Meeks Mesa Campground Construction
Closed Solicitation Posted
- Solicitation number
- 1240LT26Q0033
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Utah, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service is soliciting construction services for the Meeks Mesa Campground and Trailhead project located at Fishlake National Forest in Utah under solicitation number 1240LT26Q0033. The base bid work includes removal and disposal of vegetation, construction of new asphalt roads with striping and crosswalks, widening of State Route 24 with pavement and culvert extensions, construction of concrete and aggregate family unit campsites with tent pads, installation of precast concrete vault restrooms, shelter structures, signage, rockery retaining walls, drainage swales, post and pole fencing, and miscellaneous site furnishings and improvements. The contract will be awarded on a firm fixed-price basis using lowest-price technically acceptable criteria, with evaluation focusing on technical acceptability and past performance as documented in CPARS records and USDA contract history. Offerors must submit detailed project management and staffing plans demonstrating capability to meet all requirements and must provide quotations addressing all line items to be considered responsive. The deadline for submitting questions is April 20, 2026 at 3:00 PM Mountain Time, sealed offers are due by April 27, 2026 at 3:00 PM local time, and the government requires a 90-calendar-day acceptance period for all offers.
This solicitation is designated as a total small business set-aside under NAICS code 237990 (Other Heavy and Civil Engineering Construction) with a small business size standard of $45.0 million, with no identified incumbent contractors. The project encompasses construction of 28 total campsites (25 single sites and 2 double sites), 1 group site accommodating 30 people, 1 host unit, and a trailhead parking area, with base bid work requiring 180 calendar days for completion beginning June 1, 2026 and ending May 31, 2027. Bid options are available for native surface trail construction (1,005 linear feet), berm and boulder cluster installation (11 clusters), and colored asphalt with mix additive (45 tons). The contractor must commence performance within 15 calendar days of receiving notice to proceed and must provide performance and payment bonds within 15 calendar days after award, with a bid guarantee of 20 percent of the bid price (not to exceed $3 million) required at submission. Performance will take place in Utah, specifically at Fishlake National Forest in the Fremont River Ranger District, approximately 21 miles east of Loa, with the administering office located in Ogden, Utah.
Notice text
- This project includes the construction of the Meeks Mesa Campground and Trailhead.
- The base bid work includes:
- Removal and disposal of existing vegetation that is affected by new construction.
- Constructing new asphalt roads and spurs with line striping and crosswalk hatch.
- Widening state route 24 to include pavement, lane striping and culvert extensions.
- Constructing new concrete group site, concrete family units, aggregate family units, tent pads and installing new campground site furniture.
- Installing new family unit shelters and group site shelter.
- Installing new single and double precast concrete vault restrooms.
- Installing directional and regulatory signs, road closure gates, dumpster pad with enclosure wall, unit markers, bulletin board with fee tube, barrier rocks, concrete and aggregate surface paths.
- Constructing rockery retaining walls.
- Constructing drainage swales.
- Constructing post and pole fencing.
- Constructing a major site I.D. sign with stone base and minor site I.D. sign.
- Bid Options work includes:
- Constructing native surface trails.
- Constructing berm and boulder cluster pods.
- Coloring asphalt with mix additive.
- Quantities associated with these options are identified in the Schedule of Items.
- The base bid work includes:
Files
| File | Type | Posted |
|---|---|---|
| Revised MeeksMesa.SOI.Final_04.17.2026.xlsx | XLSX spreadsheet | |
| 1240LT26Q0033.pdf | ||
| MeeksMesa.SOI.Final_01.21.2026.xlsx | XLSX spreadsheet | |
| MeeksMesa.Specs SOW.docx | DOCX document | |
| Wage Determination Wayne County Utah.pdf | ||
| MeeksMesa.Dwgs.Final-01.21.2026.pdf | ||
| Solicitation.docx | DOCX document |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| Stove Prairie Campground Gate Replacement | Forest Service | Total Small Business | |
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| GAOA Brainard Lake Recreation Area Deferred Maintenance | Forest Service | Total Small Business | |
| Camptonville Housing Decommissioning | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity