MKG and GRR TRACON Realignment and Refurbishment
Closed Solicitation Posted
- Solicitation number
- 697DCK-24-R-00243
- Agency
- Southwestern Region Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Grand Rapids, Michigan, United States
- Points of contact
-
- Stevie Tabb stevie.ctr.tabb@faa.gov
- Joni Haynes joni.l.haynes@faa.gov (405) 954-7716
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Transportation Federal Aviation Administration Southwestern Region is seeking contractors to realign and refurbish the Terminal Radar Approach Control (TRACON) facilities at the Muskegon County Airport (MKG) in Muskegon, Michigan and the Gerald R. Ford International Airport (GRR) in Grand Rapids, Michigan. The scope of work includes the removal of existing obsolete consoles, carpets, ceilings, and other equipment, followed by the installation of new partitions, carpets, ceilings, HVAC, and electrical systems as detailed in the drawings and specifications. Proposals are due by May 15, 2024, and the period of performance is from June 1, 2024 to June 2, 2025.
This is a total small business set-aside contract under NAICS code 236220, with an estimated magnitude between $1,000,000 and $2,000,000. Contractors will be required to provide performance and payment bonds. Prevailing wage rates for the project have been established by the Department of Labor for Muskegon and Kent Counties in Michigan. The work must be performed at the MKG and GRR airport locations.
Notice text
3 versions
Update #3 · Latest ·
This requirement is for MKG and GRR TRACON realignment and replacement at the Muskegon County Airport
(MKG) located in Muskegon, Michigan and the Gerald R. Ford International Airport (GRR) located in Grand
Rapids, Michigan. The scope of work includes, but is not limited to, removal of existing obsolete consoles, carpets,
ceilings and other work; providing partitions, carpets, ceilings and other work; providing HVAC and electrical work
as specified in drawings and specifications. See specifications and drawing in Section J for complete scope of work.
*************************************************************************
Amendment 0001 is to incorporate the Question and Answer (Q&A) document and Site Visit sign-in sheets for both facilities as described below:
FIRST: The following attachments are hereby released to interested parties as described below:
1. J-6_ Contractor Sign-in sheet-1
2. J-6A_ Contractor Sign-in Sheet-2
3. J-7 Q&A for GRR & MKG
Second: The due date for proposals remains the same.
Third: All other terms and conditions remain unchanged and in full effect.
*************************************************************************
Amendment 0002 is to delete Selective Demolition Section 1.6D from the specifications and update the due date of the proposals as described in the following:
FIRST: An additional question was received after the Q&A session had ended. That question is the following:
• Line D.1 in section 1.6 “Field Conditions,” on pg. 16 of the solicitation states: “Hazardous materials will be removed by Owner before start of the Work.” However, the plans show areas where asbestos containing materials are to be removed so I just
wanted to check and see if we are to follow the solicitation and assume that any asbestos containing materials and other hazardous materials will be removed by the owner or if we are responsible for performing this work.
Based on this question, section 02 41 19 Selective Demolition Section 1.6D is hereby deleted from the specifications as the contractor will be responsible for the removal of hazardous materials identified in the specifications. Updated Specifications are hereby included in this amendment reflecting these changes.
*******************************
SECOND: Due to "FIRST" above, additional time to propose is hereby granted. The new proposal date is updated below:
FROM: May 10, 2024, by Noon EST
TO: May 15, 2024, by Noon EST
*******************************
THIRD: All other terms and conditions remain unchanged and in full effect.
Update #2 ·
This requirement is for MKG and GRR TRACON realignment and replacement at the Muskegon County Airport
(MKG) located in Muskegon, Michigan and the Gerald R. Ford International Airport (GRR) located in Grand
Rapids, Michigan. The scope of work includes, but is not limited to, removal of existing obsolete consoles, carpets,
ceilings and other work; providing partitions, carpets, ceilings and other work; providing HVAC and electrical work
as specified in drawings and specifications. See specifications and drawing in Section J for complete scope of work.
*************************************************************************
Amendment 0001 is to incorporate the Question and Answer (Q&A) document and Site Visit sign-in sheets for both facilities as described below:
FIRST: The following attachments are hereby released to interested parties as described below:
1. J-6_ Contractor Sign-in sheet-1
2. J-6A_ Contractor Sign-in Sheet-2
3. J-7 Q&A for GRR & MKG
Second: The due date for proposals remains the same.
Third: All other terms and conditions remain unchanged and in full effect.
Update #1 ·
This requirement is for MKG and GRR TRACON realignment and replacement at the Muskegon County Airport
(MKG) located in Muskegon, Michigan and the Gerald R. Ford International Airport (GRR) located in Grand
Rapids, Michigan. The scope of work includes, but is not limited to, removal of existing obsolete consoles, carpets,
ceilings and other work; providing partitions, carpets, ceilings and other work; providing HVAC and electrical work
as specified in drawings and specifications. See specifications and drawing in Section J for complete scope of work.
Attachments
| File | Type | Posted |
|---|---|---|
| 697DCK-24-R-00243_Amendment 0002.pdf | ||
| J-2 MKG TRACON SPECSET_Updated 05.09.24.pdf | ||
| J-1 GRR TRACON SPECSET_Updated 05.09.24.pdf | ||
| 697DCK-24-R-00243_Amendment 0001.pdf | ||
| J-7_Questions and Answers for MKG and GRR.pdf | ||
| J-6_Contractor sign in sheet_1.pdf | ||
| J-6A_Contractor sign in sheet_2.pdf | ||
| J-4_ MI20240088 Wage Determination.pdf | ||
| J-3_ MI20240093 Wage Determination.pdf | ||
| J-5 Past Performance Questionnaire.pdf | ||
| J-2 MKG TRACON SPEC.pdf | ||
| 697DCK-24-R-00243_MKG and GRR Solicitation.pdf | ||
| J-2A MKG TRACON DWG.pdf | ||
| J-1A GRR TRACON DWG transmittal.pdf | ||
| J-1 GRR TRACON SPECSET.pdf |
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| MKG and GRR TRACON Realignment and Refurbishment | Solicitation | |
| MKG and GRR TRACON Realignment and Refurbishment | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity