J-1A GRR TRACON DWG transmittal.pdf
PDF 11 MB Posted
- Attached to
- MKG and GRR TRACON Realignment and Refurbishment Federal contract opportunity
- Solicitation number
- 697DCK-24-R-00243
About this file
This document is a drawing transmittal related to Solicitation Number 697DCK-24-R-00243, which is for the realignment and refurbishment of the MKG and GRR TRACON at the Muskegon County Airport and the Gerald R. Ford International Airport. The scope of work includes removal of existing obsolete equipment, and providing new partitions, carpets, ceilings, HVAC, and electrical work as specified in the drawings and specifications. This is a Department of Transportation Federal Aviation Administration Southwestern Region contract opportunity.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| J-2 MKG TRACON SPECSET_Updated 05.09.24.pdf | ||
| J-1 GRR TRACON SPECSET_Updated 05.09.24.pdf | ||
| 697DCK-24-R-00243_Amendment 0002.pdf | ||
| J-7_Questions and Answers for MKG and GRR.pdf | ||
| J-6_Contractor sign in sheet_1.pdf | ||
| J-6A_Contractor sign in sheet_2.pdf | ||
| 697DCK-24-R-00243_Amendment 0001.pdf | ||
| J-3_ MI20240093 Wage Determination.pdf | ||
| J-4_ MI20240088 Wage Determination.pdf | ||
| J-2A MKG TRACON DWG.pdf | ||
| J-1 GRR TRACON SPECSET.pdf | ||
| J-5 Past Performance Questionnaire.pdf | ||
| J-2 MKG TRACON SPEC.pdf | ||
| 697DCK-24-R-00243_MKG and GRR Solicitation.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
1/0 GND IN 3"C)
3 SETS (4-300 KCMIL &
DISTRIBUTION PANEL
BUILDING
& 1 AWG GND IN 3"C)
2 SETS (3-350KCMIL
GRR
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
8 1234567
DRAWING NO
DESIGNED
REVIEWED BY
/1
/2
:4
:0
P
M lo tt e d b y S
R V
-C
-E
O
APPROVED
g rr -1
-e
.d w
8 234567
100A200A100A225A225A225A100A225A
& 1/0 GND IN 3"C)
3 SETS (4-300KCMIL
600A
100A100A100A100A100A100A 100A
400A
100A
BYPASS/ISOLATION SWITCH
800A TRANSFER SWITCH AND
ASCO 7000 AUTOMATIC
IS
BP
N
ISIS
BP
L E
ATS
CHARGER
BATTERY
GM199989-KP-C275
175KW AVTRON
LOAD BANK
BREAKER
KOHLER 600AHANDLE
BYPASS
HANDLE
ISOLATION
600A
DISCONNECT SW
LINE BREAKER
KOHLER 800A
3 SETS (4-300KCMIL
ENGINE GENERATOR
175KW DIESEL
20206TH FLOOR EH-4 & OUTLET 803, 804, ELEV EQUIP RM
OUTLETS
20 20 DRINKING FOUNTAIN
225A
DUMB WAITER
HUMIDIFIER
FCU-1
809 FAN COIL UNIT FC-9
LIGHTS 803
SPARE
OUTLETS SMOKE RM
OUTLETS 803, 804
WEATHER RM VAV
UNIT FC-10
810 FAN COIL
OUTLETS 803
RM 605 LIGHTS CONF RM
AHU-2
WATER HEATER HWN-2
6TH FLOOR WATER COOLER
OUTLET 702
RM 605 LIGHTS OFFICE B
RM 605 LIGHTS OFFICE A
601, 606, 609 & 704
OUTLET & LIGHTS
RM 605 RECPT OFFICE B
RM 605 RECPT OFFICE A
RM 605 RECPT CONF RM
CONF RM
RM 605 MICROWAVE OUTLET
21874391065
PNL TR
PNL G PNL F PNL A PNL E PNL B PNL T PNL D
PNL F1 PNL A1
6TH FLOOR
E/G ROOM RM 404 CAB
ELEVATOR
RM 707 RM 707 5TH FLOOR
PNL D1
5TH FLOOR8TH FLOOR
(TELCO CLOSET)
RM 405
SPARE SPARE
200A 200A
120/208V,3PH, 4WIRES
DISTRIBUTION PANEL "DLA"
987654321
120/208V,3PH, 4WIRES
DISTRIBUTION PANEL "MLA"
6TH FLOOR
PNL AA
PNL BB PNL ME1 PNL ME2
SPARE SPARE
W
-4
T
K
400A
NOTE 1
RM 605 GFCI RECPT CONF RM
RM 605 RECPT CONF RM
800A FUSES
SWITCH
800A RATED
TO PNL "MLA-1"
NOTE 1, AND 3 NOTE 2
3 SETS (4-300KCMIL FCU-1
7TH. FLOOR
NOTE 1, 3
NEW WORK SHOWN IN DASED RECTANGLE.3.
SCHEDULE LOCATED IN THE BASEMENT.
5 IN PANEL DLA SPARE. AFTER TR PANEL REMOVED UPDATE DLA PANEL
REMOVE POWER PANEL TR LOCATED ON THE 6TH FLOOR AND MAKE BREAKER2.
UPDATE PANEL DIRECTORY "ME 2". REFER TO DRAWING 3/E007.
UPDATE PANEL DIRECTORY IN PANEL AA LOCATED IN ROOM 609.
AFTER TERMINATION BRANCH CIRCUIT TO EXISTING CIRCUIT BREAKERS1.
NOTES
NOT TO SCALE
ONE-LINE POWER DIAGRAM
E006
EXISTING PANEL AA, 225A MCB, 120/208V, 3PH./4W
E006
U
10/20/2023
MGR: ENGINEERING
BLE
GRAND RAPIDS
GRR-1701255-E106
LER
JR
ATCT
REALIGNMENT TRACON
ELECTRICAL ONE LINE DIAGRAM
AND POWER PANEL
TERMINAL
ENGINEERING SERVICES
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
IO
GERALD R. FORD INTERNATIONAL AIRPORT
THIS DRAWING PRODUCED ON THE AGL REGION CAD SYSTEM
PROJECT ENGINEER
1701255
MI
grr-1701255-e106
2023-10-17T09:27:01-0500
DOUGLAS E WEAVER
2023-10-17T06:35:34-0500
CHUNSEI LEE FARREN
:1 lo tt e
LUMINAIRE SCHEDULE
LABEL QTY. MANUFACTURER CATALOG NUMBER DESCRIPTION LAMP VOLTS DRIVER MOUNTING
(17)
(4)
(1)
(4)
LIGHTING
LITHONIA
4000K LEDs
4000K LEDS 120
120 - - -
@ H = 8'-0"
RECESSED
WALL/SURFACE
@ H = 8'-0"
RECESSED
SUSPENDED CEILING
(2)
4000K LEDS 120
LDN6 40/30 LO6
WR LSS EZ1
LDN6 40/30 LO6
WR LSS EZ1
2LIGHTING
EQUIVALENT
EU2C HO OR
OR EQUIVALENT
LHQM LED R HO
LP840 OR EQUIVALENT
2AVL4 30LSE MDR EZ1
TROFFER
2' X 2' REGRESSED
EMERGENCY LIGHT
LED EXIT LIGHT W/
LED EMERGENCY LIGHT
DOWNLIGHT
6" ROUND
DOWNLIGHT
6" ROUND
4000K LEDS
4000K LEDS
WALL/SURFACE
COUNTERTOP
ABOVE
DOWN TO 1%
DIMMING PERFORMANCE
FLICKER-FREE DEEP
SMOOTH AND
DRIVER WITH
0-10V eldoLED
DOWN TO 1%
DIMMING PERFORMANCE
FLICKER-FREE DEEP
SMOOTH AND
DRIVER WITH
0-10V eldoLED
(0-10 VOLT DIMMING)
eldoLED DIMS TO 1%
RED GRN
PNK
VIO
BKL
BKL
LOAD
GRY/PINK*
L N
DETECTION AND DAYLIGHT
DIMMING, OCCUPANCY
SWITCH SENSOR WITH
WH WALLWSXA PDT EZ D
410.69 OF 2020 NEC
OTHERWISE INDICATED PER SECTION
FIXTURE MAY BE PINK OR AS
* 0-10V DIMMING COMMON FROM
BUILDING STRUCTURE
SUPPORT SYSTEM OR
UNISTRUT - TYPE
EXISTING
JUNCTION BOX (TYPICAL)
NEW OR EXISTING
(TYPICAL)
MAXIMUM LENGTH 6 FEET
CONDUIT FIXTURE WHIP
NEW FLEXIBLE METAL
FIXTURE WITH 5 TWISTS AT EACH END
WIRE AT 2 CORNERS OF
NEW GALV 12 GA SUSPENSION
CONDUIT EMT (TYPICAL)
NEW OR EXISTING
FIXTURE (TYPICAL)
NEW RECESSED
LINE, UNGROUNDED CONDUCTOR
S/N
TO PANEL "MLA-5"
LIGHTS RM 703
LIGHTS RM 703
FC-8 & OUTLET
OUTLETS RM 703
AHU-1
19 20
21 22
23 24
25 26
27 28
29 30
FAN COIL-7
RM 703
COUNTERTOP OUTLET
(GFI) RM 703
OUTLET-FRIDGE
AND DIS
MICROWAVE/FIRE
SUPPRESSION
14-18: PCU-1
W 8TH FLOOR
ROOF
26-30: TRACON
DUCT HEATER
EH-5: 7TH FLR LANDING
COOK TOP 703
COOK TOP 703
AHU-1 SMOKE DAMPER
OUTLET
BUG KILLER
OUTLET VENDING MACHINES
CU-1
LED LIGHT FIXTURES.
COMPLETE REQUIREMENTS OF CFR TITLE 47 PART 15 FOR CLASS A AND/OR CLASS B DEVICES FOR 3.
COMPLETE ASSEMBLY.
AND COMPLIANCE WITH LIGHTING CONTROL SYSTEM, PROPER FIT, AND A SECURE AND
(CONSULT WITH LIGHTING MANUFACTURER) PRIOR TO INSTALLATION TO ENSURE COMPATIBILITY
ALL LUMINAIRE BALLASTS, DRIVERS, MOUNTING BRACKETS AND ACCESSORIES MUST BE VERIFIED 2.
RECORD FOR COMPLIANCE AND APPROVAL.
BE SUBMITTED IN ADVANCE TO THE ENGINEER AND WILL BE REVIEWED BY THE ENGINEER OF
LEVEL OF QUALITY, APPEARANCE, AND PERFORMANCE THAT ANY SUBSTITUTED FIXTURES SHALL
THE FIXTURES SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE ON THIS DRAWINGS ESTABLISH A 1.
GENERAL NOTES
PROJECT SPECIFICATIONS AND SEISMIC REQUIREMENTS.
INSTALLATION OF LIGHTING FIXTURES AND SUPPORTS TO MEET2.
CONDUIT RUNS TO A MAXIMUM OF 6 FEET.
BOXES TO SUPPORT NEW LIGHTING LAYOUT AND KEEP FLEXIBLE
PROVIDE NEW CONDUIT AND WIRING FROM EXISTING JUNCTION1.
WALL SWITCH OCCUPANCY SENSOR DETAIL
E007
WALL SWITCH OCCUPANCY SENSOR DETAIL
EXSITING PANEL ME 2, LOCATED ON : 7TH FLOOR
GRR-1701255-E107
LUMINAIRE SCHEDULE, PANEL SCHEDULE, AND
LUMINAIRE DETAILS
grr-1701255-e107
2023-10-17T09:27:19-0500
DOUGLAS E WEAVER
2023-10-17T06:35:48-0500
CHUNSEI LEE FARREN
:5
:3 lo tt e
-f
SCALE: 1/4"=1'-0"
ELEV
HALL
TRACON
WOMEN
IL
IT
Y
L
FIRE ALARM LEGEND
REMOTE ANNUNCIATOR PANEL
RAP
DHO
CONTROL MODULEC
SS
OFFICE
WEATHER
MOUNTED AT 48" AFF
PULL STATION,
MOUNTED AT 90" AFF (15 cd UON)
STROBE,
CEILING MOUNTED PHOTOELECTRIC
SMOKE DETECTOR
(90 dB/15 cd UON)
HORN/STROBE, MOUNTED AT 90" AFF
TRUE
NORTH
LCN MODEL 4410ME DOOR HOLD OPEN DEVICE
ALL MODIFIED WORK IS TO BE RUN CLASS A
MODIFICATION WORK FOR APPRROVAL
CONTRACTOR TO SUBMIT SHOP DRAWINGS SHOWING
BOOK
CABLE
UTILITY
ROOM
HANDICAPPED
WOMEN/
DEBRIEFING
GENERAL NOTES:
EXISTING SIXTH FLOOR PLAN
SCALE: 1/4"=1'-0"
NEW SIXTH FLOOR PLAN
CONSTRUCTION NOTES:
3 CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS
4 REPLACE EXISTING STROBE WITH HORN/STROBE
EXISTING SMOKE DETECTOR TO BE RELOCATED
EXISTING DEVICE TO BE REMOVED
NEW HORN/STROBE (15cd) TO BE INSTALLED
5 EXISTING DEVICE TO REMAIN AS IS
USING TERMINAL STRIPS. LABEL CONDUCTORS
ALL SPLICES TO BE MADE IN 6"X6" TERMINAL BOX
04 4 8
SCALE IN FEET
04 4 8
SCALE IN FEET
OFFICE A OFFICE B
CONFERENCE ROOM
AF
GRR-1701255-F101
BFS
SR
FIRE PROTECTION PLAN
-f grr-1701255-f101
2023-10-17T09:27:45-0500
DOUGLAS E WEAVER
2023-10-17T06:36:05-0500
CHUNSEI LEE FARREN
2023-10-17T06:30:10-0500
CHUNSEI LEE FARREN
2023-10-17T09:22:46-0500
DOUGLAS E WEAVER
lo tt e
-g
SYMBOLS LEGEND
X
AXXX
SECTION VIEW SYMBOL
DESIGNATIONSYMBOL
NUMBER
DETAIL
SHEET
DIRECTION
VIEW
SECTION
ELEVATION VIEW SYMBOL
ELEVATION
DETAIL TITLE1
A100
SCALE:1"=1'-0"
DETAIL NUMBER
DETAIL NAME
SHEET REFERENCE
DETAIL DRAWING SCALE
SCALE: 1" = 1"
1" 2"01"
DRAWING SCALE
DISTANCE
SCALE REFERENCE
BAR SCALE
VIEW SYMBOL
PICTURE OR DRAWING
DRAWING
PICTURE OR
ENLARGED DETAIL LOCATION
INFORMATION
FURTHER
ENLARGED FOR
THAT WILL BE
AREA OF DETAIL
DETAIL NUMBER
REFERENCE
KEYNOTE INDICATOR
DEMOLITION WORK
KEYNOTE
XX
PROVIDE A SMOOTH AND FLUSH TRANSITION.
PREP EXISTING WALLS TO RECEIVE NEW FINISHES AS REQUIRED AND ALIGN ALL NEW WALLS TO EXISTING WALLS TO 6.
ITEMS SALVAGED FOR RE-USE MUST BE CLEANED, STORED AND RE-INSTALLED AS REQUIRED BY NEW WORK.5.
IMMEDIATELY TO THE RESIDENT ENGINEER ATTENTION.
ANY EVIDENCE OF HAZARDOUS MATERIALS (I.E ACM'S) PRIOR TO OR DURING CONSTRUCTION MUST BE BROUGHT 4.
NOTIFY RESIDENT ENGINEER OF ANY DISCREPANCY IN DIMENSIONS PRIOR TO BEGINNING DEMOLITION.
TO ACCOMMODATE NEW WORK. REFER TO NEW CONSTRUCTION PLANS.
ALL DIMENSION ON DEMOLITION PLANS ARE FOR ROUGH OPENINGS TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED 3.
ADJACENT CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.
DAMAGED AND NOT INDICATED TO BE REMOVED WILL BE REPAIRED TO "LIKE NEW" CONDITION AND WILL MATCH EXISTING
PROTECT ALL EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. ANY AREA 2.
DISCARDED.
COORDINATE WITH RESIDENT ENGINEER ALL ITEMS THAT ARE TO BE REMOVED AND RETURNED TO THE OWNER OR 1.
GENERAL DEMOLITION NOTES
XX
KEYNOTE
KEYNOTE INDICATOR
NEW WORK
CONDITIONS WHICH ARE REQUIRED TO MAINTAIN THE ORIGINAL QUALITY OF MATERIALS AND EQUIPMENT.
MATERIAL AND EQUIPMENT MANUFACTURER'S INSTRUCTIONS REGARDING TEMPERATURE LIMITATIONS AND OTHER ENVIRONMENTAL
INCLUDING DAMAGE WHICH MIGHT RESULT FROM INTRUSIONS OF FOREIGN MATTER OR MOISTURE FROM ANY SOURCE. COMPLY WITH
TRANSPORT, DELIVER, HANDLE AND STORE MATERIALS AND EQUIPMENT AT THE JOBSITE IN SUCH A MANNER AS TO PREVENT DAMAGE, 16.
ALL WORK MUST BE PLUMB, SQUARE, LEVEL, IN PROPER ALIGNMENT, AND SECURELY FASTENED.15.
DO NOT ALLOW ADHESIVE ODOR AND OTHER FUMES FROM CONSTRUCTION ACTIVITY TO ENTER HVAC SYSTEM.14.
SATISFACTION OF THE RESIDENT ENGINEER.
NOT INCLUDED IN THE SCOPE OF THIS PROJECT, MUST BE REPAIRED AND CORRECTED AT CONTRACTOR'S EXPENSE AND TO THE
FIREPROOFING ON STRUCTURAL ELEMENTS AND FIRE RATED ASSEMBLIES. ANY DAMAGE TO THE EXISTING BUILDING AND/OR SITE, DISTURBED AREAS TO MATCH ADJACENT MATERIALS AND FINISHES. EXTEND PATCH TO THE NEAREST NATURAL BREAK POINT. REPAIR
PROVIDE PROTECTION FOR ALL EXISTING FINISHES TO REMAIN, AND REPAIR ANY DAMAGE THAT OCCURS. PATCH AND FINISH 13.
RESIDENT ENGINEER PRIOR TO THE COMMENCEMENT OF ANY WORK.
TO DURING THE DEMOLITION AND CONSTRUCTION PHASES. A COPY OF SUCH INSURANCE COVERAGE MUST BE FURNISHED TO THE
ADEQUATELY PROTECT PERSONS AND PROPERTY. COPIES OF ALL APPLICABLE PERMITS MUST BE MAINTAINED ON-SITE AND ADHERED
COST OF PROPER INSURANCE AS REQUIRED BY STATE AND LOCAL LAWS, NATIONAL BUILDING REGULATIONS OR CODES TO
THE CONTRACTOR MUST APPLY FOR AND OBTAIN ALL PERMITS REQUIRED BY REGULATORY AGENCIES. COSTS MUST INCLUDE THE 12.
AREAS CONCEAL PIPING, DUCTWORK WIRING AND CONDUITS.
THAT PIPING, WIRING, DUCTWORK AND CONDUITS ALLOW FOR MAXIMUM ACCESSIBILITY FOR MAINTENANCE AND REPAIRS. IN FINISHED
ESTABLISH ROUTING FOR ELECTRICAL, TELECOMMUNICATION, PLUMBING, MECHANICAL AND SECURITY SYSTEMS AS REQUIRED SO
THE CONTRACTOR MUST COORDINATE THE INSTALLATION OF NEW CONSTRUCTION WITH EXISTING CONSTRUCTION TO REMAIN. 11.
WRITING FOR SERVICE INTERRUPTIONS A MINIMUM OF 14 BUSINESS DAYS PRIOR TO PLANNED INTERRUPTION.
OTHER CHANGE IN OPERATION TO THE SYSTEM. SERVICE OR UTILITY IN QUESTION. THE CONTRACTOR WILL MAKE REQUESTS IN
WORK, CONSULT RESIDENT ENGINEER TO ARRIVE AT A MUTUALLY ACCEPTABLE SCHEDULE FOR THE INTERRUPTION, SWITCH OVER OR
PRIOR TO ANY TEMPORARY INTERRUPTION OF SERVICES DEEMED ABSOLUTELY NECESSARY BY THE CONTRACT TO PERFORM THE 10.
ALL WOOD BLOCKING TO BE FIRE RETARDANT TREATED. 9.
DISCREPANCY IN DIMENSIONS PRIOR TO BEGINNING NEW CONSTRUCTION.
ALL DIMENSIONS ARE FROM FINISHED WALL TO FINISHED WALL, UNLESS OTHERWISE NOTED. NOTIFY RESIDENT ENGINEER OF ANY 8.
SPECIFICATIONS.
PROVIDE AND INSTALL ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S 7.
PROJECT PROPERTY AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL CODES AND REGULATIONS.
REGULAR BASIS. ALL WASTE, DEBRIS, UNUSED MATERIALS AND OTHER UNSATISFACTORY MATERIALS MUST BE REMOVED FROM THE
THE WORK AREA IS TO BE KEPT CLEAN AND ORDERLY AT ALL TIMES. REFUSE AND DEBRIS MUST BE LAWFULLY REMOVED ON A 6.
PHASES OF THE WORK AND WITHIN THE SCOPE OF THE CONTRACT DOCUMENTS.
REGULATIONS. CONTRACTOR WILL OBTAIN AND BE RESPONSIBLE FOR ALL FEES AND PERMITS REQUIRED AND ASSOCIATED WITH ALL
ALL WORK PERFORMED BY THE CONTRACTOR MUST BE DONE IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND 5.
DETERMINED BY THE CONTRACTING OFFICER) MUST BE FURNISHED.
DETERMINED BY THE CONTRACTING OFFICER) MUST GOVERN, AND THE GREATER QUANTITY AND THE HIGHER QUALITY ( AS
IN CASE OF CONFLICT BETWEEN OR WITHIN THE VARIOUS CONTRACT DOCUMENTS, THE MORE STRINGENT REQUIREMENTS (AS 4.
AREAS OF CONSTRUCTION.
FOR PROTECTION AND SAFETY OF TENANTS AND GENERAL PUBLIC. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE THE
ERECT AND MAINTAIN BARRICADES, DANGER SIGNALS AND MAINTAIN BARRICADES, DANGER SIGNALS AND SIGNS IN AREAS OF WORK
MAINTAIN ALL BUILDING LIFE SAFETY, FIRE PROTECTION AND SECURITY SYSTEMS AT ALL TIMES. DO NOT BLOCK EXITS. PROVIDE, 3.
AREAS OF THE PROJECT SITE TO EMERGENCY AND SECURITY VEHICLES AT ALL TIMES AND WITHOUT DELAY DURING CONSTRUCTION.
CONTRACTOR MUST MAINTAIN ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL
ACCESS MUST BE MAINTAINED DURING THE DEMOLITION AND CONSTRUCTION PHASES OF THIS PROJECT, IN ADDITION, THE
THE CONTRACTOR MUST VERIFY AND COORDINATE ALL SITE AND BUILDING ACCESS WITH THE RESIDENT ENGINEER. LOCAL TRAFFIC 2.
THE WORK. ALLOW TIME FOR PROBLEM RESOLUTION WITHOUT DELAYING THE WORK.
RESIDENT ENGINEER OF ANY CONFLICTS BETWEEN FIELD CONDITIONS AND DRAWINGS PRIOR TO PROCEEDING WITH ANY PORTION OF
THE CONTRACTOR MUST VERIFY AND COORDINATE THE SCOPE OF WORK WITH EXISTING SITE AND BUILDING CONDITIONS. NOTIFY 1.
GENERAL ARCHITECTURAL NOTES:
DWG. NO. REV. DATE DESCRIPTION
GENERAL
MECHANICAL
ARCHITECTURAL
PLUMBING
ELECTRICAL
GRR-1701255-G102
GRR-1701255-G101
GRR-1701255-A107
GRR-1701255-A106
GRR-1701255-A105
GRR-1701255-A104
GRR-1701255-A103
GRR-1701255-A102
GRR-1701255-A101
GRR-1701255-M119
GRR-1701255-M118
GRR-1701255-M117
GRR-1701255-M116
GRR-1701255-M115
GRR-1701255-M114
GRR-1701255-P102
GRR-1701255-P101
GRR-1701255-E107
GRR-1701255-E106
GRR-1701255-E105
GRR-1701255-E104
GRR-1701255-E103
GRR-1701255-E102
GRR-1701255-E101
SYMBOLS AND NOTES DRAWING INDEX
COVER SHEET AND
WALL TYPES
DOOR SCHEDULE AND DETAILS
CABINET DETAILS
6TH FLOOR PLAN RCP PLAN
6TH FLOOR PLAN, EXISTING AND NEW WORK
5TH FLOOR PLAN, EXISTING AND NEW WORK
3RD FLOOR PLAN, EXISTING AND NEW WORK
MECHANICAL CONTROLS SEQUENCE OF OPERATIONS
MECHANICAL DETAILS
MECHANICAL EIGHTH FLOOR PLAN DEMOLITION/NEW CONSTRUCTION
MECHANICAL SEVENTH FLOOR PLAN DEMOLITION/NEW CONSTRUCTION
MECHANICAL SIXTH FLOOR PLAN DEMOLITION/NEW CONSTRUCTION
MECHANICAL LEGEND, NOTES AND SCHEDULES
PLUMBING SIXTH FLOOR PLAN DEMO/NEW CONSTRUCTION
PLUMBING LEGEND, NOTES AND SCHEDULES
LUMINAIRE SCHEDULE, PANEL SCHEDULE AND LUMINAIRE DETAILS
ELECTRICAL ONE LINE DIAGRAM AND POWER PANEL
POWER PLAN 8TH FLOOR BASE BUILDING
POWER PLAN 7TH FLOOR BASE BUILDING
LIGHTING AND POWER PLAN 6TH FLOOR
ELECTRICAL DEMOLITION PLAN 6TH FLOOR
ELECTRICAL LEGEND AND ABBREVIATIONS
FIRE PROTECTION
GRR-1701255-F102
GRR-1701255-F101
FIRE PROTECTION SPECS
FIRE PROTECTION PLAN
DRAWING INDEX
GRR-1701255-G102
JJ
SYMBOLS AND NOTES AND DRAWING INDEX
-g grr-1701255-g102
2023-10-17T09:23:10-0500
DOUGLAS E WEAVER
2023-10-17T06:30:32-0500
CHUNSEI LEE FARREN
BLADESMANUFACTURER MODEL # LINKAGE
DAMPER SCHEDULE
SIZE (WxH)
4. FACTORY PROVIDED THERMOSTAT TRANSFORMER
3. AUTOMATIC CHANGEOVER BETWEEN HEATING & COOLING
2. YOUNG DIGITAL THERMOSTAT
1. FACTORY INSTALLED ELECTRIC ACTUATOR
REMARKS
REMARKSTYPE
MD-1 YOUNG REGULATOR ROUNDMODULATING2075 EXPOSED 1,2,3,4
FSD RUSKIN 14"x10" OPPOSEDFIRE/SMOKEFSD36 CONCEALED 5,6,7,8
AREA SERVED
VOLTAGE
BASIS OF DESIGN INDOOR UNIT
EER COOLING (BTUH)
WEIGHT (LBS)
INDOOR UNIT PART# OUTDOOR UNIT PART#
VERTICAL SPLIT SYSTEM SCHEDULE
MFGR
OUTDOOR UNIT
VOLTAGESENSIBLE (BTUH) ELEC HEAT (kW)EXT SP (IN WC) INDOOR OUTDOORMOCP (A)MCA (A)SIZE (TONS)MOCP (A)MCA (A)OA (CFM)SA (CFM)
CONDENSATE DRAIN TRAP WITH SHUTOFF SWITCH & ALARM5.
CONTRACTOR TO FIELD ADJUST DRAIN PAN CONNECTION SIDE4.
FACTORY INSTALLED HAIL GUARD3.
CONTRACTOR
EXTERNAL DISCONNECT SWITCH PROVIDED BY ELECTRICAL 2.
R-410A REFRIGERANT1.
ENTERING DB/WB LEAVING DB/WB
208/3/60TRANE 14 21,100110AHU-1/CU-1 OFFICE A/B & CONF RM GAF2A0A36M31 4TTA4036A3 208/3/60 12 20930 27,600 81.0" 40 40 98 156378.0/65.2 56.2/55.0
SIZE REFRIGERANT LINES PER MANUFACTURER'S INSTALLATION MANUAL FOR ACTUAL PIPING LIFT AND LENGTH.10.
RUBBER ISOLATOR KIT9.
BOTTOM RETURN FILTER BOX8.
UPFLOW CONFIGURATION7.
HIGH EFFICIENCY ECM MOTOR6.
1 THRU 9
UP
DN
MECHANICAL LEGEND
THERMOSTAT
EQUIPMENT IDENTIFICATION TAG
DEVICE TYPE/AIRFLOW/NECK SIZE
SA
8"Ø
AIRFLOW DIRECTION
FLEX DUCT
MANUAL VOLUME DAMPER
2'x2' SUPPLY DIFFUSER
2'x2' RETURN GRILLE
SUPPLY DUCT UP
SUPPLY DUCT DOWN
RETURN DUCT UP
RETURN DUCT DOWN
ABOVE/THRU ROOF ABOVE
SUPPLY DUCT UP TO FLOOR
ABOVE/THRU ROOF ABOVE
RETURN DUCT UP TO FLOOR
LONG RADIUS ELBOW
45 DEGREE ENTRY
SQUARE THROAT ELBOW
MITERED OFFSET
MODULATING DAMPER
MECHANICAL ABBREVIATIONS
BMS
CWR
CWS
CLG
CU
ESP
EWT
FCU
FLA
GPM
HWR
HWS
BUILDING MANAGEMENT SYSTEM
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CEILING
CONDENSING UNIT
DEGREES FARIENHEIT
EXTERNAL STATIC PRESSURE
ENTERING WATER TEMPERATURE
FANCOIL UNIT
FULL LOAD AMPS
GALLONS PER MINUTE
MCA
MOCP
OA
RA
REF
VAV
ABV ABOVE
AP ACCESS PANEL
BLW BELOW
CD CONDENSATE DRAIN
CONT CONTINUATION
CONN CONNECT
DEG F
DN DOWN
DWG DRAWING
(E) EXISTING
(ETR) EXISTING TO REMAIN
EXISTING TO BE REMOVED(ETBR)
FLR
TYP
EER ENERGY EFFICIENCY RATIO
kW
MIN
W/
COORDINATECOORD
FLOOR
T-STAT
IN WC
HOT WATER RETURN
HOT WATER SUPPLY
MINIMUM CIRCUIT AMPS
MAX OVER CURRENT PROTECTION
OUTSIDE AIR
RETURN AIR
REFRIGERANT
SUPPLY AIR
THERMOSTAT
TYPICAL
VOLTS
VARIABLE AIR FLOW
H20 INCHES WATER PRESSURE
KILOWATT
MINIMUM
WITH
SUBCONTRACTOR.
ALL DAMPER OPERATORS MUST BE LOW VOLTAGE. ALL WIRING SHALL BE BY THE MECHANICAL 17.
FIRE/SMOKE DAMPER.
DUCT PENETRATIONS THRU FIRE/SMOKE RATED ASSEMBLIES MUST BE PROVIDED WITH A UL RATED 16.
SCHEDULE.
ALL DIFFUSERS, GRILLES, AND REGISTERS MUST BE IN ACCORDANCE WITH THE DIFFUSER/GRILLE/REGISTER 15.
OF THE FLEXIBLE DUCT.
DIFFUSERS, GRILLES, AND REGISTERS CONNECTED TO FLEXIBLE DUCT MUST BE SUPPORTED INDEPENDENTLY 14.
STAINLESS STEEL BANDS MUST BE USED FOR FLEXIBLE DUCT CONNECTIONS.13.
SUPPORT ALL FLEXIBLE DUCTWORK AT AN INTERVAL NOT LESS THAN 5'-0" ON CENTER.12.
PULL FLEXIBLE DUCTWORK TAUGHT AND INSTALL AS STRAIGHT AS POSSIBLE.11.
TRIM FLEXIBLE DUCTWORK RUNS TO THE MINIMUM LENGTH NECESSARY TO MAKE CONNECTION.10.
FLEXIBLE DUCTWORK RUNS MUST NOT EXCEED 6'-0" IN LENGTH.9.
THE USE OF DOVETAIL AND/OR SEAL TIGHT FACE MOUNTED TAP-INS ARE NOT ACCEPTABLE.8.
DO NOT CONSTRUCT OR INSTALL TAPS OUT OF REDUCERS, TEES, AND/OR ELBOWS.7.
VOLUME DAMPERS MUST BE PROVIDED AT EACH TAKE OFF.6.
ALL SUPPLY, OUTSIDE, AND RETURN AIR DUCTWORK MUST BE INSULATED.5.
ELEVATIONS WITH ALL OTHER TRADES AND EXISTING CONDITIONS.
INSTALL DUCTWORK AS HIGH AS POSSIBLE, UNLESS INDICATED OTHERWISE. COORDINATE DUCTWORK 4.
REQUIREMENTS.
ALL DUCTWORK IS SHOWN AS FREE AREA INSIDE DIMENSIONS, REFER TO SPECIFICATIONS FOR INSULATION 3.
ALL SUPPLY AIR DUCTWORK MUST BE RECTANGULAR, UNLESS INDICATED OTHERWISE.2.
ALL APPLICABLE SMACNA STANDARDS.
ALL DUCTWORK MUST BE CONSTRUCTED, INSTALLED, AND SUPPORTED PER THE MOST RECENT EDITION OF 1.
MECHANICAL DUCTWORK NOTES:
DAYS IN ADVANCE OF ANY AND ALL UTILITY/SYSTEM SHUTDOWNS.
SUBCONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE RESIDENT ENGINEER, IN WRITING, 10 WORKING 5.
SHALL NOTIFY THE RESIDENT ENGINEER PRIOR TO PROCEEDING WITH DEMOLITION.
WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE SUBCONTRACTOR 4.
EQUIPMENT INDICATED TO REMAIN.
DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR 3.
NEW CONSTRUCTION.
PIPING, ETC THAT MIGHT REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR INSTALLATION OF
LIMITED TO: REMOVAL OF EQUIPMENT, DUCTWORK, CEILING DEVICES, DAMPERS, CONTROLS, VALVES, RELATED
NEW AND RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLY NOTED. THIS SHALL INCLUDE BUT NOT
MECHANICAL SUBCONTRACTOR SHALL PROVIDE ALL DEMOLITION WORK INCIDENTAL TO OR REQUIRED FOR
SPECIFIC DEMOLITION NOTES ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN THEMSELVES. THE 2.
CONDITIONS SHALL BE REPORTED TO THE RESIDENT ENGINEER PRIOR TO STARTING DEMOLITION WORK.
EXISTING PIPING, ETC. ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND VERIFIED FIELD
EQUIPMENT, THE EXACT SIZES AND ROUTING OF EXISTING DUCTWORK, THE EXACT SIZES AND ROUTING OF
BEFORE DEMOLITION WORK BEGINS THE SUBCONTRACTOR SHALL VERIFY THE CONDITION OF ALL EXISTING 1.
MECHANICAL DEMOLITION NOTES:
GRAND RAPIDS, MI
COOLING PER ASHRAE 0.4%
89.2 DEG F 73.1 DEG F
DRY BULB WET BULB ASHRAE 99.6%
HEATING PER
2.8 DEG F 75 DEG F
COOLING HEATING
DESIGN SETPOINTS
70 DEG F
LOUVER
UP ELBOW
DOWN ELBOW
SHUTOFF VALVE
BREAK
FSD
FIRE/SMOKE DAMPER
RECTANGLE TO ROUND TRANSITION
AHU AIR HANDLING UNIT
MEET ALL OTHER TRADE CLEARANCE REQUIREMENTS.
STRUCTURAL, CIVIL, AND GENERAL ARCHITECTURE. THIS MUST INCLUDE PROVIDING SUFFICIENT SPACE TO
OTHER TRADES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL, PLUMBING, FIRE PROTECTION, TELECOM, IT WILL BE THE RESPONSIBILITY OF THIS SUBCONTRACTOR TO COORDINATE THEIR WORK WITH THAT OF ALL 17.
VOLTAGES SHOWN HEREIN.
MECHANICAL EQUIPMENT WITH THE ELECTRICAL DRAWINGS AND MUST FURNISH EQUIPMENT WIRED FOR THE
SUBCONTRACTOR MUST COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL 16.
A DIELECTRIC UNION MUST BE USED TO JOIN ANY DISSIMILAR MATERIALS.15.
AND ASSOCIATED COMPONENTS AND ACCESSORIES IS PROHIBITED.
FIRST QUALITY. UNLESS INDICATED OTHERWISE, THE REUSE OF EXISTING DEVICES, MATERIALS, EQUIPMENT
ALL EQUIPMENT, DUCTWORK, DEVICES, DAMPERS, CONTROLS, VALVES, PIPING, INSULATION, ETC MUST BE 14.
SUBCONTRACTOR MUST NOTIFY THE ENGINEER PRIOR TO STARTING WORK.
CONFLICT EXISTS BETWEEN THE DESIGN DOCUMENTS AND MANUFACTURER'S REQUIREMENTS, THIS
PRIOR TO STARTING WORK. ALL WORK MUST ADHERE TO THE MANUFACTURERS' REQUIREMENTS. IF A
REVIEW ALL APPLICABLE MANUFACTURERS' INSTALLATION AND MAINTENANCE DOCUMENTS/REQUIREMENTS 13.
PRODUCT INSTALLATION MUST ADHERE TO MANUFACTURER'S RECOMMENDATIONS.12.
OF RECORD FOR APPROVAL.
PERFORMANCE AND MATERIALS. SUBMIT LITERATURE FOR ALL EQUIPMENT AND MATERIALS TO THE ENGINEER
MANUFACTURER'S MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR 11.
COMPLETE INSTALLATION.
FURNISH ANY MISCELLANEOUS ITEMS NORMALLY USED, SPECIFICALLY MENTIONED OR NOT, TO RENDER A 10.
MAINTAIN INTEGRITY OF LISTED ASSEMBLY, PROVIDE SLEEVES WHERE REQUIRED.
SEAL ALL EXISTING AND NEW FLOOR/ROOF/WALL PENETRATIONS WITHIN THE SCOPE OF WORK AS REQUIRED TO 9.
EXISTING OR AS REQUIRED BY NEW CONSTRUCTION DRAWINGS.
OPEN EXISTING WALLS AS REQUIRED FOR DEMOLITION AND INSTALLATION WORK. PATCH WALLS TO MATCH 8.
STRUCTURAL ENGINEER'S REVIEW AND APPROVAL.
STRUCTURAL COMPONENTS MUST NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT A 7.
VERIFY SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY DUCTWORK/PIPING.6.
COORDINATION WITH ALL OTHER TRADES.
INCLUDE, BUT NOT BE LIMITED TO, OFFSETTING EXISTING PIPING AND MODIFICATIONS REQUIRED FOR
NECESSARY MODIFICATIONS TO EXISTING CONDITIONS TO PERFORM WORK OF THIS SECTION. THIS MUST
LOCATIONS OF EXISTING SYSTEMS/UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. MAKE ALL
ACCURACY NOR COMPLETION OF LOCATIONS SHOWN ON DRAWINGS IS GUARANTEED. DETERMINE EXACT
ALL EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS. NEITHER 5.
AND MUST BE RESOLVED PRIOR TO THE INSTALLATION OF THE WORK INVOLVED.
ON THE DRAWINGS WHICH IS IN VIOLATION MUST BE BROUGHT TO THE ATTENTION OF THE RESIDENT ENGINEER
NO WORK SHALL BE INSTALLED IN VIOLATION OF ANY GOVERNING STANDARDS AND CODES. ANY WORK SHOWN 4.
LOCAL CODES, RULES AND REGULATIONS. IN CASE OF DIFFERENCES THE MOST STRINGENT MUST GOVERN.
ALL MECHANICAL WORK MUST BE IN ACCORDANCE WITH FAA STANDARDS AND ALL APPLICABLE STATE AND 3.
BECOME THOROUGHLY FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE CONTRACT.
CONNECTING THE APPARATUS, THE MEANS TO BE PROVIDED FOR GETTING THE EQUIPMENT INTO PLACE, AND
PREMISES AND ANY EXISTING WORK. DETERMINE, IN ADVANCE, THE METHODS OF INSTALLING AND
BEFORE SUBMITTING A BID CAREFULLY STUDY THE CONSTRUCTION DOCUMENTS. CAREFULLY EXAMINE THE 2.
MECHANICAL SYSTEM COMPONENTS. DO NOT SCALE THESE DRAWINGS.
THESE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO DEPICT THE GENERAL LOCATION OF 1.
MECHANICAL GENERAL NOTES:
MECHANICAL SUBCONTRACTOR MUST PROVIDE ALL REQUIRED CONTROL WIRING AND CONDUIT.38.
REVIEW.
BALANCE AND OPERATION OF CONTROLS REPORT MUST BE PROVIDED TO THE ENGINEER OF RECORD FOR
MECHANICAL SYSTEMS WITHIN THE SCOPE OF WORK. UPON COMPLETION OF WORK, A WRITTEN TEST &
UPON COMPLETION OF WORK AN INDEPENDENT AND CERTIFIED T&B COMPANY MUST TEST AND BALANCE ALL 37.
SYSTEMS.
INSTALL ALL BALANCING DEVICES NEEDED TO ACHIEVE PROPER ADJUSTING AND BALANCING OF MECHANICAL 36.
DUCT DOWNSTREAM OF THE FINAL FILTERS AND PRIOR TO THE FIRST DUCT BRANCH CONNECTION.
DUCT SMOKE DETECTORS MUST BE LISTED FOR DUCT INSTALLATIONS AND INSTALLED IN THE MAIN SUPPLY 35.
MOUNT THERMOSTATS WHERE INDICATED ON PLANS AT 4'-0" ABOVE FINISH FLOOR UNLESS NOTED OTHERWISE.34.
EXPOSURE TO SUNLIGHT & SUPPLY AIR, & OBSTRUCTIONS THAT CREATE STAGNANT AIR AT THE THERMOSTAT.
LOCATE THERMOSTATS TO AVOID HALLWAYS, WINDOWS, EXTERIOR DOORS, EXTERIOR WALLS, DIRECT 33.
BE PROVIDED WITH A DOWNWARD ARC PRIOR TO ENTERING THE BUILDING.
REFRIGERANT PIPING FOR CONDENSING UNITS LOCATED ABOVE THE FAN COIL UNIT THEY ARE SERVING MUST 32.
REFRIGERANT PIPING MUST BE INSULATED SEPARATELY.31.
ALL EXTERIOR REFRIGERANT PIPING INSULATION MUST BE PROVIDED WITH A PVC COVERING.30.
THICK FOR ALL INTERIOR LOCATIONS.
REFRIGERANT PIPING INSULATION MUST BE CLOSED-CELL AND 1" THICK FOR ALL EXTERIOR LOCATIONS AND 3/4" 29.
DRIER.
ALL REFRIGERANT PIPING MUST BE PROVIDED WITH SERVICE VALVES, SIGHT GLASS, AND LIQUID LINE FILTER 28.
DUCTWORK AND PIPING MUST NOT RUN OVER ELECTRIC PANELS.27.
MUST NOT REST ON CEILING TILES OR CEILING STRUCTURE.
ALL DUCTWORK AND PIPING ABOVE GRADE MUST BE PROPERLY SUPPORTED BY THE BUILDING STRUCTURE AND 26.
ON PIPING.
PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS 25.
ALL CONDENSATE DRAINAGE PIPING LOCATED IN UNCONDITIONED SPACE MUST BE INSULATED.24.
FLOW.
PITCH CONDENSATE RETURN PIPING AT A MINIMUM SLOPE OF 0.4% DOWNWARD IN DIRECTION OF CONDENSATE 23.
ADJACENT WALL OR CEILING. THE TAG MUST BE VISIBLE FROM THE OCCUPIED SPACE.
THE LOCATION OF ALL FIRE, SMOKE, AND BALANCING DAMPERS MUST BE IDENTIFIED BY A TAG AFFIXED TO THE 22.
AND DIRECTION OF FLOW.
THAT ALLOWS FOR EASY IDENTIFICATION. DUCTWORK AND PIPING MUST BE LABELED TO IDENTIFY CONTENTS
ALL EQUIPMENT, DEVICES, DUCTWORK, CONTROLS, PIPING, VALVES, ETC MUST BE IDENTIFIED IN A MANNER 21.
ACCEPTANCE.
UNLESS OTHERWISE NOTED, GUARANTEE ALL PARTS AND LABOR FOR ONE YEAR FROM DATE OF FINAL 20.
AND SELF-CLOSING TYPE.
ACTUATORS, SENSORS, ETC IN CEILINGS AND WALLS. ACCESS PANELS IN RATED ASSEMBLIES MUST BE LISTED
SUBCONTRACTOR MUST PROVIDE ACCESS PANELS WHERE REQUIRED FOR ACCESS TO VALVES, DAMPERS, 19.
WITHOUT ADDITIONAL EXPENSE TO THE FAA/PARSONS.
MAKE ALL NECESSARY DUCTWORK OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES 18.
8. ELECTRIC ACTUATOR AND FUSE LINK
7. FACTORY SLEEVE
6. 1-1/2 HOUR RATING
5. LEAKAGE CLASS 2
AIR DEVICE SCHEDULE
SYMBOLS TYPE MATERIAL FINISH
S-1 SUPPLY DIFFUSER STEEL WHITE
1,2,3
& MODEL #
MANUFACTURER
SIZE
R-1 STEEL WHITE24x24
CEILING MOUNT3.
NC VALUE SHALL NOT EXCEED 30.2.
4-WAY ADJUSTABLE1.
RETURN GRILLE
PRICE #SCD
PRICE #PDDR
24X24
2,3
AREA SERVED
FAN
(LBS)
WEIGHT
ESP (IN WC) GPM
FAN COIL UNIT SCHEDULE
CFM MOCP (A)MCA (A)
ACTUAL FLOW
INDICATED, CONTRACTOR SHALL SIZE CONTROL VALVE FOR
IF ACTUAL WATER FLOW FOR FURNISHED COIL IS LESS THAN 1.
155FCU-1 DEBRIEFING ROOM #602 0.15 12 20 98
SHUTDOWN UPON OVERFLOW
PROVIDE FLOAT SWITCH IN SECONDARY DRAIN PAN FOR UNIT 3.
STAINLESS STEEL IAQ DRAIN PAN2.
1, 2, 3
TYPE
CHILLED/HOT WTR
BASIS OF DESIGN
TRANE FCCB030
MIN OA
FILTERS
2" PLEATED
COOLING COIL
0.75
EWT
EADB
77.3
EAWB
64.8
TOTAL (BTUH)
3,600
SENSIBLE (BTUH)
3,300
PIPE CONN SIZE
WTR PRES DROP
HP
1/4
VOLTAGE
208/60/1
GPM
HEATING COIL
0.22
EWT EADB
66.9
LADB
79.2
CAPACITY (BTUH)
2,200
WTR PRES DROP
BRANCH SIZE
3/8"
ELECTRIC
SYMBOLS
SYMBOLST
ACU
LOCATION
PROJECT DESIGN CONDITIONS
SYMBOLS
lo tt e
-m
GRR-1701255-M114
NAC
AK
MECHANICAL LEGEND, NOTES AND SCHEDULES
grr-1701255-m114
2023-10-17T09:28:11-0500
DOUGLAS E WEAVER
2023-10-17T06:36:22-0500
CHUNSEI LEE FARREN
14X10 RA UP TO FLR ABV
AP FOR ACCESS TO ESD
(ETBR) 36x24 RA GRILLE
RA GRILLE
(ETBR) 36x24
(ETBR) 36x15 RA
UP TO FLR ABV
(ETBR) 28x16 RA
FLEXDUCT (TYP)
(ETBR) SA
(ETBR) 25x8 SA
(ETBR) 12x6 SA
(ETBR) 28x10 SA
(ETBR) 20x8 SA
(ETBR) 18x6 SA
DN FROM FLR ABV
(ETBR) 36x15 SA
:0 lo tt e
D605B
8x6
8x6S-1
R-1
TO CV-3 ON 7TH FLR
(ETR) 3/4" HWS/R W/ CONT
OFFICE A
OFFICE B
ENTRY
605C
605B
605A
605D
S-1
MD-1
MD-1
10x10
14x10 SA DROP FROM FLR ABV
12x10
10"Ø
14x10
16x6
OF CLEAR SPACE (TYP)
COORD W/ DEEP BEAM, 11"
DEBRIEFING ROOM
1" CWS/R & 1" HWS/R(ETR)
2" CWS/R & 1-1/2" HWS/R UP & DN(ETR)
1-1/2" CWS/R & 1-1/4" HWS/R(ETR)CONN TO AHU-1 ON 7TH FLR
FCU
(ETBR) VAV BOX & CONTROL WIRING
(ETBR) SA REGISTER (TYP)
(ETBR) 20x10 SA
14x8 SA
(ETBR)
HWS/R UP & DN
(ETR) 2" CWS/R & 1-1/2"
& 1-1/4" HWS/R
(ETR) 1-1/2" CWS/R
(ETBR) T-STAT
(ETBR) 16" RA FLEXDUCT
(ETR) CWS/R & HWS/R W/ CONT TO FAN COIL ON 7TH FLR (TYP)
(ETR) 1" CWS/R & 1" HWS/RFOR CLARITY)
STAT NOT SHOWN
(ETBR) VAV T-STAT (T-
DIFFUSER (TYP)
(ETBR) SA
(ETR) 1" CWS/R & 3/4" HWS/R UP TO AHU ON 7TH FLR
(ETR) 3/4" HWS/R W/ CONT TO CV-3 ON 7TH FLR
OF CLEAR SPACE (TYP)
COORD W/ DEEP BEAM, 11"
WOMEN/ HANDICAPPED
04/20/2023
GRR-1701255-M115
MECHANICAL SIXTH FLOOR PLAN -
DEMOLITION/NEW CONSTRUCTION
SCALE: 1/4" = 1'-0"
MECHANICAL SIXTH FLOOR PLAN - NEW CONSTRUCTION
M015
MECHANICAL SIXTH FLOOR PLAN - DEMOLITION
M015
DEMOLITION SHEET NOTES:
DEMOLISHED
FLEX DUCT SHOWN WITHOUT A CONNECTED CEILING DEVICE HAS ALREADY HAD THE DEVICE 3.
SUPPORTED BY IT'S WIRING.
THE WALL THE TRACON ROOM T-STAT WAS MOUNTED TO HAS BEEN DEMOLISHED. THE T-STAT IS 2.
DEMOLITION WITHIN THE SCOPE OF WORK HAS BEEN PARTIALLY COMPLETED1.
NEW CONSTRUCTION SHEET NOTES:
EXISTING, MAINTAIN INTEGRITY OF LISTED ASSEMBLY.
REUSE EXISTING 7TH FLOOR PENETRATIONS. MODIFY/PATCH OPENINGS AS NEEDED TO MATCH 6.
WITH AIR HANDLING UNIT AND FIRE ALARM SYSTEMS.
PROVIDE FIRE/SMOKE DAMPERS AT 7TH FLOOR PENETRATION. INTERLOCK FIRE/SMOKE DAMPERS 5.
FIELD COORDINATE FINAL LOCATION OF ALL THERMOSTATS.4.
REQUIRED.
FCU-609 DUCTWORK SHALL UTILIZE EXISTING OPENINGS IN BLOCK WALL, FIELD MODIFY OPENINGS AS 3.
FAN COIL UNIT 609.
EXTEND 3/4" CHILLED AND HOT WATER PIPING FROM EXISTING 1" CHILLED AND HOT WATER PIPING TO 2.
PLAN FOR ADDITIONAL ROUTING.
NOT ALL CHILLED AND HOT WATER PIPING IS SHOWN FOR CLARITY, REFER TO DEMOLITION FLOOR 1.
DEMOLITION LEGEND:
SYMBOL DESCRIPTION
EXISTING TO REMAIN
EXISTING TO BE REMOVED
DEMO TO THIS POINT
NEW CONSTRUCTION LEGEND:
DESCRIPTIONSYMBOL
NEW CONSTRUCTION
CONNECT TO EXISTING
4' 0 4' 8' grr-1701255-m115
2023-10-17T09:28:32-0500
DOUGLAS E WEAVER
2023-10-17T06:36:36-0500
CHUNSEI LEE FARREN
lo tt e
ROOF DECK
STORAGE
(ETR) AHU-2
(ETR) 1" CWS/R & 3/4" HWS/R UP FROM 6TH FLR
(ETR) AHU-2
(ETR) 1" CWS/R & 3/4" HWS/R UP FROM 6TH FLR
AP FOR ACCESS TO FSD
OA LOUVER
(ETR) 36x34
12x12 OA DROP TO PLENUM
14x10 RA UP TO PLENUM FROM FLR BLW
RA/OA PLENUM
60x22x12H
10x14
TO FLOOR ABOVE
REF PIPING UP
AHU
60/40/3
GRR-1701255-M116
MECHANICAL SEVENTH FLOOR PLAN -
MECHANICAL SEVENTH FLOOR PLAN - DEMOLITION
M016
MECHANICAL SEVENTH FLOOR PLAN - NEW CONSTRUCTION
M016
THE EXISTING CONDENSING UNIT ROOF CURB SUPPORTS ARE TO BE REUSED. 2.
CONTROLS ARE TO BE DISCONNECTED AND REUSED BY THE REPLACEMENT SYSTEM.
THE EXISTING CONDENSING UNIT IS CONNECTED TO THE BUILDING MANAGEMENT SYSTEM. ALL 1.
ALL ADDITIONAL POINTS INDICATED IN SCOPE OF WORK.
ACCESSORIES REQUIRED FOR THE SYSTEM TO MAINTAIN EXISTING MONITORING/ALARM POINTS AND
CONNECT CU-1 TO BUILDING MANAGEMENT SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND 3.
PENETRATIONS TO MAINTAIN INTEGRITY OF LISTED ASSEMBLY.
REUSE EXISTING WALL AND FLOOR PENETRATIONS FOR REFRIGERANT PIPE ROUTING, SEAL 2.
SECURE CONDENSING UNIT TO EXISTING ROOF CURB SUPPORT, MODIFY CURB AS NEEDED.1.
grr-1701255-m116
2023-10-17T09:28:49-0500
DOUGLAS E WEAVER
2023-10-17T06:37:02-0500
CHUNSEI LEE FARREN
ROOF ROOF
(ETBR) REF PIPING RISE FROM FLOOR BELOW
(ETR) PIPE SUPPORT (TYP)
(ETBR) REF PIPING
(ETR) PCU-1
REF PIPING RISE FROM FLOOR BELOW
(ETR) PIPE SUPPORT (TYP)
EXTEND REF PIPING TO CU-1
COORDINATE CONDENSER INSTALLATION WITH ROOF DRAIN IN THIS AREA
(ETR) PCU-1
CU
MACHINE RM
SMOKERS BREAKROOM
NATCA OFFICE
(ETBR) ROOF
MACHINE RM
SMOKERS BREAKROOM
NATCA OFFICE
30/20/3
ME-2, 26/28/30
:2 lo tt e
GRR-1701255-M117
MECHANICAL EIGHTH FLOOR PLAN -
MECHANICAL EIGHTH FLOOR PLAN - DEMOLITION
M017
MECHANICAL EIGHTH FLOOR PLAN - NEW CONSTRUCTION
M017
THE EXISTING CONDENSING UNIT ROOF CURB SUPPORTS ARE TO BE REUSED. 2.
CONTROLS ARE TO BE DISCONNECTED AND REUSED BY THE REPLACEMENT SYSTEM.
THE EXISTING CONDENSING UNIT IS CONNECTED TO THE BUILDING MANAGEMENT SYSTEM. ALL 1.
ALL ADDITIONAL POINTS INDICATED IN SCOPE OF WORK.
ACCESSORIES REQUIRED FOR THE SYSTEM TO MAINTAIN EXISTING MONITORING/ALARM POINTS AND
CONNECT CU-1 TO BUILDING MANAGEMENT SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND 3.
PENETRATIONS TO MAINTAIN INTEGRITY OF LISTED ASSEMBLY.
REUSE EXISTING WALL AND FLOOR PENETRATIONS FOR REFRIGERANT PIPE ROUTING, SEAL 2.
SECURE CONDENSING UNIT TO EXISTING ROOF CURB SUPPORT, MODIFY CURB AS NEEDED.1.
grr-1701255-m117
2023-10-17T09:29:08-0500
DOUGLAS E WEAVER
2023-10-17T06:37:15-0500
CHUNSEI LEE FARREN
"S" SLIP TYPE BREAKAWAY
SLEEVE PER UL LISTING
#10 SHEET METAL SCREWS
SUPPLIED BY DAMPER MANUFACTURER.
PIECE RETAINING ANGLE ALL AROUND
MIN. 1 1/2" X 1 1/2" X 16 GAUGE SINGLE
MIN. TWO PER SIDE @ 12" O.C.
1/4" X 1 1/4" SELF TAPPING SCREWS.
BETWEEN WALL AND DAMPER.
1/8" CLEARANCE PER FOOT OF PERIMETER
ACTUATOR
MOUNTED DAMPER
120V EXTERNALLY
WITH SHEET METAL STRIP
SUPPORT FROM STRUCTURE
WITH VOLUME DAMPER
HIGH EFFICIENCY TAKE-OFF
OUT WITH DUCT WRAP
SHEET METAL RUN
FLEXIBLE DUCT
INSULATED
DUCT WRAP
DIFFUSER NECK
METAL ELBOW AT
PROVIDE 45° SHEET
INSULATION
CEILING WITH
ROUND NECK
WITHIN 5 LINEAR FEET OF DIFFUSER
EXTEND SHEET METAL RUN OUT TO
SUPPLY DUCT
LOW PRESSURE
OR EXHAUST DUCT
MAIN SUPPLY, RETURN
WITH TURNING VANES
RADIUS OR TO BE PROVIDED
ALL ELBOWS ARE TO BE FULL
MANUAL VOLUME DAMPER
AIR DEVICE (TYP.)
RETURN AND EXHAUST
TYPICAL AIR FLOW FOR SUPPLY,
ACCEPTABLE TAPS
USE SPECIFICATIONS FOR
BALANCE VALVE
PRESSURE GAUGE W/COCK TYP
DIAL THERMOMETER TYP
FULL SIZE BYPASS
2-WAY CONTROL VALVE
STRAINER
FLEX CONN (TYP)
DRAIN VALVE
DRAIN PLUG
ADAPTOR
MINIMUM SIZE 3/4"
AIR CONDITIONING UNIT
AIR HANDLING UNIT OR
SECTION
DRAIN PAN
COOLING COIL
SERVICE VALVES
SIGHT GLASS
FILTER DRYER
PENETRATION
SEE PIPE
CURB DETAIL
SEE ROOF
3/4" COND. DR.
REFRIGERANT PIPING
FC
AIR HANDLING UNIT
RETURN AIR PLENUM
FC
R.A.
WALL
THREADED ROD CUT TO LENGTH
CLEVIS TYPE PIPE HANGER
CARRIER PIPE
INSULATION DIAMETER
LENGTH 1.5 TIMES
SHIELD FOR INSULATION -
JACKSHAFT
DUCT
CLEVIS TYPE HANGER
M018
TYPICAL LOW PRESSURE SUPPLY, RETURN, & EXHAUST DUCT
CHILLED AND HOT WATER PIPING
CONDENSATE DRAIN
NOT TO SCALEM018
TYPICAL DIFFUSER CONNECTION
ROOF MOUNTED CONDENSING UNIT
VERTICAL AIR HANDLING UNIT/
PROVIDE ACCESS DOOR MAINTENANCE.5.
PROVIDE RESETTABLE LINK WITH 165 DEGREE RATING.4.
PROVIDE MOTOR ACTUATOR SIZED AND INSTALLED BY DAMPER MANUFACTURER.3.
OF 250 DEGREES, AND MIN. CLASS LEAKAGE.
PROVIDE DAMPER WITH MIN. FIRE RESISTANCE RATING OF 1 1/2 HOURS. TEMPERATURE RATING 2.
PROVIDE 'V' STYLE DAMPER BLADES.1.
NOTES:
DAMPER LINKAGE
DOOR
ACCESS
SEE NOTES.
COMBINATION
OPPOSED BLADE
METAL WITH PLASTIC CABLE TIES
FASTEN FLEXIBLE DUCT TO SHEET
SEE PLANS
SUPPLY
RETURN
MAV
2-WAY OR 3-WAY CONTROL VALVE
COIL
RS
RL
ROOF
SUPPLY AIR
lo tt e
GRR-1701255-M118
MECHANICAL DETAILS
grr-1701255-m118
2023-10-17T09:29:27-0500
DOUGLAS E WEAVER
2023-10-17T06:37:26-0500
CHUNSEI LEE FARREN
FILTER
CCHC
SENSOR
TEMPERATURE
SECONDS (ADJ.), AN ALARM MUST BE SENT TO THE BAS.
IF THE FAN STATUS DOES NOT PROVIDE PROOF OF OPERATION WHEN COMMANDED TO RUN AFTER 30 ·
BAS ALARM:
THE CHILLED WATER VALVE MUST BE COMMANDED CLOSED. ·
THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED OFF.·
UPON A FALL IN SPACE TEMPERATURE TO THE UNOCCUPIED SETPOINT 78F (ADJ.)
MODULATE CHILLED WATER VALVE TO MAINTAIN THE SPACE TEMPERATURE AT UNOCCUPIED SETPOINT. ·
THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED ON. ·
UPON A RISE IN SPACE TEMPERATURE ABOVE THE UNOCCUPIED SETPOINT 78F (ADJ.)
UNOCCUPIED COOLING MODE:
THE HOT WATER VALVE MUST BE COMMANDED CLOSED·
THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED OFF.·
UPON A RISE IN SPACE TEMPERATURE TO THE UNOCCUPIED SETPOINT 66F (ADJ.)
MODULATE HOT WATER VALVE TO MAINTAIN THE SPACE TEMPERATURE AT UNOCCUPIED SETPOINT. ·
THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED ON. ·
UPON A FALL IN SPACE TEMPERATURE BELOW THE UNOCCUPIED SETPOINT 66F (ADJ.)
UNOCCUPIED HEATING MODE:
THE MINIMUM DEADBAND MUST BE 5F (ADJ.).
TEMPERATURE OCCUPIED SETPOINT 75F (ADJ.)
COOLING MODE: THE BAS MUST MODULATE THE CHW CONTROL VALVE TO MAINTAIN THE SPACE
TEMPERATURE OCCUPIED SETPOINT 70F (ADJ.)
HEATING MODE: THE BAS MUST MODULATE THE HW CONTROL VALVE TO MAINTAIN THE SPACE
FAN OPERATION: UPON A CALL FOR HEATING/COOLING, THE FAN MUST BE ENERGIZED.
OCCUPIED MODE:
THROUGH BAS WITH MANUAL OVERRIDE.
FAN COIL UNITS FCU-609 SERVE THE DEBRIEFING ROOM. THE OPERATIONAL MODE MUST BE DETERMINED
GENERAL:
SEQUENCE OF OPERATION:
TAG DESCRIPTION
SPACE TEMPERATURE
SUPPLY AIR TEMPERATURE
SUPPLY FAN START/STOP
SUPPLY FAN STATUS
SUPPLY FAN FAILURE
CHILLED WATER FCV
HOT WATER FCV
AI AO DI DO REMARK
XFILTER
DP
STATUS
START/STOP
ALARM
CC
DX
HEAT
ELECTRIC
EXISTING.
POINT LIST MATCHING
FACILITY TO MONITOR THE
COORDINATE WITH THE 1.
:NOTES
OA
SD
FZ
FREEZESTAT
TEMPERATURE SENSOR
SA SA
RETURN AIR SMOKE DETECTOR
SAT
RAT
MAT
MAO MAO
AI
DO
T AI T AI T AI
DI
STATUS
START/STOP
ALARM
I
SAT
MDO M DO
DRAIN
CONDENSATE
DICD
DRAIN
CONDENSATE
DICD
CONTROL FUNCTION SCHEDULE
FAN COIL UNIT CONTROL DIAGRAM
M019
AIR HANDLER CONTROL DIAGRAM
M019
NC NC
lo tt e
12/08/2022
GRR-1701255-M119
MECHANICAL CONTROLS
SEQUENCE OF OPERATIONS
THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM
grr-1701255-m119
2023-10-17T09:29:47-0500
DOUGLAS E WEAVER
2023-10-17T06:37:45-0500
CHUNSEI LEE FARREN
SYMBOL
TRAPSUPPLY
SIZETYPEMANUFACTURER MANUFACTURER TYPEMODEL FAUCET
C.W H.W.
CARRIER
MOUNTED
WASTE (MIN)
PLUMBING FIXTURE SCHEDULE
FITTINGFIXTURE
McGUIRE N/A N/A
#8912 1-1/2" P-TRAP 1-1/2"1/2" 1/2"P-1
SINK-HAND
ELKAY LUSTERTONE LR1517 8" FAUCET CENTERS
FULLY UNDERCOATED
SELF RIMMING
STAINLESS STEEL
CENTER MOUNTED
MANUALLY OPERATED
5-1/4" RIGID GOOSENECK
CHICAGO- #210-AGN2AE3
#LFH-2165
STRAINER
#151 BASKET
PLUMBING LEGEND & ABBREVIATION
SYMBOL
COLD WATER
HUB DRAIN
PIPE TURNED UP
PIPE TURNED DOWN
CAP ON PIPE
CD
DESCRIPTION ABBREVIATION DESCRIPTION
P-1 FIXTURE IDENTIFICATION
HOT WATER
ABV
BLW
CLG
CONN
CONT
CW
(E)
FLR
(ETBR)
(ETR)
ABOVE
BELOW
CONNECT
CONTINUATION
COLD WATER
DOWN
HW
RUN PIPING CONCEALED AND CLEAR OF CEILING INSERTS, UNLESS SPECIFIED OTHERWISE.32.
PROHIBITED UNLESS OTHERWISE INDICATED.
ALL PIPING MUST BE INSTALLED AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE 31.
PIPING MUST NOT RUN OVER ELECTRIC PANELS.30.
AIR ADMITTANCE VALVES MUST BE INSTALLED IN A VERTICAL ORIENTATION.29.
HORIZONTAL BRANCH DRAIN.
AIR ADMITTANCE VALVES MUST BE LOCATED IN AN ACCESSIBLE LOCATION A MINIMUM OF 4" ABOVE THE 28.
ON CEILING TILES OR CEILING STRUCTURE.
ALL PIPING ABOVE GRADE MUST BE PROPERLY SUPPORTED BY THE BUILDING STRUCTURE AND MUST NOT REST 27.
ON PIPING.
PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS 26.
ALL PIPE PENETRATIONS BELOW SINKS MUST BE SEALED.25.
THOUGH ALL BRANCH MAINS, ELBOWS AND CONNECTIONS ARE NOT SHOWN.
MAKE PROPER WASTE, VENT, HOT AND COLD WATER CONNECTIONS TO ALL FIXTURES AND EQUIPMENT, EVEN 24.
DISCHARGE FROM AN ICEMAKER OR CONDENSATE MUST BE INSULATED.
ALL HORIZONTAL DRAINAGE PIPING AND TRAPS FROM AN OPEN SIGHT DRAIN OR RECEPTOR RECEIVING 23.
SERVICING AND/OR REMOVAL WITHOUT DISCONNECTING ALL PIPING AND ACCESSORIES.
ALL PIPING VALVES AND ACCESSORIES SERVING EQUIPMENT MUST BE INSTALLED IN A MANNER AS TO ALLOW 22.
IDENTIFICATION. PIPING MUST BE LABELED TO IDENTIFY CONTENTS AND DIRECTION OF FLOW.
ALL PIPING, EQUIPMENT, AND VALVES MUST BE IDENTIFIED IN A MANNER THAT ALLOWS FOR EASY 21.
ACCEPTANCE.
UNLESS NOTED OTHERWISE, GUARANTEE ALL PARTS AND LABOR FOR ONE YEAR FROM DATE OF FINAL 20.
MEET ALL OTHER TRADE CLEARANCE REQUIREMENT.
STRUCTURAL, CIVIL, AND GENERAL ARCHITECTURE. THIS MUST INCLUDE PROVIDING SUFFICIENT SPACE TO
TRADES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION, TELECOM, IT WILL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THEIR WORK WITH THAT OF ALL OTHER 19.
A DIELECTRIC UNION MUST BE USED TO JOIN ANY DISSIMILAR MATERIALS.18.
CODE.
PLUMBING CONTRACTOR MUST DISINFECT POTABLE WATER SYSTEM PER THE LOCALLY ADOPTED PLUMBING 17.
372.
WATER FOR DRINKING OR COOKING PURPOSES MUST BE LEAD FREE MEETING THE REQUIREMENTS OF ANSI
ALL PIPE, PIPE FITTINGS, JOINTS, VALVES, FAUCETS, SUPPLIES, AND FIXTURE FITTINGS UTILIZED TO SUPPLY 16.
ACCESSORIES IS PROHIBITED.
QUALITY. THE REUSE OF EXISTING FIXTURES, MATERIALS, EQUIPMENT AND ASSOCIATED COMPONENTS AND
UNLESS OTHERWISE NOTED, ALL PLUMBING FIXTURES, VALVES, PIPING, INSULATION, ETC MUST BE FIRST 15.
CONTRACTOR MUST NOTIFY THE ENGINEER PRIOR TO STARTING WORK.
CONFLICT EXISTS BETWEEN THE DESIGN DOCUMENTS AND MANUFACTURER'S REQUIREMENTS, THIS
PRIOR TO STARTING WORK. ALL WORK MUST ADHERE TO THE MANUFACTURERS' REQUIREMENTS. IF A
REVIEW ALL APPLICABLE MANUFACTURERS' INSTALLATION AND MAINTENANCE DOCUMENTS/REQUIREMENTS 14.
PRODUCT INSTALLATION MUST ADHERE TO MANUFACTURER'S RECOMMENDATIONS.13.
OF RECORD FOR APPROVAL.
PERFORMANCE AND MATERIALS. SUBMIT LITERATURE FOR ALL EQUIPMENT AND MATERIALS TO THE ENGINEER
MANUFACTURER'S MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR 12.
COMPLETE INSTALLATION.
FURNISH ANY MISCELLANEOUS ITEMS NORMALLY USED, SPECIFICALLY MENTIONED OR NOT, TO RENDER A 11.
LISTED ASSEMBLY AND PROVIDE SLEEVE WHERE REQUIRED.
SEAL ALL EXISTING AND NEW FLOOR/ROOF/WALL PENETRATIONS AS REQUIRED TO MAINTAIN INTEGRITY OF 10.
EXISTING OR AS REQUIRED BY ARCHITECTURAL DRAWINGS.
OPEN EXISTING WALLS AS REQUIRED FOR DEMOLITION AND INSTALLATION WORK. PATCH WALLS TO MATCH 9.
STRUCTURAL ENGINEER'S REVIEW AND APPROVAL.
STRUCTURAL COMPONENTS MUST NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT THE 8.
VERIFY SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING.7.
COORDINATION WITH ALL OTHER TRADES.
INCLUDE, BUT NOT BE LIMITED TO, OFFSETTING EXISTING PIPING AND MODIFICATIONS REQUIRED FOR
NECESSARY MODIFICATIONS TO EXISTING CONDITIONS TO PERFORM WORK OF THIS SECTION. THIS MUST
LOCATIONS OF EXISTING SYSTEMS/UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. MAKE ALL
ACCURACY NOR COMPLETION OF LOCATIONS SHOWN ON DRAWINGS IS GUARANTEED. DETERMINE EXACT
ALL EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS. NEITHER 6.
WORK INVOLVED.
MANAGER AND THE OWNER'S REPRESENTATIVE AND MUST BE RESOLVED PRIOR TO THE INSTALLATION OF THE
WHICH IS IN VIOLATION OF SUCH CODES MUST BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION
NO WORK WILL BE INSTALLED IN VIOLATION OF ANY GOVERNING CODES. ANY WORK SHOWN ON THE DRAWINGS 5.
STRINGENT MUST GOVERN.
ALL APPLICABLE STATE AND LOCAL CODES, RULES AND REGULATIONS. IN CASE OF DIFFERENCES THE MOST
ALL PLUMBING WORK MUST BE IN ACCORDANCE WITH THE BUILDING CODE INCLUDING ALL SUPPLEMENTS AND 4.
BECOME THOROUGHLY FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE CONTRACT.
CONNECTING THE APPARATUS, THE MEANS TO BE PROVIDED FOR GETTING THE EQUIPMENT INTO PLACE, AND
PREMISES AND ANY EXISTING WORK. DETERMINE, IN ADVANCE, THE METHODS OF INSTALLING AND
BEFORE SUBMITTING A BID CAREFULLY STUDY THE CONSTRUCTION DOCUMENTS. CAREFULLY EXAMINE THE 3.
DIMENSIONS AND EXACT LOCATION OF PLUMBING EQUIPMENT.
SYSTEM COMPONENTS. DO NOT SCALE THESE DRAWINGS. CONSULT ARCHITECTURAL PLANS FOR PROPER
THESE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO DEPICT THE GENERAL LOCATION OF PLUMBING 2.
SPECIFICATIONS, SYMBOLS LIST, ABBREVIATIONS AND DETAILS ARE APPLICABLE TO ALL DRAWINGS MARKED P.1.
PLUMBING GENERAL NOTES:
PLUMBING DEMOLITION NOTES:
ADVANCE OF ANY AND ALL UTILITY/SYSTEM SERVICE INTERRUPTIONS.
THIS CONTRACTOR MUST NOTIFY AND COORDINATE WITH THE RESIDENT ENGINEER IN WRITING 10 DAYS IN 5.
AND CAP AT NEAREST VALVE OR MAIN LINE.
FLOOR, ABOVE CEILING AND/OR IN WALLS AS REQUIRED. REMOVE ALL PIPING NOT REQUIRED FOR RENOVATION
UNLESS OTHERWISE NOTED, CAP AND CONCEAL ALL SANITARY, VENT, MEDICAL GAS, AND WATER PIPING BELOW 4.
NOTIFY THE ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH DEMOLITION.
WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE CONTRACTOR MUST 3.
EQUIPMENT INDICATED TO REMAIN.
DEMOLITION MUST BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR 2.
OR OTHER EQUIPMENT REQUIRING PLUMBING.
REQUIRED TO BE REMOVED IN PREPARATION FOR INSTALLATION OF NEW CONSTRUCTION, SPECIFIED FIXTURES
FOLLOWING: REMOVAL OF TRIM, SUPPLIES, TRAPS, VALVES, RELATED PIPING, ETC. THAT MIGHT REASONABLY BE
RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLY NOTED AND INCLUDING BUT NOT LIMITED TO THE
PLUMBING CONTRACTOR MUST PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND
SPECIFIC DEMOLITION NOTES ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN THEMSELVES. THE 1.
AAV AIR ADMITTANCE VALVE
lo tt e
-p
GRR-1701255-P101
PLUMBING LEGEND, NOTES AND SCHEDULES
grr-1701255-p101
2023-10-17T09:30:05-0500
DOUGLAS E WEAVER
2023-10-17T06:37:59-0500
CHUNSEI LEE FARREN
DRAIN PIPING DROP FROM CD DRAIN IN FLR ABV FOR AHU-2(ETR)
DRAIN PIPING DN TO FLR BLW IN BLOCK WALL(ETR)
COORD W/ DEEP BEAM, 11" OF CLEAR SPACE (TYP)
(ETR) DRAIN PIPING
CW PIPING(ETR)
(ETBR) 1/2" CAPPED CW
1/2" CW/HW, PREPARE PIPE ENDS FOR RECONN(ETR)
(ETR) 2" SAN, PREPARE PIPE END FOR RECONN
(ETBR) PLBG ROUGH-IN
(ETBR) CD DROP FROM AHU-1 ON FLR ABV
(ETBR) CD DROP TO HUB DRAIN
(ETBR) HUB DRAIN IN FLOOR
COORD W/ DEEP BEAM, 11" OF CLEAR SPACE (TYP)
DRAIN PIPING DROP FROM CD DRAIN IN FLR ABV FOR AHU-2(ETR)
DRAIN PIPING DN TO FLR BLW IN BLOCK WALL(ETR)
EXTEND 3/4" CD TO FCU-609
CW PIPING(ETR)
DRAIN PIPING(ETR)
CONN 3/4" CD TO (E) DRAIN PIPING
VERTICAL ABV CLG LEVEL
CAP 1/2" CW IN
1/2" CW/HW(ETR)
2" SAN(ETR)
EXTEND 1/2" CW/HW & 2" TO P-1
AAV
3/4" CD DROP FROM AHU-1 ON FLR ABV
WF
TILE
CARPET
P-1 lo tt e
GRR-1701255-P102
PLUMBING SIXTH FLOOR PLAN -
PLUMBING SIXTH FLOOR PLAN - DEMOLITION
P002
PLUMBING SIXTH FLOOR PLAN - NEW CONSTRUCTION
P002
ADJUST EXISTING PLUMBING TO ACCOMMODATE REVISED WATER COOLER LOCATION.
CEILING LEVEL. PIPING SHALL BE REMOVED TO A LEVEL ABOVE THE PROPOSED CEILING AND CAPPED.
THE EXISTING 1/2" CAPPED COLD WATER PIPE IS CURRENTLY LOCATED BELOW THE PROPOSED
ASSEMBLY.
MAIN/BRANCH AND CAP. PATCH 6TH FLOOR TO MATCH EXISTING, MAINTAIN INTEGRITY OF LISTED
REMOVE HUB DRAIN PIPING IN 5TH FLOOR CEILING SPACE. REMOVE PIPING BACK TO NEAREST ACTIVE
PLUMBING FIXTURE AND CABINETRY HAS BEEN DEMOLISHED.
DEMOLITION WITHIN THE SCOPE OF WORK HAS BEEN PARTIALLY COMPLETED. THE EXISTING
MAINTENANCE/REPLACEMENT.
LOCATE AIR ADMITTANCE VALVE IN CABINET, ENSURE VALVE IS ACCESSIBLE FOR
grr-1701255-p102
2023-10-17T09:30:23-0500
DOUGLAS E WEAVER
2023-10-17T06:38:13-0500
CHUNSEI LEE FARREN
lo tt e
-a
1 2 3
UTILITYHALL
AF MANAGER'S
CONFERENCE 2
CONFERENCE 1
AF MANAGER'S
CONFERENCE 2
CONFERENCE 1
GRR-1701255-A101
3RD FLOOR PLAN, EXISTING AND NEW WORK
KEYNOTES
(DEMOLITION)
NEW DOOR.
SAW CUT MASONRY WALL TO PROVIDE A 3'-4" X 7'-4" ROUGH OPENING FOR
(NEW WORK)
DETAILS 8 AND 9 ON SHEET A007.
INSTALL STEEL ANGLES AT HEAD OF NEW MASONRY OPENING. REFER TO
KEYNOTES ARE NOT SHOWN ON THIS SHEET, THEN NO WORK INTENDED.
SHEET FOR WORK TO BE ACCOMPLISHED FOR THIS PROJECT. IF THE
UNLESS DESIGNATED BY A KEYNOTE. REFER TO THE KEYNOTES ON THIS
STRICTLY FOR INFORMATION ONLY. NO WORK IS INTENDED TO BE DONE
ALL ITEMS IDENTIFIED ON THE FLOOR PLAN DRAWING ARE SHOWN
3 PATCH WALL AND FLOOR FINISHES TO MATCH EXISTING
REFER TO DETAILS 5, 6 AND 7 ON SHEET A006.
INSTALL NEW SOLID CORE WOOD DOOR, HM FRAME, AND HARDWARE.
EXISTING 3RD FLOOR PLAN
A001
3RD FLOOR PLAN - NEW WORK
A001 grr-1701255-a101
2023-10-17T09:23:27-0500
DOUGLAS E WEAVER
2023-10-17T06:30:54-0500
CHUNSEI LEE FARREN
EQUIPMENT
J
IC
FDIO
IN
CODEX
MODEM
RACK
MODEM UPS
ASR-9 SCIP AND
(UNDER POWER PANELS) P
RCDR
B2
(FRONT)
NEW
FRAME
SECURITY
GATE
SUSPENDED
COAX JUNCTION BOX
LADDER
ADJACENT TO CABLE
FROM CEILING
IL
CABINET
COMPU AIRE SYS-
TEMP / HUMIDIFIER
COMPU AIRE SYS-TEMP / HUMIDIFIER
WORK BENCH
DESK
SWITCHES
MOTOR CNTL
(WALL MOUNTED)
DIGITAL
BOOK CASE
TABLE
COMPU AIRE
BLADDER
COMM
MONITOR
WSP
WSP
WAS
EQUIP
LL
EQUIPMENT
lo tt e
GRR-1701255-A102
5TH FLOOR PLAN, EXISTING AND NEW WORK
4' 8'04'
REPLACING WITH NEW CARPET TILE.
TILE WAS PRESENT, TO BE PROPERLY ABATED BEFORE
DESIGNATES SCOPE OF WORK AREA WHERE ASBESTOS
TO BE IMPLEMENTED PRIOR TO PROCEEDING.
DEMOLITION WORK. COORDINATE WITH R.E. FOR CORRECTIVE MEASURES
MATERIAL MUST BE ABATED PRIOR TO PROCEEDING WITH ANY OTHER
ASBESTOS MATERIAL IS PRESENT IN FLOORING MATERIAL. ALL HAZARDOUS
WHERE ASBESTOS TILES WERE REMOVED.
INSTALL "ESD" CARPET TILES TO MATCH EXISTING OVER THOSE AREAS
LEGEND
EXISTING 5TH GROUND FLOOR PLAN
A002
EXISTING 5TH GROUND FLOOR PLAN - NEW WORK
A002 grr-1701255-a102
2023-10-17T09:23:45-0500
DOUGLAS E WEAVER
2023-10-17T06:32:38-0500
CHUNSEI LEE FARREN
3 3
3 3
TV
lo tt e
GRR-1701255-A103
6TH FLOOR PLAN, EXISTING AND NEW WORK
REMOVE EXISTING CMU WALL AS INDICATED.1
AND OPENING. REFER TO DETAILS 7, 8 AND 9 ON SHEET A007.
WALL UP TO UPPER FLOOR SLAB TO PROVIDE FOR NEW CMU WALL
REMOVE EXISTING DOOR AND FRAME, REMOVE PARTIAL PART OF
WITH CLEAR DOUBLE PANE GLAZING)
REMOVE EXISTING FROSTED WINDOW GLAZING (TO BE REPLACED
INSTALL NEW CARPET TILE
DOOR SCHEDULE SHEET A006
INSTALL NEW DOOR, DOOR FRAME AND DOOR HARDWARE, REFER TO
REQUIRED.
TO PLUMBING FOR FAUCET MODEL AND ELECTRICAL FOR POWER
INSTALL NEW CABINETS AND SINK WITH GOOSENECK FAUCET. REFER
MATCH EXISTING FRAME SIZE. INSTALL IN EXISTING FRAMES.
INSTALL NEW CLEAR DOUBLE PANE LOW E WINDOW GLAZING TO
AND 09 ON SHEET A007.
FOR NEW OPENING. REFER TO DETAIL 03 ON SHEET A006 AND 07, 08
MATCH EXISTING CMU WALL UP TO FLOOR SLAB ABOVE TO PROVIDE
END CLOSURE CAPS AROUND OPENING.
PROVIDE OPENING 7 FT TALL TO ENTRY HALL USE STAINLESS STEEL
7 PROVIDE NEW THRESHOLD AT FLOOR.
A006
4,5,6
A005
CONFIGURATION.
SYMBOL IMPLIES WALL TYPE, REFER TO SHEET A007 FOR WALL TYPE
FOR NEW CMU OPENING
EXISTING WATER FOUNTAIN TO REMAIN. RELOCATE AS REQUIRED
WALL BETWEEN DOOR JAMB AND WINDOW JAMB.
FOR OUTLET AND MOUNT WITH COTR. CENTER ON PRESENTATION
REINFORCEMENT FOR TV MOUNT AS REQUIRED. VERIFY HEIGHTS
INSTALL NEW POWER OUTLET TO TV MONITOR. PROVIDE
EXISTING 6TH FLOOR PLAN
A003
EXISTING 6TH FLOOR PLAN - NEW WORK
A003
SCOPE OF WORK:
1. FIELD VERIFY FOR EXACT SCOPE OF WORKS.
2. REMOVE FLOOR CARPET TILES, VINYL BASE,
METAL FURRING CHANNELS, INNER GYPSUM WALL
PANELS, CEILING TILES, CEILING GRIDS AND NON
FUNCTIONAL PIPES, CONDUITS, DUCTS, ETC.
ABOVE CEILING.
3. REMOVE ALL TRANSLUCENT GLASS PANELS AND
VENTS IN EXTERIOR WINDOWS AND REPLACE WITH
MATCHING CLEAR GLASS PANELS.
4. PROVIDE METAL FURRING CHANNELS, GYPSUM
DRYWALL PANELS AND
grr-1701255-a103
2023-10-17T09:24:05-0500
DOUGLAS E WEAVER
2023-10-17T06:33:01-0500
CHUNSEI LEE FARREN
2 2 2 lo tt e
GRR-1701255-A104
6TH FLOOR PLAN RCP PLAN
NEW (2' X 2') LED LIGHT FIXTURE INSTALLATION
SPECIFICATIONS.
FLOOR SLAB TO BE AT 7'-10" HT AND IN ACCORDANCE W/
INSTALL NEW 2' X 2' GRID AND CEILING PANELS…