MDI Non Spool Based Products - M11, M14, M15, M652
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W15QKN-20-R-0050
- Agency
-
ACC Picatinny
Army Contracting Command, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 325920 Explosives Manufacturing
- PSC
- 1375 Demolition Materials
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals for the production, testing, packaging and delivery of four types of non-spool based munitions assemblies: the M11 Blasting Cap Assembly, M14 Blasting Cap Assembly with 5 minute time fuse delay, M15 Blasting Cap Assembly with 25ms and 200ms delay shock tubes, and M652 Dummy Booster Assembly with 30 feet of inert detonating cord. The United States Army on behalf of the Project Manager Close Combat Systems is conducting a competitive 100% full and open solicitation utilizing a trade-off best value source selection methodology to evaluate proposals. Proposals must be submitted no later than February 3, 2021 to the Army Materiel Command Contracting Command located at Picatinny Arsenal.
There is no set-aside designation. The main NAICS code is 335912 and PSC code is 1457. The potential award value ranges from $1,875,000 to $37,500,000 over a five year period of performance. Annual production quantities are specified by range for the M11, M14, M15, and M652 assemblies. The place of performance will be at the contractor's manufacturing facility where the munitions will be produced, tested, packaged and delivered.
Notice text
8 versions
Update #8 · Latest ·
Amendment 0006 - This amendment provides responses to questions from industry.
Amendment 0005 - This amendment provides responses to questions from industry and revises CLIN 3012 to better reflect the Government's intent.
Amendment 0004 - This amendment extends the date for submission of proposals by 7 days to 2 PM EST 3 February 2021.
Amendment 0003 - To update the Contract Specialist Point of Contact information. To add Drawing 13042752 - Indicator label as attachment 0027.
Amendment 0002 - (1) To extend the deadline for past performance questionnaires from 30 days to 40 days. (2) include Attachment 0026 MDI Questions. (3) extend the date for submission of proposals by 15 days to 2PM EST 27 January 2021.
Amendment 0001 - To include Attachment 0025 MIL-DTL-32641
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #7 ·
Amendment 0005 - This amendment provides responses to questions from industry and revises CLIN 3012 to better reflect the Government's intent.
Amendment 0004 - This amendment extends the date for submission of proposals by 7 days to 2 PM EST 3 February 2021.
Amendment 0003 - To update the Contract Specialist Point of Contact information. To add Drawing 13042752 - Indicator label as attachment 0027.
Amendment 0002 - (1) To extend the deadline for past performance questionnaires from 30 days to 40 days. (2) include Attachment 0026 MDI Questions. (3) extend the date for submission of proposals by 15 days to 2PM EST 27 January 2021.
Amendment 0001 - To include Attachment 0025 MIL-DTL-32641
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #6 ·
Amendment 0004 - This amendment extends the date for submission of proposals by 7 days to 2 PM EST 3 February 2021.
Amendment 0003 - To update the Contract Specialist Point of Contact information. To add Drawing 13042752 - Indicator label as attachment 0027.
Amendment 0002 - (1) To extend the deadline for past performance questionnaires from 30 days to 40 days. (2) include Attachment 0026 MDI Questions. (3) extend the date for submission of proposals by 15 days to 2PM EST 27 January 2021.
Amendment 0001 - To include Attachment 0025 MIL-DTL-32641
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #5 ·
Amendment 0003 - To update the Contract Specialist Point of Contact information. To add Drawing 13042752 - Indicator label as attachment 0027.
Amendment 0002 - (1) To extend the deadline for past performance questionnaires from 30 days to 40 days. (2) include Attachment 0026 MDI Questions. (3) extend the date for submission of proposals by 15 days to 2PM EST 27 January 2021.
Amendment 0001 - To include Attachment 0025 MIL-DTL-32641
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #4 ·
Amendment 0002 - (1) To extend the deadline for past performance questionnaires from 30 days to 40 days. (2) include Attachment 0026 MDI Questions. (3) extend the date for submission of proposals by 15 days to 2PM EST 27 January 2021.
Amendment 0001 - To include Attachment 0025 MIL-DTL-32641
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #3 ·
Amendment 0001 - To include Attachment 0025 MIL-DTL-32641
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #2 ·
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages (TDP) see RFP Section A. Note, The TDP Attachments 0001-0004 and 0023, and Hazard Classification Documents Attachments 0010-0013 are Limited Distribution and were not included in this posting. They will be provided upon request, provided the requestor meets the requirements as stated in Section A.
All proposals shall be submitted no later than the time and date indicated.
Update #1 ·
The United States Army on behalf of the Project Manager Close Combat Systems (PM CCS) has a requirement for the production, testing, packaging and delivery of CAP, BLASTING: non-electric, 30 ft. shock tube, M11 (M11 Blasting Cap Assembly/M11 Assembly); CAP, BLASTING: non-electric, 5 minute time fuse delay, M14 (M14 Blasting Cap Assembly/M14 Assembly); CAP, BLASTING: non-electric, 25ms and 200ms delay, 70 ft. shock tube, M15 (M15 Blasting Cap Assembly/M15 Assembly); and DUMMY BOOSTER, DEMOLITION CHARGE: non-electric, 30 ft. inert detonating cord, M652 (M652 Dummy Booster Assembly/M652 Assembly).
This is a competitive 100% full and open solicitation. Award shall be made to the offeror whose proposal is the best value to the Government utilizing a trade-off source selection methodology.
See attached Request for Proposal (RFP) for additional information and proposal submission instructions.
To request a copy of the Technical Data Packages see RFP Section A.
All proposals shall be submitted no later than the time and date indicated.
Files
Show all 28
Notice history
| Notice | Type | Posted |
|---|---|---|
| MDI Non Spool Based Products - M11, M14, M15, M652 | Award Notice | |
| This notice | Solicitation | |
| MDI Non Spool Based Products - M11, M14, M15, M652 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 1355 - 01-620-4752 cwrt dispenser assembly, wire, MK8 MOD 3 | Naval Supply Systems Command | No set-aside | |
| 1356 - 1356-01-106-5985; WW98; Initiating Propellant; DWG: 2508738 REV AA | Naval Supply Systems Command | No set-aside | |
| MD92: ME35: ME34/MT61: MT57: MT58: MT65: MD89 | Naval Supply Systems Command | No set-aside | |
| MJU-76/B Flare, Countermeasure | AFLCMC Hill AFB | No set-aside | |
| 155mm Modular Artillery for Combat Effectiveness (MACE) | ACC Picatinny | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity