PWS_Demo.pdf
PDF 3 MB Posted
- Attached to
- Mobile Home Demolition
- Solicitation number
- W911YN-26-Q-A024
About this file
This is a Performance Work Statement for the demolition of a mobile office unit located at FMS 11, 9902 Normandy Boulevard, Jacksonville, Florida 32221. The mobile office measures 70 feet by 30 feet (NSN 2310-01-C03-6479, MOBILE HOME: 10834-AB).
The project encompasses three distinct phases: Phase 1 involves the structural demolition and separation of the mobile office unit through systematic dismantling and careful component separation using appropriate tools and equipment while mitigating risk to surrounding property and personnel. Phase 2 requires debris processing and haul-away, including the collection and loading of all demolition debris and rubble into a designated roll-off dumpster, the cutting of the steel trailer frame into smaller manageable sections, and the transportation of all materials to a certified facility for proper disposal and/or recycling. Phase 3 consists of final site cleanup involving sweeping, raking, and removal of any remaining project-related materials, fasteners, or fragments to leave the work area in a clean, orderly, and hazard-free condition. The project is considered complete upon full demolition of the unit, removal of all associated materials and debris from the premises, and achievement of a clean and clear immediate work area. A non-mandatory site visit is scheduled for September 9, 2026, at 10:00 AM. The primary point of contact is CW2 Merrill, Andrew at (904) 682-6215 ext. 1150, with Contract Specialist Robert Glanowski available at (904) 823-0555.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q and A.pdf | ||
| SCA Wage Determination_2015-4539.pdf | ||
| Solicitation - W911YN26QA024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
Mobile Office Demolition
1.0 Objective
The primary objective of this project is to safely and completely demolish one specified unit, process and remove all materials and debris from the site, and install safety cones, caution tape and decals.
2.0 Scope of Work
This project will be executed in three (3) distinct phases:
Phase 1: Structural Demolition and Separation Systematically dismantle and demolish one (1) unit located on the property. Work includes structural tear down and careful separation of components. All necessary tools and equipment will be utilized to safely deconstruct the units in a controlled manner, mitigating risk to surrounding property and personnel.
Phase 2: Debris Processing and Haul-Away All debris, rubble, and waste generated from the demolition of both units will be collected and loaded into a designated roll-off dumpster. The steel trailer frame will be methodically cut into smaller, manageable sections suitable for safe handling and transport. Once loaded, the dumpster containing all general demolition debris and the prepared steel sections will be hauled away from the property for proper disposal and/or recycling at a certified facility.
Phase 3: Final Site Cleanup Upon removal of all large debris, a comprehensive cleanup of the entire work area will be performed. This includes sweeping, raking, and removing any remaining project-related materials, fasteners, or fragments. The goal is to leave the site in a clean, orderly, and hazard-free condition.
3.0 Completion Standard
The project will be considered complete when the unit is fully demolished, all associated materials and debris have been removed from the premises, and the immediate work area is clean and clear.
4.0 Details
Location: FMS 11 9902 Normandy Blvd Jacksonville, FL 32221
Mobile Office Dimensions: 70 ft x 30 ft
(2310-01-C03-6479, MOBILE HOME: 10834-AB)
SITE POC: CW2 Merrill, Andrew
(904) 682-6215 ext. 1150 andrew.d.merrill2.mil@army.mil
SITE VISIT
Date: 09 September 2026
Time: 10:00 AM
Location: FMS 11, 9902 Normandy Blvd, Jacksonville, FL 32221
POC: Andrew Merrill (CW2) andrew.d.merrill2.mil@army.mil
(904) 682-6215 ext. 1150
Robert Glanowski (Contract Specialist) robert.j.glanowski.civ@army.mil
(904) 823-0555
***Attendance is not required and will not prohibit quote submissions.***
File details come from the government source that posted it. Updated .