J-1A GRR TRACON DWG transmittal.pdf

PDF 11 MB Posted

Attached to
MKG and GRR TRACON Realignment and Refurbishment Federal contract opportunity
Solicitation number
697DCK-24-R-00243
Issued by
Department of Transportation Federal Aviation Administration Southwestern Region

About this file

This document is a drawing transmittal related to Solicitation Number 697DCK-24-R-00243, which is for the realignment and refurbishment of the MKG and GRR TRACON at the Muskegon County Airport and the Gerald R. Ford International Airport. The scope of work includes removal of existing obsolete equipment, and providing new partitions, carpets, ceilings, HVAC, and electrical work as specified in the drawings and specifications. This is a Department of Transportation Federal Aviation Administration Southwestern Region contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to MKG and GRR TRACON Realignment and Refurbishment, newest first.
File Type Posted
J-2 MKG TRACON SPECSET_Updated 05.09.24.pdf PDF
J-1 GRR TRACON SPECSET_Updated 05.09.24.pdf PDF
697DCK-24-R-00243_Amendment 0002.pdf PDF
J-7_Questions and Answers for MKG and GRR.pdf PDF
J-6_Contractor sign in sheet_1.pdf PDF
J-6A_Contractor sign in sheet_2.pdf PDF
697DCK-24-R-00243_Amendment 0001.pdf PDF
J-3_ MI20240093 Wage Determination.pdf PDF
J-4_ MI20240088 Wage Determination.pdf PDF
J-2A MKG TRACON DWG.pdf PDF
J-1 GRR TRACON SPECSET.pdf PDF
J-5 Past Performance Questionnaire.pdf PDF
J-2 MKG TRACON SPEC.pdf PDF
697DCK-24-R-00243_MKG and GRR Solicitation.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

1/0 GND IN 3"C)

3 SETS (4-300 KCMIL &

DISTRIBUTION PANEL

BUILDING

& 1 AWG GND IN 3"C)

2 SETS (3-350KCMIL

GRR

FEDERAL AVIATION ADMINISTRATION

DEPARTMENT OF TRANSPORTATION

REV DESCRIPTION JCN

DATE

REDLINE

APVD

SUBMITTED BY APPROVED BY

JCN

DRAWN

CHECKED

REV

ISSUED BY

H

G

F

E

D

C

B

A

8 1234567

DRAWING NO

DESIGNED

REVIEWED BY

/1

/2

:4

:0

P

M lo tt e d b y S

R V

-C

-E

O

APPROVED

g rr -1

-e

.d w

8 234567

100A200A100A225A225A225A100A225A

& 1/0 GND IN 3"C)

3 SETS (4-300KCMIL

600A

100A100A100A100A100A100A 100A

400A

100A

BYPASS/ISOLATION SWITCH

800A TRANSFER SWITCH AND

ASCO 7000 AUTOMATIC

IS

BP

N

ISIS

BP

L E

ATS

CHARGER

BATTERY

GM199989-KP-C275

175KW AVTRON

LOAD BANK

BREAKER

KOHLER 600AHANDLE

BYPASS

HANDLE

ISOLATION

600A

DISCONNECT SW

LINE BREAKER

KOHLER 800A

3 SETS (4-300KCMIL

ENGINE GENERATOR

175KW DIESEL

20206TH FLOOR EH-4 & OUTLET 803, 804, ELEV EQUIP RM

OUTLETS

20 20 DRINKING FOUNTAIN

225A

DUMB WAITER

HUMIDIFIER

FCU-1

809 FAN COIL UNIT FC-9

LIGHTS 803

SPARE

OUTLETS SMOKE RM

OUTLETS 803, 804

WEATHER RM VAV

UNIT FC-10

810 FAN COIL

OUTLETS 803

RM 605 LIGHTS CONF RM

AHU-2

WATER HEATER HWN-2

6TH FLOOR WATER COOLER

OUTLET 702

RM 605 LIGHTS OFFICE B

RM 605 LIGHTS OFFICE A

601, 606, 609 & 704

OUTLET & LIGHTS

RM 605 RECPT OFFICE B

RM 605 RECPT OFFICE A

RM 605 RECPT CONF RM

CONF RM

RM 605 MICROWAVE OUTLET

21874391065

PNL TR

PNL G PNL F PNL A PNL E PNL B PNL T PNL D

PNL F1 PNL A1

6TH FLOOR

E/G ROOM RM 404 CAB

ELEVATOR

RM 707 RM 707 5TH FLOOR

PNL D1

5TH FLOOR8TH FLOOR

(TELCO CLOSET)

RM 405

SPARE SPARE

200A 200A

120/208V,3PH, 4WIRES

DISTRIBUTION PANEL "DLA"

987654321

120/208V,3PH, 4WIRES

DISTRIBUTION PANEL "MLA"

6TH FLOOR

PNL AA

PNL BB PNL ME1 PNL ME2

SPARE SPARE

W

-4

T

K

400A

NOTE 1

RM 605 GFCI RECPT CONF RM

RM 605 RECPT CONF RM

800A FUSES

SWITCH

800A RATED

TO PNL "MLA-1"

NOTE 1, AND 3 NOTE 2

3 SETS (4-300KCMIL FCU-1

7TH. FLOOR

NOTE 1, 3

NEW WORK SHOWN IN DASED RECTANGLE.3.

SCHEDULE LOCATED IN THE BASEMENT.

5 IN PANEL DLA SPARE. AFTER TR PANEL REMOVED UPDATE DLA PANEL

REMOVE POWER PANEL TR LOCATED ON THE 6TH FLOOR AND MAKE BREAKER2.

UPDATE PANEL DIRECTORY "ME 2". REFER TO DRAWING 3/E007.

UPDATE PANEL DIRECTORY IN PANEL AA LOCATED IN ROOM 609.

AFTER TERMINATION BRANCH CIRCUIT TO EXISTING CIRCUIT BREAKERS1.

NOTES

NOT TO SCALE

ONE-LINE POWER DIAGRAM

E006

EXISTING PANEL AA, 225A MCB, 120/208V, 3PH./4W

E006

U

10/20/2023

MGR: ENGINEERING

BLE

GRAND RAPIDS

GRR-1701255-E106

LER

JR

ATCT

REALIGNMENT TRACON

ELECTRICAL ONE LINE DIAGRAM

AND POWER PANEL

TERMINAL

ENGINEERING SERVICES

ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA

IO

GERALD R. FORD INTERNATIONAL AIRPORT

THIS DRAWING PRODUCED ON THE AGL REGION CAD SYSTEM

PROJECT ENGINEER

1701255

MI

grr-1701255-e106

2023-10-17T09:27:01-0500

DOUGLAS E WEAVER

2023-10-17T06:35:34-0500

CHUNSEI LEE FARREN

:1 lo tt e

LUMINAIRE SCHEDULE

LABEL QTY. MANUFACTURER CATALOG NUMBER DESCRIPTION LAMP VOLTS DRIVER MOUNTING

(17)

(4)

(1)

(4)

LIGHTING

LITHONIA

4000K LEDs

4000K LEDS 120

120 - - -

@ H = 8'-0"

RECESSED

WALL/SURFACE

@ H = 8'-0"

RECESSED

SUSPENDED CEILING

(2)

4000K LEDS 120

LDN6 40/30 LO6

WR LSS EZ1

LDN6 40/30 LO6

WR LSS EZ1

2LIGHTING

EQUIVALENT

EU2C HO OR

OR EQUIVALENT

LHQM LED R HO

LP840 OR EQUIVALENT

2AVL4 30LSE MDR EZ1

TROFFER

2' X 2' REGRESSED

EMERGENCY LIGHT

LED EXIT LIGHT W/

LED EMERGENCY LIGHT

DOWNLIGHT

6" ROUND

DOWNLIGHT

6" ROUND

4000K LEDS

4000K LEDS

WALL/SURFACE

COUNTERTOP

ABOVE

DOWN TO 1%

DIMMING PERFORMANCE

FLICKER-FREE DEEP

SMOOTH AND

DRIVER WITH

0-10V eldoLED

DOWN TO 1%

DIMMING PERFORMANCE

FLICKER-FREE DEEP

SMOOTH AND

DRIVER WITH

0-10V eldoLED

(0-10 VOLT DIMMING)

eldoLED DIMS TO 1%

RED GRN

PNK

VIO

BKL

BKL

LOAD

GRY/PINK*

L N

DETECTION AND DAYLIGHT

DIMMING, OCCUPANCY

SWITCH SENSOR WITH

WH WALLWSXA PDT EZ D

410.69 OF 2020 NEC

OTHERWISE INDICATED PER SECTION

FIXTURE MAY BE PINK OR AS

* 0-10V DIMMING COMMON FROM

BUILDING STRUCTURE

SUPPORT SYSTEM OR

UNISTRUT - TYPE

EXISTING

JUNCTION BOX (TYPICAL)

NEW OR EXISTING

(TYPICAL)

MAXIMUM LENGTH 6 FEET

CONDUIT FIXTURE WHIP

NEW FLEXIBLE METAL

FIXTURE WITH 5 TWISTS AT EACH END

WIRE AT 2 CORNERS OF

NEW GALV 12 GA SUSPENSION

CONDUIT EMT (TYPICAL)

NEW OR EXISTING

FIXTURE (TYPICAL)

NEW RECESSED

LINE, UNGROUNDED CONDUCTOR

S/N

TO PANEL "MLA-5"

LIGHTS RM 703

LIGHTS RM 703

FC-8 & OUTLET

OUTLETS RM 703

AHU-1

19 20

21 22

23 24

25 26

27 28

29 30

FAN COIL-7

RM 703

COUNTERTOP OUTLET

(GFI) RM 703

OUTLET-FRIDGE

AND DIS

MICROWAVE/FIRE

SUPPRESSION

14-18: PCU-1

W 8TH FLOOR

ROOF

26-30: TRACON

DUCT HEATER

EH-5: 7TH FLR LANDING

COOK TOP 703

COOK TOP 703

AHU-1 SMOKE DAMPER

OUTLET

BUG KILLER

OUTLET VENDING MACHINES

CU-1

LED LIGHT FIXTURES.

COMPLETE REQUIREMENTS OF CFR TITLE 47 PART 15 FOR CLASS A AND/OR CLASS B DEVICES FOR 3.

COMPLETE ASSEMBLY.

AND COMPLIANCE WITH LIGHTING CONTROL SYSTEM, PROPER FIT, AND A SECURE AND

(CONSULT WITH LIGHTING MANUFACTURER) PRIOR TO INSTALLATION TO ENSURE COMPATIBILITY

ALL LUMINAIRE BALLASTS, DRIVERS, MOUNTING BRACKETS AND ACCESSORIES MUST BE VERIFIED 2.

RECORD FOR COMPLIANCE AND APPROVAL.

BE SUBMITTED IN ADVANCE TO THE ENGINEER AND WILL BE REVIEWED BY THE ENGINEER OF

LEVEL OF QUALITY, APPEARANCE, AND PERFORMANCE THAT ANY SUBSTITUTED FIXTURES SHALL

THE FIXTURES SPECIFIED IN THE LIGHTING FIXTURE SCHEDULE ON THIS DRAWINGS ESTABLISH A 1.

GENERAL NOTES

PROJECT SPECIFICATIONS AND SEISMIC REQUIREMENTS.

INSTALLATION OF LIGHTING FIXTURES AND SUPPORTS TO MEET2.

CONDUIT RUNS TO A MAXIMUM OF 6 FEET.

BOXES TO SUPPORT NEW LIGHTING LAYOUT AND KEEP FLEXIBLE

PROVIDE NEW CONDUIT AND WIRING FROM EXISTING JUNCTION1.

WALL SWITCH OCCUPANCY SENSOR DETAIL

E007

WALL SWITCH OCCUPANCY SENSOR DETAIL

EXSITING PANEL ME 2, LOCATED ON : 7TH FLOOR

GRR-1701255-E107

LUMINAIRE SCHEDULE, PANEL SCHEDULE, AND

LUMINAIRE DETAILS

grr-1701255-e107

2023-10-17T09:27:19-0500

DOUGLAS E WEAVER

2023-10-17T06:35:48-0500

CHUNSEI LEE FARREN

:5

:3 lo tt e

-f

SCALE: 1/4"=1'-0"

ELEV

HALL

TRACON

WOMEN

IL

IT

Y

L

FIRE ALARM LEGEND

REMOTE ANNUNCIATOR PANEL

RAP

DHO

CONTROL MODULEC

SS

OFFICE

WEATHER

MOUNTED AT 48" AFF

PULL STATION,

MOUNTED AT 90" AFF (15 cd UON)

STROBE,

CEILING MOUNTED PHOTOELECTRIC

SMOKE DETECTOR

(90 dB/15 cd UON)

HORN/STROBE, MOUNTED AT 90" AFF

TRUE

NORTH

LCN MODEL 4410ME DOOR HOLD OPEN DEVICE

ALL MODIFIED WORK IS TO BE RUN CLASS A

MODIFICATION WORK FOR APPRROVAL

CONTRACTOR TO SUBMIT SHOP DRAWINGS SHOWING

BOOK

CABLE

UTILITY

ROOM

HANDICAPPED

WOMEN/

DEBRIEFING

GENERAL NOTES:

EXISTING SIXTH FLOOR PLAN

SCALE: 1/4"=1'-0"

NEW SIXTH FLOOR PLAN

CONSTRUCTION NOTES:

3 CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS

4 REPLACE EXISTING STROBE WITH HORN/STROBE

EXISTING SMOKE DETECTOR TO BE RELOCATED

EXISTING DEVICE TO BE REMOVED

NEW HORN/STROBE (15cd) TO BE INSTALLED

5 EXISTING DEVICE TO REMAIN AS IS

USING TERMINAL STRIPS. LABEL CONDUCTORS

ALL SPLICES TO BE MADE IN 6"X6" TERMINAL BOX

04 4 8

SCALE IN FEET

04 4 8

SCALE IN FEET

OFFICE A OFFICE B

CONFERENCE ROOM

AF

GRR-1701255-F101

BFS

SR

FIRE PROTECTION PLAN

-f grr-1701255-f101

2023-10-17T09:27:45-0500

DOUGLAS E WEAVER

2023-10-17T06:36:05-0500

CHUNSEI LEE FARREN

2023-10-17T06:30:10-0500

CHUNSEI LEE FARREN

2023-10-17T09:22:46-0500

DOUGLAS E WEAVER

lo tt e

-g

SYMBOLS LEGEND

X

AXXX

SECTION VIEW SYMBOL

DESIGNATIONSYMBOL

NUMBER

DETAIL

SHEET

DIRECTION

VIEW

SECTION

ELEVATION VIEW SYMBOL

ELEVATION

DETAIL TITLE1

A100

SCALE:1"=1'-0"

DETAIL NUMBER

DETAIL NAME

SHEET REFERENCE

DETAIL DRAWING SCALE

SCALE: 1" = 1"

1" 2"01"

DRAWING SCALE

DISTANCE

SCALE REFERENCE

BAR SCALE

VIEW SYMBOL

PICTURE OR DRAWING

DRAWING

PICTURE OR

ENLARGED DETAIL LOCATION

INFORMATION

FURTHER

ENLARGED FOR

THAT WILL BE

AREA OF DETAIL

DETAIL NUMBER

REFERENCE

KEYNOTE INDICATOR

DEMOLITION WORK

KEYNOTE

XX

PROVIDE A SMOOTH AND FLUSH TRANSITION.

PREP EXISTING WALLS TO RECEIVE NEW FINISHES AS REQUIRED AND ALIGN ALL NEW WALLS TO EXISTING WALLS TO 6.

ITEMS SALVAGED FOR RE-USE MUST BE CLEANED, STORED AND RE-INSTALLED AS REQUIRED BY NEW WORK.5.

IMMEDIATELY TO THE RESIDENT ENGINEER ATTENTION.

ANY EVIDENCE OF HAZARDOUS MATERIALS (I.E ACM'S) PRIOR TO OR DURING CONSTRUCTION MUST BE BROUGHT 4.

NOTIFY RESIDENT ENGINEER OF ANY DISCREPANCY IN DIMENSIONS PRIOR TO BEGINNING DEMOLITION.

TO ACCOMMODATE NEW WORK. REFER TO NEW CONSTRUCTION PLANS.

ALL DIMENSION ON DEMOLITION PLANS ARE FOR ROUGH OPENINGS TO DETERMINE THE EXTENT OF DEMOLITION REQUIRED 3.

ADJACENT CONSTRUCTION AT NO ADDITIONAL COST TO THE OWNER.

DAMAGED AND NOT INDICATED TO BE REMOVED WILL BE REPAIRED TO "LIKE NEW" CONDITION AND WILL MATCH EXISTING

PROTECT ALL EXISTING CONSTRUCTION TO REMAIN FROM DAMAGE DURING CONSTRUCTION ACTIVITIES. ANY AREA 2.

DISCARDED.

COORDINATE WITH RESIDENT ENGINEER ALL ITEMS THAT ARE TO BE REMOVED AND RETURNED TO THE OWNER OR 1.

GENERAL DEMOLITION NOTES

XX

KEYNOTE

KEYNOTE INDICATOR

NEW WORK

CONDITIONS WHICH ARE REQUIRED TO MAINTAIN THE ORIGINAL QUALITY OF MATERIALS AND EQUIPMENT.

MATERIAL AND EQUIPMENT MANUFACTURER'S INSTRUCTIONS REGARDING TEMPERATURE LIMITATIONS AND OTHER ENVIRONMENTAL

INCLUDING DAMAGE WHICH MIGHT RESULT FROM INTRUSIONS OF FOREIGN MATTER OR MOISTURE FROM ANY SOURCE. COMPLY WITH

TRANSPORT, DELIVER, HANDLE AND STORE MATERIALS AND EQUIPMENT AT THE JOBSITE IN SUCH A MANNER AS TO PREVENT DAMAGE, 16.

ALL WORK MUST BE PLUMB, SQUARE, LEVEL, IN PROPER ALIGNMENT, AND SECURELY FASTENED.15.

DO NOT ALLOW ADHESIVE ODOR AND OTHER FUMES FROM CONSTRUCTION ACTIVITY TO ENTER HVAC SYSTEM.14.

SATISFACTION OF THE RESIDENT ENGINEER.

NOT INCLUDED IN THE SCOPE OF THIS PROJECT, MUST BE REPAIRED AND CORRECTED AT CONTRACTOR'S EXPENSE AND TO THE

FIREPROOFING ON STRUCTURAL ELEMENTS AND FIRE RATED ASSEMBLIES. ANY DAMAGE TO THE EXISTING BUILDING AND/OR SITE, DISTURBED AREAS TO MATCH ADJACENT MATERIALS AND FINISHES. EXTEND PATCH TO THE NEAREST NATURAL BREAK POINT. REPAIR

PROVIDE PROTECTION FOR ALL EXISTING FINISHES TO REMAIN, AND REPAIR ANY DAMAGE THAT OCCURS. PATCH AND FINISH 13.

RESIDENT ENGINEER PRIOR TO THE COMMENCEMENT OF ANY WORK.

TO DURING THE DEMOLITION AND CONSTRUCTION PHASES. A COPY OF SUCH INSURANCE COVERAGE MUST BE FURNISHED TO THE

ADEQUATELY PROTECT PERSONS AND PROPERTY. COPIES OF ALL APPLICABLE PERMITS MUST BE MAINTAINED ON-SITE AND ADHERED

COST OF PROPER INSURANCE AS REQUIRED BY STATE AND LOCAL LAWS, NATIONAL BUILDING REGULATIONS OR CODES TO

THE CONTRACTOR MUST APPLY FOR AND OBTAIN ALL PERMITS REQUIRED BY REGULATORY AGENCIES. COSTS MUST INCLUDE THE 12.

AREAS CONCEAL PIPING, DUCTWORK WIRING AND CONDUITS.

THAT PIPING, WIRING, DUCTWORK AND CONDUITS ALLOW FOR MAXIMUM ACCESSIBILITY FOR MAINTENANCE AND REPAIRS. IN FINISHED

ESTABLISH ROUTING FOR ELECTRICAL, TELECOMMUNICATION, PLUMBING, MECHANICAL AND SECURITY SYSTEMS AS REQUIRED SO

THE CONTRACTOR MUST COORDINATE THE INSTALLATION OF NEW CONSTRUCTION WITH EXISTING CONSTRUCTION TO REMAIN. 11.

WRITING FOR SERVICE INTERRUPTIONS A MINIMUM OF 14 BUSINESS DAYS PRIOR TO PLANNED INTERRUPTION.

OTHER CHANGE IN OPERATION TO THE SYSTEM. SERVICE OR UTILITY IN QUESTION. THE CONTRACTOR WILL MAKE REQUESTS IN

WORK, CONSULT RESIDENT ENGINEER TO ARRIVE AT A MUTUALLY ACCEPTABLE SCHEDULE FOR THE INTERRUPTION, SWITCH OVER OR

PRIOR TO ANY TEMPORARY INTERRUPTION OF SERVICES DEEMED ABSOLUTELY NECESSARY BY THE CONTRACT TO PERFORM THE 10.

ALL WOOD BLOCKING TO BE FIRE RETARDANT TREATED. 9.

DISCREPANCY IN DIMENSIONS PRIOR TO BEGINNING NEW CONSTRUCTION.

ALL DIMENSIONS ARE FROM FINISHED WALL TO FINISHED WALL, UNLESS OTHERWISE NOTED. NOTIFY RESIDENT ENGINEER OF ANY 8.

SPECIFICATIONS.

PROVIDE AND INSTALL ALL MANUFACTURED ITEMS, MATERIALS AND EQUIPMENT IN STRICT ACCORDANCE WITH THE MANUFACTURER'S 7.

PROJECT PROPERTY AND DISPOSED OF IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL CODES AND REGULATIONS.

REGULAR BASIS. ALL WASTE, DEBRIS, UNUSED MATERIALS AND OTHER UNSATISFACTORY MATERIALS MUST BE REMOVED FROM THE

THE WORK AREA IS TO BE KEPT CLEAN AND ORDERLY AT ALL TIMES. REFUSE AND DEBRIS MUST BE LAWFULLY REMOVED ON A 6.

PHASES OF THE WORK AND WITHIN THE SCOPE OF THE CONTRACT DOCUMENTS.

REGULATIONS. CONTRACTOR WILL OBTAIN AND BE RESPONSIBLE FOR ALL FEES AND PERMITS REQUIRED AND ASSOCIATED WITH ALL

ALL WORK PERFORMED BY THE CONTRACTOR MUST BE DONE IN ACCORDANCE WITH APPLICABLE CODES, ORDINANCES, AND 5.

DETERMINED BY THE CONTRACTING OFFICER) MUST BE FURNISHED.

DETERMINED BY THE CONTRACTING OFFICER) MUST GOVERN, AND THE GREATER QUANTITY AND THE HIGHER QUALITY ( AS

IN CASE OF CONFLICT BETWEEN OR WITHIN THE VARIOUS CONTRACT DOCUMENTS, THE MORE STRINGENT REQUIREMENTS (AS 4.

AREAS OF CONSTRUCTION.

FOR PROTECTION AND SAFETY OF TENANTS AND GENERAL PUBLIC. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO SECURE THE

ERECT AND MAINTAIN BARRICADES, DANGER SIGNALS AND MAINTAIN BARRICADES, DANGER SIGNALS AND SIGNS IN AREAS OF WORK

MAINTAIN ALL BUILDING LIFE SAFETY, FIRE PROTECTION AND SECURITY SYSTEMS AT ALL TIMES. DO NOT BLOCK EXITS. PROVIDE, 3.

AREAS OF THE PROJECT SITE TO EMERGENCY AND SECURITY VEHICLES AT ALL TIMES AND WITHOUT DELAY DURING CONSTRUCTION.

CONTRACTOR MUST MAINTAIN ACCESS AND HAUL ROUTES IN A MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL

ACCESS MUST BE MAINTAINED DURING THE DEMOLITION AND CONSTRUCTION PHASES OF THIS PROJECT, IN ADDITION, THE

THE CONTRACTOR MUST VERIFY AND COORDINATE ALL SITE AND BUILDING ACCESS WITH THE RESIDENT ENGINEER. LOCAL TRAFFIC 2.

THE WORK. ALLOW TIME FOR PROBLEM RESOLUTION WITHOUT DELAYING THE WORK.

RESIDENT ENGINEER OF ANY CONFLICTS BETWEEN FIELD CONDITIONS AND DRAWINGS PRIOR TO PROCEEDING WITH ANY PORTION OF

THE CONTRACTOR MUST VERIFY AND COORDINATE THE SCOPE OF WORK WITH EXISTING SITE AND BUILDING CONDITIONS. NOTIFY 1.

GENERAL ARCHITECTURAL NOTES:

DWG. NO. REV. DATE DESCRIPTION

GENERAL

MECHANICAL

ARCHITECTURAL

PLUMBING

ELECTRICAL

GRR-1701255-G102

GRR-1701255-G101

GRR-1701255-A107

GRR-1701255-A106

GRR-1701255-A105

GRR-1701255-A104

GRR-1701255-A103

GRR-1701255-A102

GRR-1701255-A101

GRR-1701255-M119

GRR-1701255-M118

GRR-1701255-M117

GRR-1701255-M116

GRR-1701255-M115

GRR-1701255-M114

GRR-1701255-P102

GRR-1701255-P101

GRR-1701255-E107

GRR-1701255-E106

GRR-1701255-E105

GRR-1701255-E104

GRR-1701255-E103

GRR-1701255-E102

GRR-1701255-E101

SYMBOLS AND NOTES DRAWING INDEX

COVER SHEET AND

WALL TYPES

DOOR SCHEDULE AND DETAILS

CABINET DETAILS

6TH FLOOR PLAN RCP PLAN

6TH FLOOR PLAN, EXISTING AND NEW WORK

5TH FLOOR PLAN, EXISTING AND NEW WORK

3RD FLOOR PLAN, EXISTING AND NEW WORK

MECHANICAL CONTROLS SEQUENCE OF OPERATIONS

MECHANICAL DETAILS

MECHANICAL EIGHTH FLOOR PLAN DEMOLITION/NEW CONSTRUCTION

MECHANICAL SEVENTH FLOOR PLAN DEMOLITION/NEW CONSTRUCTION

MECHANICAL SIXTH FLOOR PLAN DEMOLITION/NEW CONSTRUCTION

MECHANICAL LEGEND, NOTES AND SCHEDULES

PLUMBING SIXTH FLOOR PLAN DEMO/NEW CONSTRUCTION

PLUMBING LEGEND, NOTES AND SCHEDULES

LUMINAIRE SCHEDULE, PANEL SCHEDULE AND LUMINAIRE DETAILS

ELECTRICAL ONE LINE DIAGRAM AND POWER PANEL

POWER PLAN 8TH FLOOR BASE BUILDING

POWER PLAN 7TH FLOOR BASE BUILDING

LIGHTING AND POWER PLAN 6TH FLOOR

ELECTRICAL DEMOLITION PLAN 6TH FLOOR

ELECTRICAL LEGEND AND ABBREVIATIONS

FIRE PROTECTION

GRR-1701255-F102

GRR-1701255-F101

FIRE PROTECTION SPECS

FIRE PROTECTION PLAN

DRAWING INDEX

GRR-1701255-G102

JJ

SYMBOLS AND NOTES AND DRAWING INDEX

-g grr-1701255-g102

2023-10-17T09:23:10-0500

DOUGLAS E WEAVER

2023-10-17T06:30:32-0500

CHUNSEI LEE FARREN

BLADESMANUFACTURER MODEL # LINKAGE

DAMPER SCHEDULE

SIZE (WxH)

4. FACTORY PROVIDED THERMOSTAT TRANSFORMER

3. AUTOMATIC CHANGEOVER BETWEEN HEATING & COOLING

2. YOUNG DIGITAL THERMOSTAT

1. FACTORY INSTALLED ELECTRIC ACTUATOR

REMARKS

REMARKSTYPE

MD-1 YOUNG REGULATOR ROUNDMODULATING2075 EXPOSED 1,2,3,4

FSD RUSKIN 14"x10" OPPOSEDFIRE/SMOKEFSD36 CONCEALED 5,6,7,8

AREA SERVED

VOLTAGE

BASIS OF DESIGN INDOOR UNIT

EER COOLING (BTUH)

WEIGHT (LBS)

INDOOR UNIT PART# OUTDOOR UNIT PART#

VERTICAL SPLIT SYSTEM SCHEDULE

MFGR

OUTDOOR UNIT

VOLTAGESENSIBLE (BTUH) ELEC HEAT (kW)EXT SP (IN WC) INDOOR OUTDOORMOCP (A)MCA (A)SIZE (TONS)MOCP (A)MCA (A)OA (CFM)SA (CFM)

CONDENSATE DRAIN TRAP WITH SHUTOFF SWITCH & ALARM5.

CONTRACTOR TO FIELD ADJUST DRAIN PAN CONNECTION SIDE4.

FACTORY INSTALLED HAIL GUARD3.

CONTRACTOR

EXTERNAL DISCONNECT SWITCH PROVIDED BY ELECTRICAL 2.

R-410A REFRIGERANT1.

ENTERING DB/WB LEAVING DB/WB

208/3/60TRANE 14 21,100110AHU-1/CU-1 OFFICE A/B & CONF RM GAF2A0A36M31 4TTA4036A3 208/3/60 12 20930 27,600 81.0" 40 40 98 156378.0/65.2 56.2/55.0

SIZE REFRIGERANT LINES PER MANUFACTURER'S INSTALLATION MANUAL FOR ACTUAL PIPING LIFT AND LENGTH.10.

RUBBER ISOLATOR KIT9.

BOTTOM RETURN FILTER BOX8.

UPFLOW CONFIGURATION7.

HIGH EFFICIENCY ECM MOTOR6.

1 THRU 9

UP

DN

MECHANICAL LEGEND

THERMOSTAT

EQUIPMENT IDENTIFICATION TAG

DEVICE TYPE/AIRFLOW/NECK SIZE

SA

8"Ø

AIRFLOW DIRECTION

FLEX DUCT

MANUAL VOLUME DAMPER

2'x2' SUPPLY DIFFUSER

2'x2' RETURN GRILLE

SUPPLY DUCT UP

SUPPLY DUCT DOWN

RETURN DUCT UP

RETURN DUCT DOWN

ABOVE/THRU ROOF ABOVE

SUPPLY DUCT UP TO FLOOR

ABOVE/THRU ROOF ABOVE

RETURN DUCT UP TO FLOOR

LONG RADIUS ELBOW

45 DEGREE ENTRY

SQUARE THROAT ELBOW

MITERED OFFSET

MODULATING DAMPER

MECHANICAL ABBREVIATIONS

BMS

CWR

CWS

CLG

CU

ESP

EWT

FCU

FLA

GPM

HWR

HWS

BUILDING MANAGEMENT SYSTEM

CHILLED WATER RETURN

CHILLED WATER SUPPLY

CEILING

CONDENSING UNIT

DEGREES FARIENHEIT

EXTERNAL STATIC PRESSURE

ENTERING WATER TEMPERATURE

FANCOIL UNIT

FULL LOAD AMPS

GALLONS PER MINUTE

MCA

MOCP

OA

RA

REF

VAV

ABV ABOVE

AP ACCESS PANEL

BLW BELOW

CD CONDENSATE DRAIN

CONT CONTINUATION

CONN CONNECT

DEG F

DN DOWN

DWG DRAWING

(E) EXISTING

(ETR) EXISTING TO REMAIN

EXISTING TO BE REMOVED(ETBR)

FLR

TYP

EER ENERGY EFFICIENCY RATIO

kW

MIN

W/

COORDINATECOORD

FLOOR

T-STAT

IN WC

HOT WATER RETURN

HOT WATER SUPPLY

MINIMUM CIRCUIT AMPS

MAX OVER CURRENT PROTECTION

OUTSIDE AIR

RETURN AIR

REFRIGERANT

SUPPLY AIR

THERMOSTAT

TYPICAL

VOLTS

VARIABLE AIR FLOW

H20 INCHES WATER PRESSURE

KILOWATT

MINIMUM

WITH

SUBCONTRACTOR.

ALL DAMPER OPERATORS MUST BE LOW VOLTAGE. ALL WIRING SHALL BE BY THE MECHANICAL 17.

FIRE/SMOKE DAMPER.

DUCT PENETRATIONS THRU FIRE/SMOKE RATED ASSEMBLIES MUST BE PROVIDED WITH A UL RATED 16.

SCHEDULE.

ALL DIFFUSERS, GRILLES, AND REGISTERS MUST BE IN ACCORDANCE WITH THE DIFFUSER/GRILLE/REGISTER 15.

OF THE FLEXIBLE DUCT.

DIFFUSERS, GRILLES, AND REGISTERS CONNECTED TO FLEXIBLE DUCT MUST BE SUPPORTED INDEPENDENTLY 14.

STAINLESS STEEL BANDS MUST BE USED FOR FLEXIBLE DUCT CONNECTIONS.13.

SUPPORT ALL FLEXIBLE DUCTWORK AT AN INTERVAL NOT LESS THAN 5'-0" ON CENTER.12.

PULL FLEXIBLE DUCTWORK TAUGHT AND INSTALL AS STRAIGHT AS POSSIBLE.11.

TRIM FLEXIBLE DUCTWORK RUNS TO THE MINIMUM LENGTH NECESSARY TO MAKE CONNECTION.10.

FLEXIBLE DUCTWORK RUNS MUST NOT EXCEED 6'-0" IN LENGTH.9.

THE USE OF DOVETAIL AND/OR SEAL TIGHT FACE MOUNTED TAP-INS ARE NOT ACCEPTABLE.8.

DO NOT CONSTRUCT OR INSTALL TAPS OUT OF REDUCERS, TEES, AND/OR ELBOWS.7.

VOLUME DAMPERS MUST BE PROVIDED AT EACH TAKE OFF.6.

ALL SUPPLY, OUTSIDE, AND RETURN AIR DUCTWORK MUST BE INSULATED.5.

ELEVATIONS WITH ALL OTHER TRADES AND EXISTING CONDITIONS.

INSTALL DUCTWORK AS HIGH AS POSSIBLE, UNLESS INDICATED OTHERWISE. COORDINATE DUCTWORK 4.

REQUIREMENTS.

ALL DUCTWORK IS SHOWN AS FREE AREA INSIDE DIMENSIONS, REFER TO SPECIFICATIONS FOR INSULATION 3.

ALL SUPPLY AIR DUCTWORK MUST BE RECTANGULAR, UNLESS INDICATED OTHERWISE.2.

ALL APPLICABLE SMACNA STANDARDS.

ALL DUCTWORK MUST BE CONSTRUCTED, INSTALLED, AND SUPPORTED PER THE MOST RECENT EDITION OF 1.

MECHANICAL DUCTWORK NOTES:

DAYS IN ADVANCE OF ANY AND ALL UTILITY/SYSTEM SHUTDOWNS.

SUBCONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE RESIDENT ENGINEER, IN WRITING, 10 WORKING 5.

SHALL NOTIFY THE RESIDENT ENGINEER PRIOR TO PROCEEDING WITH DEMOLITION.

WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE SUBCONTRACTOR 4.

EQUIPMENT INDICATED TO REMAIN.

DEMOLITION SHALL BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR 3.

NEW CONSTRUCTION.

PIPING, ETC THAT MIGHT REASONABLY BE REQUIRED TO BE REMOVED IN PREPARATION FOR INSTALLATION OF

LIMITED TO: REMOVAL OF EQUIPMENT, DUCTWORK, CEILING DEVICES, DAMPERS, CONTROLS, VALVES, RELATED

NEW AND RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLY NOTED. THIS SHALL INCLUDE BUT NOT

MECHANICAL SUBCONTRACTOR SHALL PROVIDE ALL DEMOLITION WORK INCIDENTAL TO OR REQUIRED FOR

SPECIFIC DEMOLITION NOTES ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN THEMSELVES. THE 2.

CONDITIONS SHALL BE REPORTED TO THE RESIDENT ENGINEER PRIOR TO STARTING DEMOLITION WORK.

EXISTING PIPING, ETC. ANY DISCREPANCIES BETWEEN THE CONSTRUCTION DOCUMENTS AND VERIFIED FIELD

EQUIPMENT, THE EXACT SIZES AND ROUTING OF EXISTING DUCTWORK, THE EXACT SIZES AND ROUTING OF

BEFORE DEMOLITION WORK BEGINS THE SUBCONTRACTOR SHALL VERIFY THE CONDITION OF ALL EXISTING 1.

MECHANICAL DEMOLITION NOTES:

GRAND RAPIDS, MI

COOLING PER ASHRAE 0.4%

89.2 DEG F 73.1 DEG F

DRY BULB WET BULB ASHRAE 99.6%

HEATING PER

2.8 DEG F 75 DEG F

COOLING HEATING

DESIGN SETPOINTS

70 DEG F

LOUVER

UP ELBOW

DOWN ELBOW

SHUTOFF VALVE

BREAK

FSD

FIRE/SMOKE DAMPER

RECTANGLE TO ROUND TRANSITION

AHU AIR HANDLING UNIT

MEET ALL OTHER TRADE CLEARANCE REQUIREMENTS.

STRUCTURAL, CIVIL, AND GENERAL ARCHITECTURE. THIS MUST INCLUDE PROVIDING SUFFICIENT SPACE TO

OTHER TRADES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL, PLUMBING, FIRE PROTECTION, TELECOM, IT WILL BE THE RESPONSIBILITY OF THIS SUBCONTRACTOR TO COORDINATE THEIR WORK WITH THAT OF ALL 17.

VOLTAGES SHOWN HEREIN.

MECHANICAL EQUIPMENT WITH THE ELECTRICAL DRAWINGS AND MUST FURNISH EQUIPMENT WIRED FOR THE

SUBCONTRACTOR MUST COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL 16.

A DIELECTRIC UNION MUST BE USED TO JOIN ANY DISSIMILAR MATERIALS.15.

AND ASSOCIATED COMPONENTS AND ACCESSORIES IS PROHIBITED.

FIRST QUALITY. UNLESS INDICATED OTHERWISE, THE REUSE OF EXISTING DEVICES, MATERIALS, EQUIPMENT

ALL EQUIPMENT, DUCTWORK, DEVICES, DAMPERS, CONTROLS, VALVES, PIPING, INSULATION, ETC MUST BE 14.

SUBCONTRACTOR MUST NOTIFY THE ENGINEER PRIOR TO STARTING WORK.

CONFLICT EXISTS BETWEEN THE DESIGN DOCUMENTS AND MANUFACTURER'S REQUIREMENTS, THIS

PRIOR TO STARTING WORK. ALL WORK MUST ADHERE TO THE MANUFACTURERS' REQUIREMENTS. IF A

REVIEW ALL APPLICABLE MANUFACTURERS' INSTALLATION AND MAINTENANCE DOCUMENTS/REQUIREMENTS 13.

PRODUCT INSTALLATION MUST ADHERE TO MANUFACTURER'S RECOMMENDATIONS.12.

OF RECORD FOR APPROVAL.

PERFORMANCE AND MATERIALS. SUBMIT LITERATURE FOR ALL EQUIPMENT AND MATERIALS TO THE ENGINEER

MANUFACTURER'S MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR 11.

COMPLETE INSTALLATION.

FURNISH ANY MISCELLANEOUS ITEMS NORMALLY USED, SPECIFICALLY MENTIONED OR NOT, TO RENDER A 10.

MAINTAIN INTEGRITY OF LISTED ASSEMBLY, PROVIDE SLEEVES WHERE REQUIRED.

SEAL ALL EXISTING AND NEW FLOOR/ROOF/WALL PENETRATIONS WITHIN THE SCOPE OF WORK AS REQUIRED TO 9.

EXISTING OR AS REQUIRED BY NEW CONSTRUCTION DRAWINGS.

OPEN EXISTING WALLS AS REQUIRED FOR DEMOLITION AND INSTALLATION WORK. PATCH WALLS TO MATCH 8.

STRUCTURAL ENGINEER'S REVIEW AND APPROVAL.

STRUCTURAL COMPONENTS MUST NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT A 7.

VERIFY SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY DUCTWORK/PIPING.6.

COORDINATION WITH ALL OTHER TRADES.

INCLUDE, BUT NOT BE LIMITED TO, OFFSETTING EXISTING PIPING AND MODIFICATIONS REQUIRED FOR

NECESSARY MODIFICATIONS TO EXISTING CONDITIONS TO PERFORM WORK OF THIS SECTION. THIS MUST

LOCATIONS OF EXISTING SYSTEMS/UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. MAKE ALL

ACCURACY NOR COMPLETION OF LOCATIONS SHOWN ON DRAWINGS IS GUARANTEED. DETERMINE EXACT

ALL EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS. NEITHER 5.

AND MUST BE RESOLVED PRIOR TO THE INSTALLATION OF THE WORK INVOLVED.

ON THE DRAWINGS WHICH IS IN VIOLATION MUST BE BROUGHT TO THE ATTENTION OF THE RESIDENT ENGINEER

NO WORK SHALL BE INSTALLED IN VIOLATION OF ANY GOVERNING STANDARDS AND CODES. ANY WORK SHOWN 4.

LOCAL CODES, RULES AND REGULATIONS. IN CASE OF DIFFERENCES THE MOST STRINGENT MUST GOVERN.

ALL MECHANICAL WORK MUST BE IN ACCORDANCE WITH FAA STANDARDS AND ALL APPLICABLE STATE AND 3.

BECOME THOROUGHLY FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE CONTRACT.

CONNECTING THE APPARATUS, THE MEANS TO BE PROVIDED FOR GETTING THE EQUIPMENT INTO PLACE, AND

PREMISES AND ANY EXISTING WORK. DETERMINE, IN ADVANCE, THE METHODS OF INSTALLING AND

BEFORE SUBMITTING A BID CAREFULLY STUDY THE CONSTRUCTION DOCUMENTS. CAREFULLY EXAMINE THE 2.

MECHANICAL SYSTEM COMPONENTS. DO NOT SCALE THESE DRAWINGS.

THESE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO DEPICT THE GENERAL LOCATION OF 1.

MECHANICAL GENERAL NOTES:

MECHANICAL SUBCONTRACTOR MUST PROVIDE ALL REQUIRED CONTROL WIRING AND CONDUIT.38.

REVIEW.

BALANCE AND OPERATION OF CONTROLS REPORT MUST BE PROVIDED TO THE ENGINEER OF RECORD FOR

MECHANICAL SYSTEMS WITHIN THE SCOPE OF WORK. UPON COMPLETION OF WORK, A WRITTEN TEST &

UPON COMPLETION OF WORK AN INDEPENDENT AND CERTIFIED T&B COMPANY MUST TEST AND BALANCE ALL 37.

SYSTEMS.

INSTALL ALL BALANCING DEVICES NEEDED TO ACHIEVE PROPER ADJUSTING AND BALANCING OF MECHANICAL 36.

DUCT DOWNSTREAM OF THE FINAL FILTERS AND PRIOR TO THE FIRST DUCT BRANCH CONNECTION.

DUCT SMOKE DETECTORS MUST BE LISTED FOR DUCT INSTALLATIONS AND INSTALLED IN THE MAIN SUPPLY 35.

MOUNT THERMOSTATS WHERE INDICATED ON PLANS AT 4'-0" ABOVE FINISH FLOOR UNLESS NOTED OTHERWISE.34.

EXPOSURE TO SUNLIGHT & SUPPLY AIR, & OBSTRUCTIONS THAT CREATE STAGNANT AIR AT THE THERMOSTAT.

LOCATE THERMOSTATS TO AVOID HALLWAYS, WINDOWS, EXTERIOR DOORS, EXTERIOR WALLS, DIRECT 33.

BE PROVIDED WITH A DOWNWARD ARC PRIOR TO ENTERING THE BUILDING.

REFRIGERANT PIPING FOR CONDENSING UNITS LOCATED ABOVE THE FAN COIL UNIT THEY ARE SERVING MUST 32.

REFRIGERANT PIPING MUST BE INSULATED SEPARATELY.31.

ALL EXTERIOR REFRIGERANT PIPING INSULATION MUST BE PROVIDED WITH A PVC COVERING.30.

THICK FOR ALL INTERIOR LOCATIONS.

REFRIGERANT PIPING INSULATION MUST BE CLOSED-CELL AND 1" THICK FOR ALL EXTERIOR LOCATIONS AND 3/4" 29.

DRIER.

ALL REFRIGERANT PIPING MUST BE PROVIDED WITH SERVICE VALVES, SIGHT GLASS, AND LIQUID LINE FILTER 28.

DUCTWORK AND PIPING MUST NOT RUN OVER ELECTRIC PANELS.27.

MUST NOT REST ON CEILING TILES OR CEILING STRUCTURE.

ALL DUCTWORK AND PIPING ABOVE GRADE MUST BE PROPERLY SUPPORTED BY THE BUILDING STRUCTURE AND 26.

ON PIPING.

PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS 25.

ALL CONDENSATE DRAINAGE PIPING LOCATED IN UNCONDITIONED SPACE MUST BE INSULATED.24.

FLOW.

PITCH CONDENSATE RETURN PIPING AT A MINIMUM SLOPE OF 0.4% DOWNWARD IN DIRECTION OF CONDENSATE 23.

ADJACENT WALL OR CEILING. THE TAG MUST BE VISIBLE FROM THE OCCUPIED SPACE.

THE LOCATION OF ALL FIRE, SMOKE, AND BALANCING DAMPERS MUST BE IDENTIFIED BY A TAG AFFIXED TO THE 22.

AND DIRECTION OF FLOW.

THAT ALLOWS FOR EASY IDENTIFICATION. DUCTWORK AND PIPING MUST BE LABELED TO IDENTIFY CONTENTS

ALL EQUIPMENT, DEVICES, DUCTWORK, CONTROLS, PIPING, VALVES, ETC MUST BE IDENTIFIED IN A MANNER 21.

ACCEPTANCE.

UNLESS OTHERWISE NOTED, GUARANTEE ALL PARTS AND LABOR FOR ONE YEAR FROM DATE OF FINAL 20.

AND SELF-CLOSING TYPE.

ACTUATORS, SENSORS, ETC IN CEILINGS AND WALLS. ACCESS PANELS IN RATED ASSEMBLIES MUST BE LISTED

SUBCONTRACTOR MUST PROVIDE ACCESS PANELS WHERE REQUIRED FOR ACCESS TO VALVES, DAMPERS, 19.

WITHOUT ADDITIONAL EXPENSE TO THE FAA/PARSONS.

MAKE ALL NECESSARY DUCTWORK OFFSETS AND TRANSITIONS TO COORDINATE WITH OTHER TRADES 18.

8. ELECTRIC ACTUATOR AND FUSE LINK

7. FACTORY SLEEVE

6. 1-1/2 HOUR RATING

5. LEAKAGE CLASS 2

AIR DEVICE SCHEDULE

SYMBOLS TYPE MATERIAL FINISH

S-1 SUPPLY DIFFUSER STEEL WHITE

1,2,3

& MODEL #

MANUFACTURER

SIZE

R-1 STEEL WHITE24x24

CEILING MOUNT3.

NC VALUE SHALL NOT EXCEED 30.2.

4-WAY ADJUSTABLE1.

RETURN GRILLE

PRICE #SCD

PRICE #PDDR

24X24

2,3

AREA SERVED

FAN

(LBS)

WEIGHT

ESP (IN WC) GPM

FAN COIL UNIT SCHEDULE

CFM MOCP (A)MCA (A)

ACTUAL FLOW

INDICATED, CONTRACTOR SHALL SIZE CONTROL VALVE FOR

IF ACTUAL WATER FLOW FOR FURNISHED COIL IS LESS THAN 1.

155FCU-1 DEBRIEFING ROOM #602 0.15 12 20 98

SHUTDOWN UPON OVERFLOW

PROVIDE FLOAT SWITCH IN SECONDARY DRAIN PAN FOR UNIT 3.

STAINLESS STEEL IAQ DRAIN PAN2.

1, 2, 3

TYPE

CHILLED/HOT WTR

BASIS OF DESIGN

TRANE FCCB030

MIN OA

FILTERS

2" PLEATED

COOLING COIL

0.75

EWT

EADB

77.3

EAWB

64.8

TOTAL (BTUH)

3,600

SENSIBLE (BTUH)

3,300

PIPE CONN SIZE

WTR PRES DROP

HP

1/4

VOLTAGE

208/60/1

GPM

HEATING COIL

0.22

EWT EADB

66.9

LADB

79.2

CAPACITY (BTUH)

2,200

WTR PRES DROP

BRANCH SIZE

3/8"

ELECTRIC

SYMBOLS

SYMBOLST

ACU

LOCATION

PROJECT DESIGN CONDITIONS

SYMBOLS

lo tt e

-m

GRR-1701255-M114

NAC

AK

MECHANICAL LEGEND, NOTES AND SCHEDULES

grr-1701255-m114

2023-10-17T09:28:11-0500

DOUGLAS E WEAVER

2023-10-17T06:36:22-0500

CHUNSEI LEE FARREN

14X10 RA UP TO FLR ABV

AP FOR ACCESS TO ESD

(ETBR) 36x24 RA GRILLE

RA GRILLE

(ETBR) 36x24

(ETBR) 36x15 RA

UP TO FLR ABV

(ETBR) 28x16 RA

FLEXDUCT (TYP)

(ETBR) SA

(ETBR) 25x8 SA

(ETBR) 12x6 SA

(ETBR) 28x10 SA

(ETBR) 20x8 SA

(ETBR) 18x6 SA

DN FROM FLR ABV

(ETBR) 36x15 SA

:0 lo tt e

D605B

8x6

8x6S-1

R-1

TO CV-3 ON 7TH FLR

(ETR) 3/4" HWS/R W/ CONT

OFFICE A

OFFICE B

ENTRY

605C

605B

605A

605D

S-1

MD-1

MD-1

10x10

14x10 SA DROP FROM FLR ABV

12x10

10"Ø

14x10

16x6

OF CLEAR SPACE (TYP)

COORD W/ DEEP BEAM, 11"

DEBRIEFING ROOM

1" CWS/R & 1" HWS/R(ETR)

2" CWS/R & 1-1/2" HWS/R UP & DN(ETR)

1-1/2" CWS/R & 1-1/4" HWS/R(ETR)CONN TO AHU-1 ON 7TH FLR

FCU

(ETBR) VAV BOX & CONTROL WIRING

(ETBR) SA REGISTER (TYP)

(ETBR) 20x10 SA

14x8 SA

(ETBR)

HWS/R UP & DN

(ETR) 2" CWS/R & 1-1/2"

& 1-1/4" HWS/R

(ETR) 1-1/2" CWS/R

(ETBR) T-STAT

(ETBR) 16" RA FLEXDUCT

(ETR) CWS/R & HWS/R W/ CONT TO FAN COIL ON 7TH FLR (TYP)

(ETR) 1" CWS/R & 1" HWS/RFOR CLARITY)

STAT NOT SHOWN

(ETBR) VAV T-STAT (T-

DIFFUSER (TYP)

(ETBR) SA

(ETR) 1" CWS/R & 3/4" HWS/R UP TO AHU ON 7TH FLR

(ETR) 3/4" HWS/R W/ CONT TO CV-3 ON 7TH FLR

OF CLEAR SPACE (TYP)

COORD W/ DEEP BEAM, 11"

WOMEN/ HANDICAPPED

04/20/2023

GRR-1701255-M115

MECHANICAL SIXTH FLOOR PLAN -

DEMOLITION/NEW CONSTRUCTION

SCALE: 1/4" = 1'-0"

MECHANICAL SIXTH FLOOR PLAN - NEW CONSTRUCTION

M015

MECHANICAL SIXTH FLOOR PLAN - DEMOLITION

M015

DEMOLITION SHEET NOTES:

DEMOLISHED

FLEX DUCT SHOWN WITHOUT A CONNECTED CEILING DEVICE HAS ALREADY HAD THE DEVICE 3.

SUPPORTED BY IT'S WIRING.

THE WALL THE TRACON ROOM T-STAT WAS MOUNTED TO HAS BEEN DEMOLISHED. THE T-STAT IS 2.

DEMOLITION WITHIN THE SCOPE OF WORK HAS BEEN PARTIALLY COMPLETED1.

NEW CONSTRUCTION SHEET NOTES:

EXISTING, MAINTAIN INTEGRITY OF LISTED ASSEMBLY.

REUSE EXISTING 7TH FLOOR PENETRATIONS. MODIFY/PATCH OPENINGS AS NEEDED TO MATCH 6.

WITH AIR HANDLING UNIT AND FIRE ALARM SYSTEMS.

PROVIDE FIRE/SMOKE DAMPERS AT 7TH FLOOR PENETRATION. INTERLOCK FIRE/SMOKE DAMPERS 5.

FIELD COORDINATE FINAL LOCATION OF ALL THERMOSTATS.4.

REQUIRED.

FCU-609 DUCTWORK SHALL UTILIZE EXISTING OPENINGS IN BLOCK WALL, FIELD MODIFY OPENINGS AS 3.

FAN COIL UNIT 609.

EXTEND 3/4" CHILLED AND HOT WATER PIPING FROM EXISTING 1" CHILLED AND HOT WATER PIPING TO 2.

PLAN FOR ADDITIONAL ROUTING.

NOT ALL CHILLED AND HOT WATER PIPING IS SHOWN FOR CLARITY, REFER TO DEMOLITION FLOOR 1.

DEMOLITION LEGEND:

SYMBOL DESCRIPTION

EXISTING TO REMAIN

EXISTING TO BE REMOVED

DEMO TO THIS POINT

NEW CONSTRUCTION LEGEND:

DESCRIPTIONSYMBOL

NEW CONSTRUCTION

CONNECT TO EXISTING

4' 0 4' 8' grr-1701255-m115

2023-10-17T09:28:32-0500

DOUGLAS E WEAVER

2023-10-17T06:36:36-0500

CHUNSEI LEE FARREN

lo tt e

ROOF DECK

STORAGE

(ETR) AHU-2

(ETR) 1" CWS/R & 3/4" HWS/R UP FROM 6TH FLR

(ETR) AHU-2

(ETR) 1" CWS/R & 3/4" HWS/R UP FROM 6TH FLR

AP FOR ACCESS TO FSD

OA LOUVER

(ETR) 36x34

12x12 OA DROP TO PLENUM

14x10 RA UP TO PLENUM FROM FLR BLW

RA/OA PLENUM

60x22x12H

10x14

TO FLOOR ABOVE

REF PIPING UP

AHU

60/40/3

GRR-1701255-M116

MECHANICAL SEVENTH FLOOR PLAN -

MECHANICAL SEVENTH FLOOR PLAN - DEMOLITION

M016

MECHANICAL SEVENTH FLOOR PLAN - NEW CONSTRUCTION

M016

THE EXISTING CONDENSING UNIT ROOF CURB SUPPORTS ARE TO BE REUSED. 2.

CONTROLS ARE TO BE DISCONNECTED AND REUSED BY THE REPLACEMENT SYSTEM.

THE EXISTING CONDENSING UNIT IS CONNECTED TO THE BUILDING MANAGEMENT SYSTEM. ALL 1.

ALL ADDITIONAL POINTS INDICATED IN SCOPE OF WORK.

ACCESSORIES REQUIRED FOR THE SYSTEM TO MAINTAIN EXISTING MONITORING/ALARM POINTS AND

CONNECT CU-1 TO BUILDING MANAGEMENT SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND 3.

PENETRATIONS TO MAINTAIN INTEGRITY OF LISTED ASSEMBLY.

REUSE EXISTING WALL AND FLOOR PENETRATIONS FOR REFRIGERANT PIPE ROUTING, SEAL 2.

SECURE CONDENSING UNIT TO EXISTING ROOF CURB SUPPORT, MODIFY CURB AS NEEDED.1.

grr-1701255-m116

2023-10-17T09:28:49-0500

DOUGLAS E WEAVER

2023-10-17T06:37:02-0500

CHUNSEI LEE FARREN

ROOF ROOF

(ETBR) REF PIPING RISE FROM FLOOR BELOW

(ETR) PIPE SUPPORT (TYP)

(ETBR) REF PIPING

(ETR) PCU-1

REF PIPING RISE FROM FLOOR BELOW

(ETR) PIPE SUPPORT (TYP)

EXTEND REF PIPING TO CU-1

COORDINATE CONDENSER INSTALLATION WITH ROOF DRAIN IN THIS AREA

(ETR) PCU-1

CU

MACHINE RM

SMOKERS BREAKROOM

NATCA OFFICE

(ETBR) ROOF

MACHINE RM

SMOKERS BREAKROOM

NATCA OFFICE

30/20/3

ME-2, 26/28/30

:2 lo tt e

GRR-1701255-M117

MECHANICAL EIGHTH FLOOR PLAN -

MECHANICAL EIGHTH FLOOR PLAN - DEMOLITION

M017

MECHANICAL EIGHTH FLOOR PLAN - NEW CONSTRUCTION

M017

THE EXISTING CONDENSING UNIT ROOF CURB SUPPORTS ARE TO BE REUSED. 2.

CONTROLS ARE TO BE DISCONNECTED AND REUSED BY THE REPLACEMENT SYSTEM.

THE EXISTING CONDENSING UNIT IS CONNECTED TO THE BUILDING MANAGEMENT SYSTEM. ALL 1.

ALL ADDITIONAL POINTS INDICATED IN SCOPE OF WORK.

ACCESSORIES REQUIRED FOR THE SYSTEM TO MAINTAIN EXISTING MONITORING/ALARM POINTS AND

CONNECT CU-1 TO BUILDING MANAGEMENT SYSTEM. PROVIDE ALL NECESSARY COMPONENTS AND 3.

PENETRATIONS TO MAINTAIN INTEGRITY OF LISTED ASSEMBLY.

REUSE EXISTING WALL AND FLOOR PENETRATIONS FOR REFRIGERANT PIPE ROUTING, SEAL 2.

SECURE CONDENSING UNIT TO EXISTING ROOF CURB SUPPORT, MODIFY CURB AS NEEDED.1.

grr-1701255-m117

2023-10-17T09:29:08-0500

DOUGLAS E WEAVER

2023-10-17T06:37:15-0500

CHUNSEI LEE FARREN

"S" SLIP TYPE BREAKAWAY

SLEEVE PER UL LISTING

#10 SHEET METAL SCREWS

SUPPLIED BY DAMPER MANUFACTURER.

PIECE RETAINING ANGLE ALL AROUND

MIN. 1 1/2" X 1 1/2" X 16 GAUGE SINGLE

MIN. TWO PER SIDE @ 12" O.C.

1/4" X 1 1/4" SELF TAPPING SCREWS.

BETWEEN WALL AND DAMPER.

1/8" CLEARANCE PER FOOT OF PERIMETER

ACTUATOR

MOUNTED DAMPER

120V EXTERNALLY

WITH SHEET METAL STRIP

SUPPORT FROM STRUCTURE

WITH VOLUME DAMPER

HIGH EFFICIENCY TAKE-OFF

OUT WITH DUCT WRAP

SHEET METAL RUN

FLEXIBLE DUCT

INSULATED

DUCT WRAP

DIFFUSER NECK

METAL ELBOW AT

PROVIDE 45° SHEET

INSULATION

CEILING WITH

ROUND NECK

WITHIN 5 LINEAR FEET OF DIFFUSER

EXTEND SHEET METAL RUN OUT TO

SUPPLY DUCT

LOW PRESSURE

OR EXHAUST DUCT

MAIN SUPPLY, RETURN

WITH TURNING VANES

RADIUS OR TO BE PROVIDED

ALL ELBOWS ARE TO BE FULL

MANUAL VOLUME DAMPER

AIR DEVICE (TYP.)

RETURN AND EXHAUST

TYPICAL AIR FLOW FOR SUPPLY,

ACCEPTABLE TAPS

USE SPECIFICATIONS FOR

BALANCE VALVE

PRESSURE GAUGE W/COCK TYP

DIAL THERMOMETER TYP

FULL SIZE BYPASS

2-WAY CONTROL VALVE

STRAINER

FLEX CONN (TYP)

DRAIN VALVE

DRAIN PLUG

ADAPTOR

MINIMUM SIZE 3/4"

AIR CONDITIONING UNIT

AIR HANDLING UNIT OR

SECTION

DRAIN PAN

COOLING COIL

SERVICE VALVES

SIGHT GLASS

FILTER DRYER

PENETRATION

SEE PIPE

CURB DETAIL

SEE ROOF

3/4" COND. DR.

REFRIGERANT PIPING

FC

AIR HANDLING UNIT

RETURN AIR PLENUM

FC

R.A.

WALL

THREADED ROD CUT TO LENGTH

CLEVIS TYPE PIPE HANGER

CARRIER PIPE

INSULATION DIAMETER

LENGTH 1.5 TIMES

SHIELD FOR INSULATION -

JACKSHAFT

DUCT

CLEVIS TYPE HANGER

M018

TYPICAL LOW PRESSURE SUPPLY, RETURN, & EXHAUST DUCT

CHILLED AND HOT WATER PIPING

CONDENSATE DRAIN

NOT TO SCALEM018

TYPICAL DIFFUSER CONNECTION

ROOF MOUNTED CONDENSING UNIT

VERTICAL AIR HANDLING UNIT/

PROVIDE ACCESS DOOR MAINTENANCE.5.

PROVIDE RESETTABLE LINK WITH 165 DEGREE RATING.4.

PROVIDE MOTOR ACTUATOR SIZED AND INSTALLED BY DAMPER MANUFACTURER.3.

OF 250 DEGREES, AND MIN. CLASS LEAKAGE.

PROVIDE DAMPER WITH MIN. FIRE RESISTANCE RATING OF 1 1/2 HOURS. TEMPERATURE RATING 2.

PROVIDE 'V' STYLE DAMPER BLADES.1.

NOTES:

DAMPER LINKAGE

DOOR

ACCESS

SEE NOTES.

COMBINATION

OPPOSED BLADE

METAL WITH PLASTIC CABLE TIES

FASTEN FLEXIBLE DUCT TO SHEET

SEE PLANS

SUPPLY

RETURN

MAV

2-WAY OR 3-WAY CONTROL VALVE

COIL

RS

RL

ROOF

SUPPLY AIR

lo tt e

GRR-1701255-M118

MECHANICAL DETAILS

grr-1701255-m118

2023-10-17T09:29:27-0500

DOUGLAS E WEAVER

2023-10-17T06:37:26-0500

CHUNSEI LEE FARREN

FILTER

CCHC

SENSOR

TEMPERATURE

SECONDS (ADJ.), AN ALARM MUST BE SENT TO THE BAS.

IF THE FAN STATUS DOES NOT PROVIDE PROOF OF OPERATION WHEN COMMANDED TO RUN AFTER 30 ·

BAS ALARM:

THE CHILLED WATER VALVE MUST BE COMMANDED CLOSED. ·

THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED OFF.·

UPON A FALL IN SPACE TEMPERATURE TO THE UNOCCUPIED SETPOINT 78F (ADJ.)

MODULATE CHILLED WATER VALVE TO MAINTAIN THE SPACE TEMPERATURE AT UNOCCUPIED SETPOINT. ·

THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED ON. ·

UPON A RISE IN SPACE TEMPERATURE ABOVE THE UNOCCUPIED SETPOINT 78F (ADJ.)

UNOCCUPIED COOLING MODE:

THE HOT WATER VALVE MUST BE COMMANDED CLOSED·

THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED OFF.·

UPON A RISE IN SPACE TEMPERATURE TO THE UNOCCUPIED SETPOINT 66F (ADJ.)

MODULATE HOT WATER VALVE TO MAINTAIN THE SPACE TEMPERATURE AT UNOCCUPIED SETPOINT. ·

THE FAN COIL UNIT SUPPLY FAN MUST BE COMMANDED ON. ·

UPON A FALL IN SPACE TEMPERATURE BELOW THE UNOCCUPIED SETPOINT 66F (ADJ.)

UNOCCUPIED HEATING MODE:

THE MINIMUM DEADBAND MUST BE 5F (ADJ.).

TEMPERATURE OCCUPIED SETPOINT 75F (ADJ.)

COOLING MODE: THE BAS MUST MODULATE THE CHW CONTROL VALVE TO MAINTAIN THE SPACE

TEMPERATURE OCCUPIED SETPOINT 70F (ADJ.)

HEATING MODE: THE BAS MUST MODULATE THE HW CONTROL VALVE TO MAINTAIN THE SPACE

FAN OPERATION: UPON A CALL FOR HEATING/COOLING, THE FAN MUST BE ENERGIZED.

OCCUPIED MODE:

THROUGH BAS WITH MANUAL OVERRIDE.

FAN COIL UNITS FCU-609 SERVE THE DEBRIEFING ROOM. THE OPERATIONAL MODE MUST BE DETERMINED

GENERAL:

SEQUENCE OF OPERATION:

TAG DESCRIPTION

SPACE TEMPERATURE

SUPPLY AIR TEMPERATURE

SUPPLY FAN START/STOP

SUPPLY FAN STATUS

SUPPLY FAN FAILURE

CHILLED WATER FCV

HOT WATER FCV

AI AO DI DO REMARK

XFILTER

DP

STATUS

START/STOP

ALARM

CC

DX

HEAT

ELECTRIC

EXISTING.

POINT LIST MATCHING

FACILITY TO MONITOR THE

COORDINATE WITH THE 1.

:NOTES

OA

SD

FZ

FREEZESTAT

TEMPERATURE SENSOR

SA SA

RETURN AIR SMOKE DETECTOR

SAT

RAT

MAT

MAO MAO

AI

DO

T AI T AI T AI

DI

STATUS

START/STOP

ALARM

I

SAT

MDO M DO

DRAIN

CONDENSATE

DICD

DRAIN

CONDENSATE

DICD

CONTROL FUNCTION SCHEDULE

FAN COIL UNIT CONTROL DIAGRAM

M019

AIR HANDLER CONTROL DIAGRAM

M019

NC NC

lo tt e

12/08/2022

GRR-1701255-M119

MECHANICAL CONTROLS

SEQUENCE OF OPERATIONS

THIS DRAWING PRODUCED ON THE AGL REGION MICROSTATION SYSTEM

grr-1701255-m119

2023-10-17T09:29:47-0500

DOUGLAS E WEAVER

2023-10-17T06:37:45-0500

CHUNSEI LEE FARREN

SYMBOL

TRAPSUPPLY

SIZETYPEMANUFACTURER MANUFACTURER TYPEMODEL FAUCET

C.W H.W.

CARRIER

MOUNTED

WASTE (MIN)

PLUMBING FIXTURE SCHEDULE

FITTINGFIXTURE

McGUIRE N/A N/A

#8912 1-1/2" P-TRAP 1-1/2"1/2" 1/2"P-1

SINK-HAND

ELKAY LUSTERTONE LR1517 8" FAUCET CENTERS

FULLY UNDERCOATED

SELF RIMMING

STAINLESS STEEL

CENTER MOUNTED

MANUALLY OPERATED

5-1/4" RIGID GOOSENECK

CHICAGO- #210-AGN2AE3

#LFH-2165

STRAINER

#151 BASKET

PLUMBING LEGEND & ABBREVIATION

SYMBOL

COLD WATER

HUB DRAIN

PIPE TURNED UP

PIPE TURNED DOWN

CAP ON PIPE

CD

DESCRIPTION ABBREVIATION DESCRIPTION

P-1 FIXTURE IDENTIFICATION

HOT WATER

ABV

BLW

CLG

CONN

CONT

CW

(E)

FLR

(ETBR)

(ETR)

ABOVE

BELOW

CONNECT

CONTINUATION

COLD WATER

DOWN

HW

RUN PIPING CONCEALED AND CLEAR OF CEILING INSERTS, UNLESS SPECIFIED OTHERWISE.32.

PROHIBITED UNLESS OTHERWISE INDICATED.

ALL PIPING MUST BE INSTALLED AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE 31.

PIPING MUST NOT RUN OVER ELECTRIC PANELS.30.

AIR ADMITTANCE VALVES MUST BE INSTALLED IN A VERTICAL ORIENTATION.29.

HORIZONTAL BRANCH DRAIN.

AIR ADMITTANCE VALVES MUST BE LOCATED IN AN ACCESSIBLE LOCATION A MINIMUM OF 4" ABOVE THE 28.

ON CEILING TILES OR CEILING STRUCTURE.

ALL PIPING ABOVE GRADE MUST BE PROPERLY SUPPORTED BY THE BUILDING STRUCTURE AND MUST NOT REST 27.

ON PIPING.

PROVIDE CLAMPS, OFFSETS, EXPANSION JOINTS, ANCHORS AND GUIDES AS NECESSARY TO PREVENT STRESS 26.

ALL PIPE PENETRATIONS BELOW SINKS MUST BE SEALED.25.

THOUGH ALL BRANCH MAINS, ELBOWS AND CONNECTIONS ARE NOT SHOWN.

MAKE PROPER WASTE, VENT, HOT AND COLD WATER CONNECTIONS TO ALL FIXTURES AND EQUIPMENT, EVEN 24.

DISCHARGE FROM AN ICEMAKER OR CONDENSATE MUST BE INSULATED.

ALL HORIZONTAL DRAINAGE PIPING AND TRAPS FROM AN OPEN SIGHT DRAIN OR RECEPTOR RECEIVING 23.

SERVICING AND/OR REMOVAL WITHOUT DISCONNECTING ALL PIPING AND ACCESSORIES.

ALL PIPING VALVES AND ACCESSORIES SERVING EQUIPMENT MUST BE INSTALLED IN A MANNER AS TO ALLOW 22.

IDENTIFICATION. PIPING MUST BE LABELED TO IDENTIFY CONTENTS AND DIRECTION OF FLOW.

ALL PIPING, EQUIPMENT, AND VALVES MUST BE IDENTIFIED IN A MANNER THAT ALLOWS FOR EASY 21.

ACCEPTANCE.

UNLESS NOTED OTHERWISE, GUARANTEE ALL PARTS AND LABOR FOR ONE YEAR FROM DATE OF FINAL 20.

MEET ALL OTHER TRADE CLEARANCE REQUIREMENT.

STRUCTURAL, CIVIL, AND GENERAL ARCHITECTURE. THIS MUST INCLUDE PROVIDING SUFFICIENT SPACE TO

TRADES INCLUDING, BUT NOT LIMITED TO, ELECTRICAL, HVAC, PLUMBING, FIRE PROTECTION, TELECOM, IT WILL BE THE RESPONSIBILITY OF THIS CONTRACTOR TO COORDINATE THEIR WORK WITH THAT OF ALL OTHER 19.

A DIELECTRIC UNION MUST BE USED TO JOIN ANY DISSIMILAR MATERIALS.18.

CODE.

PLUMBING CONTRACTOR MUST DISINFECT POTABLE WATER SYSTEM PER THE LOCALLY ADOPTED PLUMBING 17.

372.

WATER FOR DRINKING OR COOKING PURPOSES MUST BE LEAD FREE MEETING THE REQUIREMENTS OF ANSI

ALL PIPE, PIPE FITTINGS, JOINTS, VALVES, FAUCETS, SUPPLIES, AND FIXTURE FITTINGS UTILIZED TO SUPPLY 16.

ACCESSORIES IS PROHIBITED.

QUALITY. THE REUSE OF EXISTING FIXTURES, MATERIALS, EQUIPMENT AND ASSOCIATED COMPONENTS AND

UNLESS OTHERWISE NOTED, ALL PLUMBING FIXTURES, VALVES, PIPING, INSULATION, ETC MUST BE FIRST 15.

CONTRACTOR MUST NOTIFY THE ENGINEER PRIOR TO STARTING WORK.

CONFLICT EXISTS BETWEEN THE DESIGN DOCUMENTS AND MANUFACTURER'S REQUIREMENTS, THIS

PRIOR TO STARTING WORK. ALL WORK MUST ADHERE TO THE MANUFACTURERS' REQUIREMENTS. IF A

REVIEW ALL APPLICABLE MANUFACTURERS' INSTALLATION AND MAINTENANCE DOCUMENTS/REQUIREMENTS 14.

PRODUCT INSTALLATION MUST ADHERE TO MANUFACTURER'S RECOMMENDATIONS.13.

OF RECORD FOR APPROVAL.

PERFORMANCE AND MATERIALS. SUBMIT LITERATURE FOR ALL EQUIPMENT AND MATERIALS TO THE ENGINEER

MANUFACTURER'S MODEL NUMBERS ARE SPECIFIED SOLELY TO ESTABLISH STANDARDS OF QUALITY FOR 12.

COMPLETE INSTALLATION.

FURNISH ANY MISCELLANEOUS ITEMS NORMALLY USED, SPECIFICALLY MENTIONED OR NOT, TO RENDER A 11.

LISTED ASSEMBLY AND PROVIDE SLEEVE WHERE REQUIRED.

SEAL ALL EXISTING AND NEW FLOOR/ROOF/WALL PENETRATIONS AS REQUIRED TO MAINTAIN INTEGRITY OF 10.

EXISTING OR AS REQUIRED BY ARCHITECTURAL DRAWINGS.

OPEN EXISTING WALLS AS REQUIRED FOR DEMOLITION AND INSTALLATION WORK. PATCH WALLS TO MATCH 9.

STRUCTURAL ENGINEER'S REVIEW AND APPROVAL.

STRUCTURAL COMPONENTS MUST NOT BE CUT, DRILLED OR MODIFIED IN ANY MANNER WITHOUT THE 8.

VERIFY SIZES, LOCATIONS, INVERTS AND ELEVATIONS PRIOR TO RUNNING ANY PIPING.7.

COORDINATION WITH ALL OTHER TRADES.

INCLUDE, BUT NOT BE LIMITED TO, OFFSETTING EXISTING PIPING AND MODIFICATIONS REQUIRED FOR

NECESSARY MODIFICATIONS TO EXISTING CONDITIONS TO PERFORM WORK OF THIS SECTION. THIS MUST

LOCATIONS OF EXISTING SYSTEMS/UTILITIES IN FIELD, WHETHER OR NOT SHOWN ON DRAWINGS. MAKE ALL

ACCURACY NOR COMPLETION OF LOCATIONS SHOWN ON DRAWINGS IS GUARANTEED. DETERMINE EXACT

ALL EXISTING CONDITIONS SHOWN ARE TAKEN FROM EXISTING DRAWINGS AND FIELD SURVEYS. NEITHER 6.

WORK INVOLVED.

MANAGER AND THE OWNER'S REPRESENTATIVE AND MUST BE RESOLVED PRIOR TO THE INSTALLATION OF THE

WHICH IS IN VIOLATION OF SUCH CODES MUST BE BROUGHT TO THE ATTENTION OF THE CONSTRUCTION

NO WORK WILL BE INSTALLED IN VIOLATION OF ANY GOVERNING CODES. ANY WORK SHOWN ON THE DRAWINGS 5.

STRINGENT MUST GOVERN.

ALL APPLICABLE STATE AND LOCAL CODES, RULES AND REGULATIONS. IN CASE OF DIFFERENCES THE MOST

ALL PLUMBING WORK MUST BE IN ACCORDANCE WITH THE BUILDING CODE INCLUDING ALL SUPPLEMENTS AND 4.

BECOME THOROUGHLY FAMILIAR WITH ALL OF THE REQUIREMENTS OF THE CONTRACT.

CONNECTING THE APPARATUS, THE MEANS TO BE PROVIDED FOR GETTING THE EQUIPMENT INTO PLACE, AND

PREMISES AND ANY EXISTING WORK. DETERMINE, IN ADVANCE, THE METHODS OF INSTALLING AND

BEFORE SUBMITTING A BID CAREFULLY STUDY THE CONSTRUCTION DOCUMENTS. CAREFULLY EXAMINE THE 3.

DIMENSIONS AND EXACT LOCATION OF PLUMBING EQUIPMENT.

SYSTEM COMPONENTS. DO NOT SCALE THESE DRAWINGS. CONSULT ARCHITECTURAL PLANS FOR PROPER

THESE DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO DEPICT THE GENERAL LOCATION OF PLUMBING 2.

SPECIFICATIONS, SYMBOLS LIST, ABBREVIATIONS AND DETAILS ARE APPLICABLE TO ALL DRAWINGS MARKED P.1.

PLUMBING GENERAL NOTES:

PLUMBING DEMOLITION NOTES:

ADVANCE OF ANY AND ALL UTILITY/SYSTEM SERVICE INTERRUPTIONS.

THIS CONTRACTOR MUST NOTIFY AND COORDINATE WITH THE RESIDENT ENGINEER IN WRITING 10 DAYS IN 5.

AND CAP AT NEAREST VALVE OR MAIN LINE.

FLOOR, ABOVE CEILING AND/OR IN WALLS AS REQUIRED. REMOVE ALL PIPING NOT REQUIRED FOR RENOVATION

UNLESS OTHERWISE NOTED, CAP AND CONCEAL ALL SANITARY, VENT, MEDICAL GAS, AND WATER PIPING BELOW 4.

NOTIFY THE ARCHITECT/ENGINEER PRIOR TO PROCEEDING WITH DEMOLITION.

WHERE DEMOLITION WOULD AFFECT THE STRUCTURAL INTEGRITY OF THE BUILDING, THE CONTRACTOR MUST 3.

EQUIPMENT INDICATED TO REMAIN.

DEMOLITION MUST BE PERFORMED IN SUCH A MANNER THAT WILL NOT DAMAGE ADJOINING SURFACES OR 2.

OR OTHER EQUIPMENT REQUIRING PLUMBING.

REQUIRED TO BE REMOVED IN PREPARATION FOR INSTALLATION OF NEW CONSTRUCTION, SPECIFIED FIXTURES

FOLLOWING: REMOVAL OF TRIM, SUPPLIES, TRAPS, VALVES, RELATED PIPING, ETC. THAT MIGHT REASONABLY BE

RENOVATED CONSTRUCTION WHETHER OR NOT SPECIFICALLY NOTED AND INCLUDING BUT NOT LIMITED TO THE

PLUMBING CONTRACTOR MUST PROVIDE ALL DEMOLITION INCIDENTAL TO OR REQUIRED FOR NEW AND

SPECIFIC DEMOLITION NOTES ARE NOT TO BE CONSIDERED ALL INCLUSIVE OR COMPLETE IN THEMSELVES. THE 1.

AAV AIR ADMITTANCE VALVE

lo tt e

-p

GRR-1701255-P101

PLUMBING LEGEND, NOTES AND SCHEDULES

grr-1701255-p101

2023-10-17T09:30:05-0500

DOUGLAS E WEAVER

2023-10-17T06:37:59-0500

CHUNSEI LEE FARREN

DRAIN PIPING DROP FROM CD DRAIN IN FLR ABV FOR AHU-2(ETR)

DRAIN PIPING DN TO FLR BLW IN BLOCK WALL(ETR)

COORD W/ DEEP BEAM, 11" OF CLEAR SPACE (TYP)

(ETR) DRAIN PIPING

CW PIPING(ETR)

(ETBR) 1/2" CAPPED CW

1/2" CW/HW, PREPARE PIPE ENDS FOR RECONN(ETR)

(ETR) 2" SAN, PREPARE PIPE END FOR RECONN

(ETBR) PLBG ROUGH-IN

(ETBR) CD DROP FROM AHU-1 ON FLR ABV

(ETBR) CD DROP TO HUB DRAIN

(ETBR) HUB DRAIN IN FLOOR

COORD W/ DEEP BEAM, 11" OF CLEAR SPACE (TYP)

DRAIN PIPING DROP FROM CD DRAIN IN FLR ABV FOR AHU-2(ETR)

DRAIN PIPING DN TO FLR BLW IN BLOCK WALL(ETR)

EXTEND 3/4" CD TO FCU-609

CW PIPING(ETR)

DRAIN PIPING(ETR)

CONN 3/4" CD TO (E) DRAIN PIPING

VERTICAL ABV CLG LEVEL

CAP 1/2" CW IN

1/2" CW/HW(ETR)

2" SAN(ETR)

EXTEND 1/2" CW/HW & 2" TO P-1

AAV

3/4" CD DROP FROM AHU-1 ON FLR ABV

WF

TILE

CARPET

P-1 lo tt e

GRR-1701255-P102

PLUMBING SIXTH FLOOR PLAN -

PLUMBING SIXTH FLOOR PLAN - DEMOLITION

P002

PLUMBING SIXTH FLOOR PLAN - NEW CONSTRUCTION

P002

ADJUST EXISTING PLUMBING TO ACCOMMODATE REVISED WATER COOLER LOCATION.

CEILING LEVEL. PIPING SHALL BE REMOVED TO A LEVEL ABOVE THE PROPOSED CEILING AND CAPPED.

THE EXISTING 1/2" CAPPED COLD WATER PIPE IS CURRENTLY LOCATED BELOW THE PROPOSED

ASSEMBLY.

MAIN/BRANCH AND CAP. PATCH 6TH FLOOR TO MATCH EXISTING, MAINTAIN INTEGRITY OF LISTED

REMOVE HUB DRAIN PIPING IN 5TH FLOOR CEILING SPACE. REMOVE PIPING BACK TO NEAREST ACTIVE

PLUMBING FIXTURE AND CABINETRY HAS BEEN DEMOLISHED.

DEMOLITION WITHIN THE SCOPE OF WORK HAS BEEN PARTIALLY COMPLETED. THE EXISTING

MAINTENANCE/REPLACEMENT.

LOCATE AIR ADMITTANCE VALVE IN CABINET, ENSURE VALVE IS ACCESSIBLE FOR

grr-1701255-p102

2023-10-17T09:30:23-0500

DOUGLAS E WEAVER

2023-10-17T06:38:13-0500

CHUNSEI LEE FARREN

lo tt e

-a

1 2 3

UTILITYHALL

AF MANAGER'S

CONFERENCE 2

CONFERENCE 1

AF MANAGER'S

CONFERENCE 2

CONFERENCE 1

GRR-1701255-A101

3RD FLOOR PLAN, EXISTING AND NEW WORK

KEYNOTES

(DEMOLITION)

NEW DOOR.

SAW CUT MASONRY WALL TO PROVIDE A 3'-4" X 7'-4" ROUGH OPENING FOR

(NEW WORK)

DETAILS 8 AND 9 ON SHEET A007.

INSTALL STEEL ANGLES AT HEAD OF NEW MASONRY OPENING. REFER TO

KEYNOTES ARE NOT SHOWN ON THIS SHEET, THEN NO WORK INTENDED.

SHEET FOR WORK TO BE ACCOMPLISHED FOR THIS PROJECT. IF THE

UNLESS DESIGNATED BY A KEYNOTE. REFER TO THE KEYNOTES ON THIS

STRICTLY FOR INFORMATION ONLY. NO WORK IS INTENDED TO BE DONE

ALL ITEMS IDENTIFIED ON THE FLOOR PLAN DRAWING ARE SHOWN

3 PATCH WALL AND FLOOR FINISHES TO MATCH EXISTING

REFER TO DETAILS 5, 6 AND 7 ON SHEET A006.

INSTALL NEW SOLID CORE WOOD DOOR, HM FRAME, AND HARDWARE.

EXISTING 3RD FLOOR PLAN

A001

3RD FLOOR PLAN - NEW WORK

A001 grr-1701255-a101

2023-10-17T09:23:27-0500

DOUGLAS E WEAVER

2023-10-17T06:30:54-0500

CHUNSEI LEE FARREN

EQUIPMENT

J

IC

FDIO

IN

CODEX

MODEM

RACK

MODEM UPS

ASR-9 SCIP AND

(UNDER POWER PANELS) P

RCDR

B2

(FRONT)

NEW

FRAME

SECURITY

GATE

SUSPENDED

COAX JUNCTION BOX

LADDER

ADJACENT TO CABLE

FROM CEILING

IL

CABINET

COMPU AIRE SYS-

TEMP / HUMIDIFIER

COMPU AIRE SYS-TEMP / HUMIDIFIER

WORK BENCH

DESK

SWITCHES

MOTOR CNTL

(WALL MOUNTED)

DIGITAL

BOOK CASE

PRINT

TABLE

COMPU AIRE

BLADDER

COMM

MONITOR

WSP

WSP

WAS

EQUIP

LL

EQUIPMENT

lo tt e

GRR-1701255-A102

5TH FLOOR PLAN, EXISTING AND NEW WORK

4' 8'04'

REPLACING WITH NEW CARPET TILE.

TILE WAS PRESENT, TO BE PROPERLY ABATED BEFORE

DESIGNATES SCOPE OF WORK AREA WHERE ASBESTOS

TO BE IMPLEMENTED PRIOR TO PROCEEDING.

DEMOLITION WORK. COORDINATE WITH R.E. FOR CORRECTIVE MEASURES

MATERIAL MUST BE ABATED PRIOR TO PROCEEDING WITH ANY OTHER

ASBESTOS MATERIAL IS PRESENT IN FLOORING MATERIAL. ALL HAZARDOUS

WHERE ASBESTOS TILES WERE REMOVED.

INSTALL "ESD" CARPET TILES TO MATCH EXISTING OVER THOSE AREAS

LEGEND

EXISTING 5TH GROUND FLOOR PLAN

A002

EXISTING 5TH GROUND FLOOR PLAN - NEW WORK

A002 grr-1701255-a102

2023-10-17T09:23:45-0500

DOUGLAS E WEAVER

2023-10-17T06:32:38-0500

CHUNSEI LEE FARREN

3 3

3 3

TV

lo tt e

GRR-1701255-A103

6TH FLOOR PLAN, EXISTING AND NEW WORK

REMOVE EXISTING CMU WALL AS INDICATED.1

AND OPENING. REFER TO DETAILS 7, 8 AND 9 ON SHEET A007.

WALL UP TO UPPER FLOOR SLAB TO PROVIDE FOR NEW CMU WALL

REMOVE EXISTING DOOR AND FRAME, REMOVE PARTIAL PART OF

WITH CLEAR DOUBLE PANE GLAZING)

REMOVE EXISTING FROSTED WINDOW GLAZING (TO BE REPLACED

INSTALL NEW CARPET TILE

DOOR SCHEDULE SHEET A006

INSTALL NEW DOOR, DOOR FRAME AND DOOR HARDWARE, REFER TO

REQUIRED.

TO PLUMBING FOR FAUCET MODEL AND ELECTRICAL FOR POWER

INSTALL NEW CABINETS AND SINK WITH GOOSENECK FAUCET. REFER

MATCH EXISTING FRAME SIZE. INSTALL IN EXISTING FRAMES.

INSTALL NEW CLEAR DOUBLE PANE LOW E WINDOW GLAZING TO

AND 09 ON SHEET A007.

FOR NEW OPENING. REFER TO DETAIL 03 ON SHEET A006 AND 07, 08

MATCH EXISTING CMU WALL UP TO FLOOR SLAB ABOVE TO PROVIDE

END CLOSURE CAPS AROUND OPENING.

PROVIDE OPENING 7 FT TALL TO ENTRY HALL USE STAINLESS STEEL

7 PROVIDE NEW THRESHOLD AT FLOOR.

A006

4,5,6

A005

CONFIGURATION.

SYMBOL IMPLIES WALL TYPE, REFER TO SHEET A007 FOR WALL TYPE

FOR NEW CMU OPENING

EXISTING WATER FOUNTAIN TO REMAIN. RELOCATE AS REQUIRED

WALL BETWEEN DOOR JAMB AND WINDOW JAMB.

FOR OUTLET AND MOUNT WITH COTR. CENTER ON PRESENTATION

REINFORCEMENT FOR TV MOUNT AS REQUIRED. VERIFY HEIGHTS

INSTALL NEW POWER OUTLET TO TV MONITOR. PROVIDE

EXISTING 6TH FLOOR PLAN

A003

EXISTING 6TH FLOOR PLAN - NEW WORK

A003

SCOPE OF WORK:

1. FIELD VERIFY FOR EXACT SCOPE OF WORKS.

2. REMOVE FLOOR CARPET TILES, VINYL BASE,

METAL FURRING CHANNELS, INNER GYPSUM WALL

PANELS, CEILING TILES, CEILING GRIDS AND NON

FUNCTIONAL PIPES, CONDUITS, DUCTS, ETC.

ABOVE CEILING.

3. REMOVE ALL TRANSLUCENT GLASS PANELS AND

VENTS IN EXTERIOR WINDOWS AND REPLACE WITH

MATCHING CLEAR GLASS PANELS.

4. PROVIDE METAL FURRING CHANNELS, GYPSUM

DRYWALL PANELS AND

grr-1701255-a103

2023-10-17T09:24:05-0500

DOUGLAS E WEAVER

2023-10-17T06:33:01-0500

CHUNSEI LEE FARREN

2 2 2 lo tt e

GRR-1701255-A104

6TH FLOOR PLAN RCP PLAN

NEW (2' X 2') LED LIGHT FIXTURE INSTALLATION

SPECIFICATIONS.

FLOOR SLAB TO BE AT 7'-10" HT AND IN ACCORDANCE W/

INSTALL NEW 2' X 2' GRID AND CEILING PANELS…