENTS
2. 01 35 10.00 28 – DIVING‐ replaced entire section
3. 01 35 20 ‐ MEC CLEARANCE OPERATIONS‐ replaced entire section
4. 06 13 33 ‐ PIER TIMBERWORK‐ replaced entire section
5. 31 62 19.13 ‐ TIMBER MARINE PILES‐ replaced entire section
6. 35 51 13.00 20 ‐ CONCRETE FLOATING DOCKS AND ATTENUATOR‐ replaced entire section
B) ATTACHMENT
1. BORING LOGS‐ New
REPAIR BARGE PIER AND CONSTRUCT SMALL CRAFT BERTHING FACILITY 2187
MOTCO CONCORD, CALIFORNIA
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 10.00 28 DIVING
01 35 20 MEC CLEARANCE OPERATIONS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 41 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20.00 10 ENVIRONMENTAL PROTECTION
01 57 25 TURBIDITY MONITORING
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DECONSTRUCTION
DIVISION 03 - CONCRETE
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 14 STRUCTURAL METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 13 33 PIER TIMBERWORK
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19.10 10 INSULATED WIRE AND CABLE
26 24 16.00 40 PANELBOARDS
DIVISION 31 - EARTHWORK
31 62 13.20 PRECAST/PRESTRESSED CONCRETE PILES
31 62 19.13 TIMBER MARINE PILES
31 62 19.14 TIMBER PILE WRAP SYSTEM
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 31 19 STONE, PROTECTION FOR STRUCTURES
35 51 13.00 20 CONCRETE FLOATING DOCKS AND ATTENUATOR
35 51 14.00 10 ALUMUINUM GANGWAY SYSTEM
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
Amendment 0002
Amendment 0002
PROJECT TABLE OF CONTENTS (Continuation Page)
ATTACHMENTS:
A. MOTCO Barge Pier Routine Inspection Report Facility Number: 00126, Military Ocean Terminal, Concord, California by KCI Technologies, Inc. Report Date: November 2016.
B. Determination of Categorical Exclusion, MOTCO – Barge Pier and Boat
Ramp Upgrade, Contra Costa County, CA, U.S. Army Corps of Engineers, Sacramento District.
C. Memorandum for Director, Defense Ammunition Center DDESB Approval of
Explosives Safety Submission (ESS), Munitions and Explosives of Concern (MEC) Removal Action, Military Ocean Terminal Concord (MOTCO), Concord, CA, located at the Former Naval Weapons Station, Concord, CA, 7 August 2013.
D. Munitions and Explosives of Concern (MEC) Support during Hazardous
Toxic, and Radioactive Waste (HTRW) and Construction Activities U.S.
Army Corps of Engineers, Engineering Pamphlet EP 75-1-2 dated 01 August 2004.
E. Final Work Plan for Munitions and Explosives of Concern Construction
Support for Concord Barge Pier Renovation, Military Ocean Terminal, Concord, CA. Contract W91238-10-D-0036, June 2014.
F. “HS20 Pier Analysis” December 18, 2013 prepared by B.C. Gerwick.
G. Boring Logs
-- End of Table of Contents -
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 10.00 28
DIVING
PART 1 GENERAL
1.1 SUMMARY
1.2 DIVING ENVIRONMENT
1.2.1 Access to Work Area
1.2.2 Anticipated Environment
1.3 DIVE OPERATION NOTIFICATION
1.4 REFERENCES
1.5 SUBMITTALS
1.6 MEC CLEARANCE DIVING
1.7 PILE WRAP AND PILE JACKET DIVING
1.8 SPECIAL SAFETY REQUIREMENTS
1.9 ANNUAL DIVER PHYSICALS
1.10 DIVE OPERATION PLAN
1.11 PHASE MEETINGS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 DIVE CREW COMPOSITION AND DIVE EQUIPMENT
3.2 CONTRACTOR FURNISHED DIVING SUPPORT EQUIPMENT
3.3 EMERGENCY MEDICAL TREATMENT
3.4 DIVE OPERATIONS AND LOGS
3.5 STAND-BY MEC CREW
-- End of Section Table of Contents --
SECTION 01 35 10.00 28 Page 1 Amendment 0002
SECTION 01 35 10.00 28
DIVING
PART 1 GENERAL
1.1 SUMMARY
This section covers the diving requirements for the MEC support and Pile Wrap operations to be performed as required within this contract. Diving shall be performed in accordance with the latest edition of the U.S. Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1, Section 30:, OSHA 29 CFR 1910, Subpart T and the latest edition of NAVSEA SS521-AG-PRO-010 U.S. Navy Diving Manual, Volume 1 and USACE ER 385-1-86 inclusive of all other references listed therein.
1.2 DIVING ENVIRONMENT
1.2.1 Access to Work Area
Access to the work area will be provided from the Barge Pier or by boat from the Suisun Bay.
1.2.2 Anticipated Environment
The Anticipated Diving Environment consists of the following:
a. Water depth less than 35 feet.
b. Water temperature less than 60 degrees F.
c. Water velocity up to 3 knots, based on tidal current prediction for the channel near the site.
d. Visibility less than 2 feet, and often times zero, based on previous diving work at the site.
e. Hazards: Overhead, buried MEC/UXO and other objects below mudline.
f. Very soft bottom (mud) and shallow water (depth less than 8 feet).
1.3 DIVE OPERATION NOTIFICATION
The Contractor shall notify the Government a minimum of 15 calendar days prior to the start of dive operations. All dive work notifications shall also be delivered to the USACE Sacramento District Designated Dive Coordinator (DDC) and Alternate Dive Coordinator (ADC):
DDC: Provided to the Contractor after Award Safety and Occupational Health Specialist USACE 1325 J. Street, Room 960 Sacramento, California 95814 (Work) (Cell) (Fax) (Email)
SECTION 01 35 10.00 28 Page 2 Amendment 0002
SECTION 01 35 10.00 28 Page 3 Amendment 0002
ADC: Provided to the Contractor after Award Safety and Occupational Health Specialist USACE 1325 J. Street, Room 960 Sacramento, California 95814 (Work) (Cell) (Fax) (Email)
1.4 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
ER 385-1-86 (20 Sept 2010) Safety U.S. Armry Corps of Engineers Dive Program
DEPARTMENT OF DEFENSE EXPLOSIVE SAFETY BOARD (DDESB)
DDESB TP-18 (20 December 2004) Minimum Qualifications for Unexploded Ordnance (UXO) Technicians and Personnel
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.5 SUBMITTALS
The Contractor shall submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the Preconstruction submittals no less than 30 calendar days prior to planned Dive operations. Dive operations shall not be allowed to commence until all required dive submittals have been reviewed and approved by the USACE Sacramento District DDC or ADC:
SD-01 Preconstruction Submittals
Safe Practices Manual; G
Emergency Management Plan; G
Dive Operation Plan; G
Activity Hazard Analysis); G
Critical Lift Plan; G
SD-06 Test Reports
Daily Dive Logs
SD-07 Certificates
SECTION 01 35 10.00 28 Page 4 Amendment 0002
Physician's Statement for Dive Personnel
1.6 MEC CLEARANCE DIVING
Diving Operations are required to provide Munitions and Explosives of Concern (MEC) construction support. Dive personnel conducting the MEC clearance operation and directly involved with MEC search and recovery shall be qualified per DDESB TP-18. During MEC clearance dive operations, there shall be no more than eight (8) divers in the water at one time within the Quantity Distance (QD) arc. See Specification Section 01 35 20 MEC Clearance Operations for additional MEC construction support requirements.
1.7 PILE WRAP AND PILE JACKET DIVING
Diving operations for pile wrapping and pile jacket shall not begin until the related MEC clearance operation is complete, after which the Government must approve the MEC Clearance Quality Assurance/Hazard Assessment Audit Report and notify the Contractor in writing to proceed with pile wrapping. Failure to obtain Government approval of the MEC clearance audit shall result in the extension of the full MEC construction support requirements beyond the MEC clearance operation to the Pile Wrap and pile jacket operation as well.
1.8 SPECIAL SAFETY REQUIREMENTS
In addition to Safety and Health Requirements Manual, EM 385-1-1 , the Contractor shall comply with the requirements listed below. Paragraph numbers refer to EM 385-1-1.
a. EM 385-1-1 Section 30 - Surface Supplied Air (SSA) Operations, Paragraph 30.D.03 applies. A recompression chamber shall be required on-site for any dive over 100 ft. or outside the no-decompression limits.
b. EM 385-1-1 Section 30 - Mixed Gas Diving Operations. On a case by case basis to be determined by the DDC, the use of up to 40% Nitrox will be allowed for diving operations. As a minimum, the following conditions must be met in order for use of Nitrox/mixed gas to be approved:
(1) If NITROX / mixed gas diving operations methodology is utilized, all dive team members (dive supervisor, divers, chamber operator, timekeeper, tenders) must possess NITROX and / or mixed gas certification from a nationally recognized organization (NAUI, PADI, TDI, IANTD, etc.). Copies of these certifications shall be submitted for review prior to the dive.
(2) A NITROX / mixed gas certified COE dive safety inspector (DSI) shall be on site at all times during NITROX / mixed gas diving operations.
(3) The Dive Operation Plan shall detail exactly what Nitrox/mixed gas dive work will be accomplished including expected depths and bottom times.
(4) The Dive Operation Plan and Activity Hazard Analysis shall describe procedures for safe use of Nitrox/mixed gas and shall be approved prior to any Nitrox dives.
SECTION 01 35 10.00 28 Page 5 Amendment 0002
(5) Navy or NOAA Nitrox Dive Tables or other decompression tables designed specifically for the OEA mixture being used shall be followed without exception.
c. Line tended SCUBA diving may be permitted when approved in writing by the DDC. SCUBA diving operations shall not be conducted at depths over 100 ft., nor outside of decompression limits.
d. Divers in the water shall be tethered to insure that all intrusive activities are confined within the prescribed MEC clearance area limits.
1.9 ANNUAL DIVER PHYSICALS
Annual diver physicals shall conform to the requirements of EM 385-1-1, 30.A.10. Contractor shall submit Physician's Statement for Dive Personnel from a licensed physician that states the diver is "Fit To Dive".
Submitted Physician's Statement shall contain at a minimum the diver's name, the examination date, and the examining physician's name, signature, medical license number, and telephone number. The signing physician shall be an MD or DO. Submitted statement shall not contain divers Personal Health Information (PHI) or Personal Identification Information (PII).
1.10 DIVE OPERATION PLAN
a. The Contractor shall prepare a site specific Dive Operation Plan that addresses all the requirements in Section 30, DIVING OPERATIONS of EM 385-1-1. An approved Dive Operation Plan and Safe Practices Manual is required on all projects with work on, or over water. Safe Practices Manual, Dive Operation Plan and revisions shall have cover sheets signed and dated by the Contractor. When diving is subcontracted, cover sheets shall also be signed and dated by diving contractor's principal or authorized representative.
b. The Dive Operation Plan shall be submitted by the Contractor to the Contracting Officer in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. The Dive Operation Plans will be reviewed and found acceptable by two of the following: DDC/ADC/DSR (Dive Safety Representative) prior to start of diving operations. Additional documentation may be required depending on the scope of the diving operations.
1.11 PHASE MEETINGS
The MEC Clearance Diving and the Pile Wrap Diving shall each be treated as a "definable feature of work" in accordance with an accepted Quality Control Plan. Perform a Preparatory and Initial Phase meeting for both phases of diving. Changes to the Dive Operation Plan will be considered as definable features of work and also require Preparatory and Initial Phase meetings.
PART 2 PRODUCTS
(Not Used)
SECTION 01 35 10.00 28 Page 6 Amendment 0002
PART 3 EXECUTION
3.1 DIVE CREW COMPOSITION AND DIVE EQUIPMENT
a. Each dive crew shall be comprised of four (4) members at a minimum; a dive supervisor, a diver, a standby diver, and a tender. A dive crew can also be comprised of six (6) members maximum; a dive supervisor, two divers, two tenders, and a stand-by diver. There shall be no more than two divers per supervisor and each diver in the water shall have a tender.
b. SSA and SCUBA shall have 2-way voice communication. An independent reserve air system (bailout bottle) for all divers is required as specified by EM 385-1-1, paragraph 30, D, E, F. As a minimum, all diver surface air supply compressors, tanks, helmets, and other related equipment must comply with the requirements of EM 385-1-1 , paragraph 30, D, E, F.
3.2 CONTRACTOR FURNISHED DIVING SUPPORT EQUIPMENT
a. Contractor is responsible for providing all equipment required for diving operations.
b. A floating or suspended dive platform shall be furnished from which diving operations will be staged. Approved man-basket(s) shall be provided for each working diver as needed. If a crane is used, it must be operated by a certified crane operator and a Critical Lift Plan submitted for approval. All necessary top-side equipment such as cranes, trucks, and personnel vehicles shall be furnished that are needed to accomplish all required dive work as well as all necessary underwater hand and power tools.
3.3 EMERGENCY MEDICAL TREATMENT
Arrange with local authorities for emergency dive medical response, treatment and evacuation to medical facility and nearest hyperbaric chamber. Provide map with route directions to nearest hospital and hyperbaric chamber in Emergency Management Plan required by EM 385-1-1 .
3.4 DIVE OPERATIONS AND LOGS
Execute dives in accordance with approved Dive Operation Plan and Section DIVING OPERATIONS of EM 385-1-1 . The Contractor shall prepare and submit completed daily dive logs at the end of each dive day. Daily dive logs shall be faxed or emailed to DDC and ADC.
3.5 STAND-BY MEC CREW
At any time pile wrap and jacket diving operations are being conducted, there shall be minimum four (4) member dive crew with UXO-qualified personnel per DDESB TP-18 present on site. This crew is also required to be present on site during all pile driving operations for both the Barge Pier Repair and construction of the Small Craft Berthing Facility. This crew may also perform other duties but shall be ready to respond and take necessary action in case suspected MEC is discovered during the pile wrap and jacket diving operation or pile driving.
-- End of Section --
SECTION 01 35 10.00 28 Page 7 Amendment 0002
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 35 20
MEC CLEARANCE OPERATIONS
PART 1 GENERAL
1.1 GENERAL
1.2 PROJECT PLANNING
1.3 PROJECT MANAGEMENT
1.4 MEC SUPPORT NOTIFICATION
1.5 REFERENCES
1.6 SUBMITTALS
1.7 SPECIAL QUALIFICATIONS
1.8 MEC SUPPORT WORK PLAN
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 ANOMALY INVESTIGATION
3.2 MEC RESPONSE OPTIONS
3.3 DISPOSAL OF MEC
3.4 MEC AFTER-ACTION REPORT
3.5 MEC SUPPORT OPERATIONS AND LOGS
3.6 MEC QUALITY ASSURANCE/HAZARD ASSESSMENT AUDIT
SECTION 01 35 20 Page 1 Amendment 0002
SECTION 01 35 20
MEC CLEARANCE OPERATIONS
PART 1 GENERAL
1.1 GENERAL
This specification section applies to both the repair of the Barge Pier and the construction of the Small Craft Berthing Facility. This project requires Unexploded Ordnance (UXO) qualified personnel to perform MEC clearance for the utility trench excavation, pile driving, structural jacket, and wrap areas prior to conducting pile repair work. MEC clearance is required for both the repair of the Barge Pier and the construction of the new Small Craft Berthing Facility. The Contractor shall identify, remove and dispose of all MEC within the clearance area limits in accord with the requirements of the U.S. Army Corps of Engineers Explosives Safety and Health Requirements Manual EM 385-1-97 , the Explosive Safety Submission (ESS) for Military Ocean Terminal Concord (MOTCO), and the Department of the Army Memo Munitions Response Actions Minimum Separation Distances (relative to Impulse Water Pressure) from Underwater Detonations. The Contractor shall be responsible for providing all necessary MEC coordination and communication with the USACE and MOTCO.
1.2 PROJECT PLANNING
The Contractor shall be responsible for project set-up and planning as follows:
a. The Contractor shall be responsible for preparing the MEC Support Work Plan to supplement the Contractor's Dive Operation Plan and overall Work Plan/Site Plan.
b. The Contractor shall be responsible for acquiring additional information including utility maps, as-built drawings/record drawings, historical data, and any other pertinent background information.
c. The Contractor shall be responsible for obtaining all federal, state, and local permits and approvals required to perform the MEC clearance work.
1.3 PROJECT MANAGEMENT
The Contractor shall provide project oversight and coordination to ensure that the project schedule is maintained and that project submittals and field work are completed in accordance with all project requirements.
1.4 MEC SUPPORT NOTIFICATION
The Contractor shall notify the Government a minimum of 15 calendar days prior to the start of MEC operations. All MEC support work notifications shall also be delivered to the USACE Sacramento District Designated Ordnance and Explosives Safety Specialist (OESS), the Alternate OESS, and the MOTCO Safety Officer.
SECTION 01 35 20 Page 2 Amendment 0002
Sacramento District Designated OESS:
Michael L. Wheeler Ordnance and Explosive Safety Specialist 1325 J Street CESPK-SO Sacramento CA, 95814
(916) 557-5369
(916) 307-9048 BB
michael.l.wheeler@usace.army.mil
Sacramento District Alternate OESS:
Provided to the Contractor after Award
MOTCO Safety Officer:
Provided to the Contractor after Award
The Contractor shall be responsible for immediately notifying the Sacramento District Designated OESS or Alternate OESS and the MOTCO Safety Officer if any MEC is discovered.
1.5 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 200-1-15 (20 December 2013)Technical Guidance for Military Munitions Response Actions, Environmental and Munitions Center of Excellence Interim Guidance Document
EM 385-1-1 (2014) Safety and Health Requirements Manual
EM 385-1-97 (2013) Explosives - Safety and Health Requirements Manual
EP 1110-1-18 (24 April 2000)Ordnance and Explosives Response
Department of the Army Memo (16 September 2013) Munitions Response Action - Minimum Separation Distance (Relative to Impulse Water Pressure) for Underwater Detonations
Explosive Safety Submission (6 August 2013) Munitions and Explosives of Concern Removal Action, Military Ocean Terminal Concord (MOTCO) Port Chicago Terrestrial Explosion Area MRS & Port Chicago Water Explosion Area MRS, Removal Action/Construction Support
SECTION 01 35 20 Page 3 Amendment 0002
DEPARTMENT OF DEFENSE EXPLOSIVE SAFETY BOARD (DDESB)
TP-18 , Revision 1 (20 December 2004) Minimum Qualifications for Unexploded Ordnance (UXO) Technicians and Personnel (24 June 2020) Minimum Qualifications for Personnel Conducting Munitions and Explosives of Concern-Related Activities
The Contractor shall be responsible for complying with the current edition and all changes posted on the web as of the effective date of this solicitation.
1.6 SUBMITTALS
The Contractor shall submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES. Submit the pre-construction submittals no less than 30 calendar days prior to planned MEC operations. MEC operations will not be allowed to commence until all required MEC submittals have been reviewed and accepted by the Sacramento District OESS or Alternate OESS, and the MOTCO Safety Officer:
SD-01 Preconstruction Submittals
MEC Support Work Plan; G
SD-06 Test Reports
Daily MEC Logs
SD-11 Closeout Submittals
After Action Report; G
1.7 SPECIAL QUALIFICATIONS
The Contractor shall provide UXO-qualified personnel in accordance with EM 385-1-1 , and DDESB TP-18 , Revision 1. UXO Technician/Personnel to include:
a. Senior UXO Supervisor (SUXOS)
b. UXO Quality Control Specialist (UXOQCS)
c. UXO Safety Officer (UXOSO)
d. UXO-Qualified Divers
The SUXOS and UXOSO may also be members of a dive crew; the UXOQCS may not be 'dual-hatted'.
1.8 MEC SUPPORT WORK PLAN
The Contractor shall prepare a site-specific MEC Support Work Plan (WP) that addresses the management and technical approach to be used in completing the MEC construction support operation. The WP shall conform to the project planning requirements of EM 200-1-15 , and include the following information as a minimum::
a. The WP shall describe the MEC support organization and identify the name, qualifications, duties, responsibilities and authorities of each person assigned a MEC support function.
SECTION 01 35 20 Page 4 Amendment 0002
b. The WP shall describe the overall approach for the field work and address site specific logistical requirements such as staging and storage areas, potential interferences with on-going MOTCO operations, geophysical instrumentation for finding anomalies, and procedures for investigating, removing and disposing of any MEC found within the work area.
c. The WP shall include a description of the procedure that will be used to insure that all intrusive activities are confined within the prescribed MEC support Work Area limits for the duration of the Project.
d. The WP shall include as sub-plans the relevant planning documents required by EM 200-1-15 specific to the MEC support operation, and which are consistent with the overall Project Work Plans.
e. The WP shall include an Installation Outreach and Traffic Control Plan. The project site is located within the MOTCO Tidal Area and coordination with MOTCO operations, as well as traffic control measures may be required during MEC support work. This plan shall describe the:
1) Communication measures the contractor will employ to notify affected employees at the Installation.
2) Traffic control measures to be used should temporary road closures be necessary.
3) Alternate work schedules during anomaly investigation to minimize impacts to MOTCO operations.
4) The contractor will organize an Installation Outreach meeting with USACE and MOTCO to brief affected personnel.
PART 2 PRODUCTS
(Not used)
PART 3 EXECUTION
3.1 ANOMALY INVESTIGATION
The Contractor shall provide all labor, material and equipment required to discover and investigate anomalies within the Barge Pier and Small Craft Berthing Facility Work Areas shown on the drawings. If any MEC is identified, the Contractor shall immediately notify the Sacramento District Designated OESS and Alternate OESS, and the MOTCO Safety Officer and describe the action to be taken with respect to removal/disposal of the item in accordance with the established ESS requirements.
3.2 MEC RESPONSE OPTIONS
a. If the anomaly is identified as MEC and it is acceptable to move, then the Contractor shall remove and dispose of the item following acceptance of the proposed action by the Government.
b. If the anomaly is identified as MEC and judged unacceptable to move, then the Contractor will leave it in place, mark the item and keep
SECTION 01 35 20 Page 5 Amendment 0002 personnel away until a decision is made on the appropriate course of action. MEC operations in the area may proceed as long as the item is marked and avoided. The Contractor shall coordinate a meeting with the Government to decide on an appropriate course of action for the item.
3.3 DISPOSAL OF MEC
The Contractor shall provide all labor, material and equipment to dispose of MEC from the work area within the MRS. Maintain an accurate record of the method of removal and disposal of all MEC.
a. The Contractor shall provide the donor explosives and initiators required to conduct the disposal operation. Storage of any commercial explosives on-site will not be permitted. Therefore the Contractor shall schedule the disposal and deliver the donor explosives as-needed.
b. The Contractor shall provide detailed disposal procedures in the MEC Support Plan.
3.4 MEC AFTER-ACTION REPORT
The Contractor shall prepare and submit an After Action Report (AAR) that includes:
a. Listing of all anomalies;
b. The coordinate location of each anomaly;
c. The decision criteria used to determine which anomalies were investigated as potential MEC;
d. The excavation depth for each investigated anomaly.
e. The finding of the investigation, and if MEC, a description of the item and details of its recovery and disposal.
The Contractor shall submit a draft report for Government review and provide written responses to all comments on the report. The review comments and responses, with a Statement of MEC Clearance Completion prepared by the Contractor shall be submitted with the final report.
3.5 MEC SUPPORT OPERATIONS AND LOGS
Execute the MEC Construction Support operations in accordance with the approved MEC Support Plan, the ESS for the Installation and EM 385-1-97 EXPLOSIVES SAFETY AND HEALTH REQUIREMENTS MANUAL. Contractor shall prepare and submit a MEC Log at the end of each day of MEC operations and report finding of MEC if any, and MEC Support actions taken. Daily MEC logs shall be faxed or emailed to the Designated OESS and Alternate OESS, and the MOTCO Safety Officer.
3.6 MEC QUALITY ASSURANCE/HAZARD ASSESSMENT AUDIT
a. Following conclusion of the Contractor's MEC clearance activities, a MEC Quality Assurance/Hazard Assessment Audit will be conducted of the Contractor's operation to assess the remaining MEC/UXO risk with the objective of reducing the current risk rating from Medium - High to Low.
SECTION 01 35 20 Page 6 Amendment 0002
b. The Contractor shall coordinate the Audit team, which shall include the Contractor's MEC Quality Control Specialist, the overall Project Quality Control System Manager, the Sacramento District Designated OESS and Alternate OESS, and the MOTCO Safety Officer. The Audit will confirm whether the Contractor has satisfied all the MEC clearance requirements of the contract. The Contractor shall prepare an Audit Report for signature by the members of the Audit team.
c. The Installation Commander will provide a Probability Assessment based on the Audit Report to take the risk rating of the MEC cleared area from Medium-High to Low. The Contracting Officer may then prepare a letter authorizing the Contractor to proceed with the pile repair work in the cleared area, and waiving the ESS requirements that all divers be UXO-qualified and that no more than eight (8) divers be permitted in the water at one time within the Quantity Distance (QD) arc.
d. Guidance for the required Audit Report is contained in Chapter 17
PROJECT COMPLETION, EP 1110-1-18
SECTION 01 35 20 Page 7 Amendment 0002
SECTION TABLE OF CONTENTS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
SECTION 06 13 33
PIER TIMBERWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 QUALITY CONTROL
1.4.1 Preservative Treatment - Pier Timberworks
1.4.2 SDS and CIS
1.4.3 Best Management Practices (BMPs)
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Lumber and Timbers
2.1.2 Preservative Treatment
2.1.3 Field Treatment
2.1.4 Hardware
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Framing
3.1.2 Fender Systems
3.1.3 Bulkheads
3.1.4 Bracing
3.1.5 Wheel Guard and Railing
3.1.6 Fastening
3.2 FIELD TREATMENT
3.2.1 Pier Timberwork
3.2.2 Galvanized Surfaces
SECTION 06 13 33 Page 1 Amendment 0002
SECTION 06 13 33
PIER TIMBERWORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA M4 (2015) Standard for the Care of Preservative-Treated Wood Products
AWPA M6 (2013) Brands Used on Preservative Treated Materials
AWPA P34 (2014) Standard for Copper Naphthenate, Waterbone (CuN-W)
AWPA P5 (2015) Standard for Waterborne Preservatives
AWPA T1 (2017) Use Category System: Processing and Treatment Standard
AWPA U1 (2017) Use Category System: User Specification for Treated Wood
ASTM INTERNATIONAL (ASTM)
ASTM A123/A123M (2017) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A153/A153M (2016 a) Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-P-21035 (1991; Rev B; Notice 2 2003) Paint, High Zinc Dust Content, Galvanizing Repair (Metric)
WESTERN WOOD PRESERVERS INSTITUTE (WWPI)
WWPI Mgt Practices (1996; R 2011) BMP's for the Use of Treated Wood in Aquatic Environments
SECTION 06 13 33 Page 2 Amendment 0002
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-06 Test Reports
Preservative Treatment - Pier Timberworks; G
The Contractor must provide the Contracting Officer's Representative (COR) with the inspection report of an independent inspection agency, approved by the Contracting Officer, that proposed products comply with applicable AWPA standards.
SD-07 Certificates
SDS and CIS; G
Best Management Practices (BMPs); G
1.3 DELIVERY, STORAGE, AND HANDLING
Handle and store piles in accordance with AWPA M4. Follow precautions identified in SDS and CIS provided by the supplier of treated wood products.
Open-stack untreated timber and lumber material on skids at least 12 inches above ground, in a manner that will prevent warping and allow shedding of water. Close-stack treated timber and lumber material in a manner that will prevent long timbers or preframed material from sagging or becoming crooked. Keep ground under and within 5 feet of such piles free of weeds, rubbish, and combustible materials. Protect materials from weather.
Handle treated timber with ropes or chain slings without dropping, breaking outer fibers, bruising, or penetrating surface with tools. Do not use cant dogs, peaveys, hooks, or pike poles. Protect timber and hardware from damage.
1.4 QUALITY CONTROL
1.4.1 Preservative Treatment - Pier Timberworks
The Contractor shall be responsible for the quality of treated wood products. The Contractor shall provide the Contracting Officer's Representative (COR) with the inspection report of an independent inspection agency, approved by the Contracting Officer, certifying that the products comply with applicable AWPA standards. Identify treatment on each piece by the quality mark of an agency accredited by the Board of Review of the American Lumber Standard Committee. Inspect all preservative-treated wood visually to ensure there are no excessive residual materials or preservative deposits. Material must be clean and dry or it will be rejected because of environmental concerns.
1.4.2 SDS and CIS
Provide Safety Data Sheets (SDS) and Consumer Information Sheets (CIS) associated with timber preservative treatment. Contractor must comply
SECTION 06 13 33 Page 3 Amendment 0002 with all safety precautions indicated on SDS and CIS.
1.4.3 Best Management Practices (BMPs)
The producer of the treated wood products must provide certification that WWPI Mgt Practices for the use of Treated Wood in Aquatic and Wetland Environments were utilized including a written description and appropriate documentation of the BMPs utilized.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Lumber and Timbers
Provide solid sawn lumber and timbers Douglas Fir-Larch, with a stress rating of 16015000 psi, and identified by the grade mark of a recognized association or independent inspection agency using the specific grading requirements of an association recognized as covering the species used.
The association or independent inspection agency must be certified by the Board of Review, American Lumber Standards Committee, to grade the species used. For secondary members use lumber or timbers rated No. 1 or better.
2.1.2 Preservative Treatment
Fabricate lumber and timbers before preservative treatment. Each piece of treated lumber or timber must be branded, by the producer, in accordance with AWPA M6. The type of preservative, retention, and penetration must be based on Use Category Marine Use 5A and species and in accordance with AWPA U1 and AWPA T1. The Contractor must be responsible for the quality of treated wood products.
For wood subject to immersion in contact with salt water, or brackish water, lumber and timber preservative treatment must be Waterborne preservative in accordance with AWPA P5 ACZA - Ammoniacal Copper Zinc Arsenate. Retention shall be 2.5 pcf.
2.1.3 Field Treatment
All cuts, holes and injuries such as holes from removal of spikes or nails which may penetrate the treated zone must be field treated with copper naphthenate conforming to AWPA P34.
2.1.4 Hardware
Hardware consists of bolts with necessary nuts and washers, timber connectors, drift pins, dowels, nails, screws, spikes, and other fastenings. Bolts and nuts must conform to ASTM A307. Provide cast-iron ogee, malleable iron washers, or plate or cut washers. Provide bolts with washers under nut and head. Provide timber connectors and other metal fastenings of type and size required. Hot-dip galvanize all hardware specified or indicated in accordance with ASTM A123/A123M or ASTM A153/A153M , as applicable.
SECTION 06 13 33 Page 4 Amendment 0002
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Framing
Cut and frame lumber and timber so that joints will fit over contact surface. Secure timbers and piles in alignment. Open joints are unacceptable. Shimming is not allowed unless otherwise indicated. Drill holes for drift pins and dowels with a bit 1/16 inch less in diameter than the pin or dowel. Drill holes for truss rods or bolts with a bit 1/16 inch larger in diameter than rod or bolt. Drill holes for lag screws in two parts. Make lead hole for shank the same diameter as shank. Make lead hole for the threaded portion approximately two-thirds of the shank diameter. Counterbore for countersinking wherever smooth faces are indicated or specified.
3.1.2 Fender Systems
Face fender piles to receive chocks. Use only full-length timbers for chocks and tightly fit against fender piles. Face fender piles to provide a flat bearing against wales. Splice wales in location in a manner as existing. Additional splicing of wales will not be permitted. Bevel tops of fender piles outboard.
3.1.3 Bulkheads
Make timber bulkheads of height and width required.
3.1.4 Bracing
Provide bracing of sufficient length to provide a minimum distance of 8 inches as shown on drawings, between outside bolt and end of brace.
Bracing and girts must bear firmly against piles or timber to which secured. Place fillers to avoid bending the bracing more than 1 inch out of line when bracing bolts or other fastenings are drawn up tight.
Built-up fillers will not be permitted. Make filler a single piece of the same treated lumber as that in the brace, with a width of at least 6 inches and a length of at least 12 inches. Bolt ends of bracing through pile, post, or cap with a bolt of at least 1 inch diameter.
3.1.5 Wheel Guard and Railing
Lay wheel guards in sections at least 12 feet long; bolt through floor plank and through outside stringer or nailing piece with 3/4 inch bolts spaced 4 feet or less apart. Bevel wheel guards on pier side as shown.
Provide wheel guard material surfaced on four sides (S4S) on the top edge and pier side. Provide surfaced (S4S) material for railings.
3.1.6 Fastening
Vertical bolts must have nuts on the lower end. Where bolts are used to fasten timber to timber, timber to steel, or timber to concrete, bolt members together when they are installed and retighten immediately prior to final acceptance of contract. Provide bolts having sufficient additional threading to provide at least 3/8 inch per foot thickness of timber for future retightening.
SECTION 06 13 33 Page 5 Amendment 0002
3.2 FIELD TREATMENT
3.2.1 Pier Timberwork
Field treat all cuts, holes, bevels, notches, refacing, abrasions, and injuries such as abrasions or holes from removal of spikes or nails made in the field in treated piles or timbers in accordance with AWPA M4, SDS and CIS. Trim cuts and abrasions before field treatment. Depressions or openings around bolt holes, joints, or gaps including recesses formed by counterboring must be field treated with copper naphthenate conforming to
AWPA P34.
3.2.2 Galvanized Surfaces
Repair and recoat zinc coating which has been field or shop cut, burned by welding, abraded, or otherwise damaged to such an extent as to expose the base metal. Thoroughly clean the damaged area by wire brushing and remove traces of welding flux and loose or cracked zinc coating prior to painting. Paint cleaned area with two coats of zinc oxide-zinc dust paint conforming to MIL-P-21035 . Compound paint with a suitable vehicle in a ratio of one part zinc oxide to four parts zinc dust by weight.
SECTION 06 13 33 Page 6 Amendment 0002
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 62 19.13
TIMBER MARINE PILES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
1.4 QUALITY ASSURANCE
1.4.1 Preservative Treatment - Timber Marine Piles
1.4.2 SDS and CIS
1.4.3 Best Management Practices (BMPs)
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Piles
2.1.2 Preservative Treatment
2.1.3 Field Treatment
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Pile Driving Equipment
3.1.1.1 Pile Driving Hammers
3.1.1.2 Leads
3.1.1.3 Driving Cap or Helmet and Cushion Block
3.1.1.4 Pile Collars
3.1.2 Pile Installation
3.1.2.1 Driving Piles
3.1.2.2 Tolerances in Driving Piles
3.1.2.3 Pile Driving Records
3.2 PROTECTION
3.2.1 Protection of Piles
3.2.1.1 Damaged Piles
3.3 FIELD QUALITY CONTROL
3.3.1 Inspections
SECTION 31 62 19.13 Page 1 Amendment 0002
SECTION 31 62 19.13
TIMBER MARINE PILES
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN WOOD PROTECTION ASSOCIATION (AWPA)
AWPA M4 (2015) Standard for the Care of Preservative-Treated Wood Products
AWPA M6 (2013) Brands Used on Preservative Treated Materials
AWPA P34 (2014) Standard for Copper Naphthenate, Waterbone (CuN-W)
AWPA P5 (2015) Standard for Waterborne Preservatives
AWPA T1 (2017) Use Category System: Processing and Treatment Standard
AWPA U1 (2017) Use Category System: User Specification for Treated Wood
ASTM INTERNATIONAL (ASTM)
ASTM D25 (2012) Round Timber Piles
WESTERN WOOD PRESERVERS INSTITUTE (WWPI)
WWPI Mgt Practices (1996; R 2011) BMP's for the Use of Treated Wood in Aquatic Environments
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for Contractor Quality Control approval. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-03 Product Data
Piles; G
Pile Driving Equipment; G
Submit complete descriptions of pile driving equipment, including hammers, leads, driving helmets, cushion blocks, driving blocks, SECTION 31 62 19.13 Page 2 Amendment 0002 collars, extractors, and other appurtenances for approval prior to commencement of work.
SD-06 Test Reports
Preservative Treatment - Timber Marine Piles; G
The Contractor must provide the Contracting Officer's Representative (COR) with the inspection report of an independent inspection agency, approved by the Contracting Officer, that products comply with applicable AWPA standards.
SD-07 Certificates
SDS and CIS; G
Best Management Practices (BMPs); G
SD-11 Closeout Submittals
Pile Driving Records; G
Submit pile driving records within 15 calendar days after completion of driving.
1.3 DELIVERY, STORAGE, AND HANDLING
Handle and store piles in accordance with AWPA M4. Follow precautions identified in SDS or CIS provided by the supplier of treated wood products. Special care must be taken in supporting piles to prevent the induction of excessive bending stresses in the piles. Piles must be carefully handled without dropping, breaking of outer fibers, and penetrating the surface with tools. Peaveys, cant hooks, pikes, and other pointed tools must not be used in handling treated piles.
1.4 QUALITY ASSURANCE
1.4.1 Preservative Treatment - Timber Marine Piles
The Contractor must be responsible for the quality of treated wood products. The Contractor must provide the Contracting Officer's Representative (COR) with the inspection report of an independent inspection agency, approved by the Contracting Officer, certifying that the products comply with applicable AWPA standards. Identify treatment on each piece by the quality mark of an agency accredited by the Board of Review of the American Lumber Standard Committee. Inspect all preservative-treated wood visually to ensure there are no excessive residual materials or preservative deposits. Material must be clean and dry or it will be rejected because of environmental concerns.
1.4.2 SDS and CIS
Provide Safety Data Sheets (SDS) and Consumer Information Sheets (CIS) associated with timber pile preservative treatment. Contractor must comply with all safety precautions indicated on the SDS and CIS.
1.4.3 Best Management Practices (BMPs)
The producer of the treated wood products must provide certification that
SECTION 31 62 19.13 Page 3 Amendment 0002
WWPI Mgt Practices for the use of Treated Wood in Aquatic and Wetland Environments were utilized including a written description and appropriate documentation of the BMPs utilized.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Piles
Provide Douglas fir, treated piles in accordance with AWPA U1 Commodity Specification G and conforming to ASTM D25 and other requirements as specified. Piles must be in one piece for the length to provide minimum 15 feet tip penetration below mudline. Splices will not be permitted.
Each treated pile must be branded by the producer, in accordance with AWPA M6. Minimum pile circumference at 3 feet from the butt end must be 44 inches minimum.
2.1.2 Preservative Treatment
Treat piles based on Use Category and species in accordance with AWPA U1 and AWPA T1 to the retention and penetration for marine piling and produce in accordance with WWPI Mgt Practices . Piles preservative treatment must be Waterborne preservative for marine piles in accordance with AWPA P5 ( ACZA - Ammoniacal Copper Zinc Arsenate. Retention shall be 2.5 pcf.
2.1.3 Field Treatment
Piles must be field treated in accordance with AWPA M4. All cuts, holes and injuries such as holes from removal of spikes or nails which may penetrate the treated zone must be field treated with copper naphthenate conforming to AWPA P34.
PART 3 EXECUTION
3.1 INSTALLATION
3.1.1 Pile Driving Equipment
Pile driving equipment must meet the following requirements.
3.1.1.1 Pile Driving Hammers
Pile driving hammers must be steam, air or diesel, single-action, double-acting, differential-acting type. The size or capacity of hammers must be as recommended by the manufacturer for the pile weights and solid formation to be penetrated. The pile hammer must be of sufficient weight and energy to install the specified pile without damage into the soils expected to be encountered.
3.1.1.2 Leads
Leads are required and must be fixed at the top and adjustable at the bottom. Swinging leads will not be permitted.
3.1.1.3 Driving Cap or Helmet and Cushion Block
Driving cap or helmet must be an approved design and must be capable of protecting pile heads, minimizing energy absorption, and transmitting
SECTION 31 62 19.13 Page 4 Amendment 0002 hammer energy uniformly and consistently to piles. Place driving helmet or cap and cushion block combination between top of pile and the ram.
Driving cap must fit snugly on the top of piles and must employ a cushion block to prevent impact damage to piles. The cushion block may be a solid or laminated softwood block with the grain parallel to the pile axis and enclosed in a close-fitting steel housing. The thickness of the block must be suitable for the length of pile to be driven and the character of subsurface material to be encountered. If block is damaged, split, highly compressed, charred or burned, or has become spongy or deteriorated, replace with new block. Under no circumstances will the use of small wood blocks, wood chips, rope, or other material permitting excessive loss of hammer energy be permitted.
3.1.1.4 Pile Collars
Collars or bands for protecting pile butts against splitting, brooming, and other damage while being driven must be of an approved design.
3.1.2 Pile Installation
3.1.2.1 Driving Piles
A complete and accurate record of the driving of piles must be compiled by the Contractor for submission to the Contracting Officer. When driving long piles of high slenderness ratio, special precautions must be taken to ensure against overstressing and leading away from a plumb or true position. During driving, pile driving hammers must be operated at all times at the rate and conditions recommended by the hammer manufacturer.
Each pile must be driven continuously and without interruption until the required depth of penetration has been attained. Deviation from this procedure will be permitted only in case the driving is stopped by causes which reasonably could not have been anticipated. Piles must be driven to the full penetration required where practicable to do so without damage to the piles. If found impracticable to drive any pile to the depth required, such pile must be pulled. Piles which have uplifted after driving must be redriven to grade after conclusion of driving in that general area. After driving is completed, fender piles must have tops beveled outboard and be capped.
3.1.2.2 Tolerances in Driving Piles
Piles must be accurately placed in the correct location and alignments both laterally and longitudinally and to the vertical lines. At cutoff elevation, butts must be within 4 inches laterally of the location indicated. A variation of not more than 0.25 inch per foot of pile length from the vertical for plumb piles will be permitted. Inspect piles for heave. Redrive heaved piles to the required tip elevation. Remove and replace with new piles those damaged, misplaced, driven below the design cutoff, or driven out of alignment at no additional cost to the Government.
3.1.2.3 Pile Driving Records
Keep a complete and accurate driving record of each pile driven. Indicate pile location, deviations from design location, diameter, original length, mudline elevation, tip elevation, cutoff elevation, penetration in blows per foot for the last 10 feet, hammer data including rate of operation, make, and size, and unusual pile behavior or circumstances experienced during driving such as redriving, heaving, weaving, obstructions, and
SECTION 31 62 19.13 Page 5 Amendment 0002 unanticipated interruptions. Make pile driving records available to the Contracting Officer at the job site, a minimum of 24 hours after each day of pile driving. Include in the construction records the wood species, preservative type, retention, and producer of installed pile.
3.2 PROTECTION
3.2.1 Protection of Piles
Square the heads and tips of piles to the driving axis. Laterally support piles during driving, but do not unduly restrain piles from rotation in the leads. Handle, protect, and field treat piles in accordance with
AWPA M4.
3.2.1.1 Damaged Piles
Driving of piles must not subject them to damage. Piles which are damaged, split, broomed, or broken by reason of internal defects or by improper driving below cutoff elevation so as to impair them for the purpose intended must be removed and replaced. Minor damaged areas of treated piles must be field treated in accordance with AWPA M4.
3.3 FIELD QUALITY CONTROL
3.3.1 Inspections
When Government inspections result in product rejection, the Contractor must promptly segregate and remove rejected material from the premises.
The Government may also charge the Contractor an additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
SECTION 31 62 19.13 Page 6 Amendment 0002
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 51 13.00 20
CONCRETE FLOATING DOCKS AND ATTENUATOR
PART 1 GENERAL
1.1 REFERENCES
1.2 MODIFICATIONS TO REFERENCES
1.3 SUBMITTALS
1.4 CONTRACTOR QUALIFICATIONS
1.5 DESIGN REQUIREMENTS
1.5.1 Precast Concrete Float Design
1.5.1.1 Finger Docks and Attenuator Loading
1.5.1.2 Performance
1.5.2 Tread Plate Design
1.5.2.1 Tread Plate Loading
1.5.2.2 Performance
1.5.3 Precast Floast Quality Control Program
1.5.4 Drawing Information
1.5.5 Design Calculations and Drawings
1.6 DELIVERY AND STORAGE
1.7 FACTORY INSPECTION
1.8 WARRANTY
PART 2 PRODUCTS
2.1 CONTRACTOR-FURNISHED MIX DESIGN
2.2 PRECAST FLOAT MATERIALS
2.2.1 Cement
2.2.1.1 Fly Ash and Pozzolan
2.2.2 Water
2.2.3 Aggregates
2.2.3.1 Aggregates Selection
2.2.4 Grout
2.2.4.1 Nonshrink Grout
2.2.5 Cementitious Base Coat with Glass Fiber Mesh Reinforcement
(Float Bottom only)
2.2.6 Admixtures
2.2.6.1 Air-Entraining to Produce Between 2 and 5 Percent Air by
Volume
2.2.6.2 Accelerating
2.2.6.3 Water Reducing
2.2.6.4 Corrosion Inhibitor
2.2.7 Reinforcement
2.2.7.1 Reinforcing Steel
2.2.7.2 Welded Wire Fabric
2.2.8 Weldments and Hardware
2.2.8.1 Inserts
2.2.8.2 Steel Fabrications
2.2.8.3 Bolts and Nuts
SECTION 35 51 13.00 20 Page 1 Amendment 0002
2.2.8.4 Waler Rods
2.2.8.5 Washers
2.2.8.6 Cleats
2.2.8.7 Stainless Steel
2.2.9 Foam Core
2.3 PRECAST FLOAT FABRICATION
2.3.1 Precast Floats
2.3.2 Forms
2.3.3 Reinforcement Placement
2.3.4 Concrete
2.3.4.1 Concrete Mixing
2.3.4.2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .