Mobile Home Demolition

Closed Solicitation Posted

Solicitation number
W911YN-26-Q-A024
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238910 Site Preparation Contractors
Place of performance
Jacksonville, Florida 32221, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Florida Army National Guard seeks demolition of one mobile office unit (70 feet × 30 feet) at FMS 11, 9902 Normandy Boulevard, Jacksonville, Florida, with proposals due September 11, 2026, at 5:00 PM local time. This procurement is set aside 100 percent for Women-Owned Small Businesses.

Performance is scheduled October 1 through October 31, 2026. Work includes structural demolition and separation of the unit, debris processing and haul-away to a certified facility, and final site cleanup including sweeping, raking, and removal of remaining materials and fasteners. The concrete slab foundation must remain in place. The Government will disconnect and cap electrical, water, and sewer services prior to contractor mobilization; the contractor is responsible for obtaining a demolition permit from the City of Jacksonville and providing dumpsters, hauling, and tipping fees. All EPA Section 608 refrigerant recovery requirements for HVAC units are the contractor's responsibility. Asbestos abatement, if discovered, will be handled through a separate government modification.

The NAICS code is 238910, Site Preparation Contractors; the PSC code is P400, Salvage – Demolition of Buildings. The small business size standard is 19 million dollars. Award will be made on price alone to the apparent lowest-price quote acceptable to the Performance Work Statement. The Government reserves the right to award without discussion. A non-mandatory site visit is scheduled for September 9, 2026, at 10:00 AM. Contractor personnel require company badges and must comply with CMMC at Final Level 1 (Self-assessment). Electronic invoicing is required through Wide Area Workflow. The Service Contract Act wage determination 2015-4539 (effective May 13, 2026) applies to the contract.

Notice text

2 versions

Update #2 · Latest ·

***SEE ATTACHED Q&A SET AS OF 09 SEP 2026***

PERFORMANCE WORK STATEMENT 
Mobile Office Demolition 

1.0 Objective
The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals.
 

2.0 Scope of Work
This project will be executed in three (3) distinct phases:

Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel.

Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility.

Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition.
 

3.0 Completion Standard
The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear.
 

4.0 Details
      Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
      Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB)

      Site POC: CW2 Merrill, Andrew
                       (904) 682-6215 ext. 1150
                       andrew.d.merrill2.mil@army.mil

Site Visit
Date: 09 September 2026
Time: 10:00 AM
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
POC: Andrew Merrill (CW2)
           andrew.d.merrill2.mil@army.mil
           (904) 682-6215 ext. 1150

          Robert Glanowski (Contract Specialist)
            robert.j.glanowski.civ@army.mil
            (904) 823-0555

***Attendance is not required and will not prohibit quote submissions.***

Update #1 ·

PERFORMANCE WORK STATEMENT 
Mobile Office Demolition 

1.0 Objective
The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals.
 

2.0 Scope of Work
This project will be executed in three (3) distinct phases:

Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel.

Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility.

Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition.
 

3.0 Completion Standard
The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear.
 

4.0 Details
      Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
      Dimensions: 70 ft x 30 ft (2310-01-C03-6479, MOBILE HOME: 10834-AB)

      Site POC: CW2 Merrill, Andrew
                       (904) 682-6215 ext. 1150
                       andrew.d.merrill2.mil@army.mil

Site Visit
Date: 09 September 2026
Time: 10:00 AM
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
POC: Andrew Merrill (CW2)
           andrew.d.merrill2.mil@army.mil
           (904) 682-6215 ext. 1150

          Robert Glanowski (Contract Specialist)
            robert.j.glanowski.civ@army.mil
            (904) 823-0555

***Attendance is not required and will not prohibit quote submissions.***

Files

File Type Posted
Q and A.pdf PDF
PWS_Demo.pdf PDF
SCA Wage Determination_2015-4539.pdf PDF