Attachment 0026 MDI Questions.pdf
PDF 164 KB Posted
- Solicitation number
- W15QKN-20-R-0050
About this file
This document contains questions and responses related to technical data packages for non-spool based munitions products required by the U.S. Army, including the M11, M14, M15 and M652 assemblies. The responses clarify requirements for markings, components, quantities per crate, and drawings. An extension to the past performance questionnaire deadline was granted to allow sufficient time for responses. Additionally, the receipt date for proposals in response to solicitation number W15QKN-20-R-0050 was extended to 27 January 2021. This competitive solicitation from the Department of the Army Materiel Command Contracting Command Picatinny Arsenal seeks the production, testing, packaging and delivery of the specified munitions assemblies.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDI Questions as of 12/09/2020
M14 Questions
1. The M14 assembly specifically calls out 5 consecutive single tic marks for a 5‐minute burn time delay. The assembly also calls out M700 safety fuse, which is marked as follows for a five‐minute burn time: Double mark, 4 single marks, double mark. Please clarify which marking scheme is required?
Response: Refer to Drawing 13028635, Notes 2, 4 and 5 for marking requirements.
2. M7 Blasting caps are included in the data package but not part of the final assembly. Please clarify how these are to be used or incorporated into the final assembly for the M14.
Response: The M7 Blasting Cap is not used on the M14 Assembly. Per Drawing 13028635, the correct Blasting Cap is 13026127‐2, which has its’ requirements specified on drawing 13026127.
3. There are conflicting references in the TDP to 40 each and 60 each assemblies per crate. Please clarify which is correct.
Response: Each Crate/Wood Box contains a total of 40 M14 Assemblies (4 x 10 each). This is specified on drawing 13023563 and 12988007.
M15 Questions
1. Please provide the complete drawing package for the M15. At a minimum please provide the drawings for the low and high output caps.
Response: The M15 requirements are stated in QAA‐1425. The (performance) requirements for Low and High Output Caps are stated in paragraphs 3.2.1.2.1, 3.2.1.2.1.1, 3.2.1.2.2, and 3.2.1.2.2.1.
2. Please provide the number of M15 units packed in each crate.
Response: Each Crate/Wood Box contains a total of 60 M15 Assemblies. This is specified in
Section 5 of QAA‐1425.
3. Please clarify the coil layout for the M15. Specifically, where is the J‐Hook positioned in the coil.
Response: The M15 does not contain a J‐Hook. The M15 contains a Holder. The low strength cap is secured into the holder. Refer to QAA‐1425, paragraph 3.2.1.
Past Performance Questions
1. We are requesting an extension to the deadline for past performance questionnaires to allow sufficient time for our major subcontractors to respond.
Response: Receipt date for past performance questionnaires has been extended from
30 days to 40 days.
General Questions
1. Due to the upcoming holiday season and other information needed to develop a compliant proposal, we are requesting a 30 day extension (11 February) to respond to this solicitation.
Response: Receipt date for proposals has been by extended 15 days to 27 January 2021.
2. Please clarify if SDSs are required for submittal at the time of proposal or after contract award.
Response: Safety Data Sheets are not required for submittal of proposals.
File details come from the government source that posted it. Updated .