MCAS Miramar Fuels Lab Construct
Closed Pre-Solicitation Posted
- Solicitation number
- W9128F25RA068
- Agency
-
ENDIST Omaha
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237120 Oil and Gas Pipeline and Related Structures Construction
- Place of performance
- San Diego, California 92145, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District Omaha, intends to solicit demolition and complete renovation of Fuel Laboratory Facility 9647 at MCAS Miramar, California, with estimated solicitation release June 24, 2026, anticipated award value between $1 million and $5 million, set aside for Total Small Business. Responses to the Sources Sought Notice are due May 22, 2026.
Place of performance is MCAS Miramar, California. Work includes hazardous materials surveys, asbestos and lead-based paint abatement, 60 percent construction waste diversion, and comprehensive renovation of approximately 450 square feet (laboratory office, testing laboratory, and support spaces). The facility must be designed and built to UFC 4-310-03 DoD Fuels Laboratory Standard Type C++ with recessed fuel-resistant epoxy flooring, emergency shower and eyewash, fume hood, stainless steel cabinets, and epoxy countertops. Structural design follows UFC 3-301-01, Risk Category II. Mechanical systems include make-up air units and space pressure control; electrical work encompasses new distribution, LED lighting, and fire alarm integration with sprinkler monitoring. Fire protection requires a wet-pipe sprinkler system and fire alarm with mass notification capability compliant with NFPA codes. The contractor must implement an Environmental Protection Plan addressing storm water management, spill control, waste disposal, and air quality. Performance period is 410 calendar days from notice to proceed.
Prime contractors must carry bonding capability of at least $5 million (single job) under NAICS 237120. Required qualifications include petroleum/lubricant facility experience on government installations within five years; knowledge of UFGS, UFC, and NFPA standards; military base compliance; and staffing with a Level Two SSHO (EM 385-1-1), a QC Manager with 10 years' combined relevant experience including 5 years as QC Manager, and a superintendent with 8 years' construction experience including 5 years as superintendent. Responses must include CAGE code, UEI, SAM registration status, and a two-page capability statement, submitted to Steven.d.engen@usace.army.mil and Robert.J.Ragos@usace.army.mil by May 22, 2026, 14:00 CST.
Notice text
This project consists of demolition and construct/renovate the Fuel Laboratory Facility 9647 (CLIN 0001). The existing structure is in relatively good condition, therefore the building will be completely renovated. Environmental considerations of this project includes demolition with hazardous building materials survey and abatement. Prevent environmental pollution and damage that may occur as a result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract.
Files
| File | Type | Posted |
|---|---|---|
| Sources Sought_Miramar.pdf | ||
| Attachment E - RFP Drawings.pdf | ||
| DRAFT_Attachment D - Technical Scope of Work.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Pre-Solicitation | |
| MCAS Miramar Fuels Laboratory | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| RTOIL Office rehab | Naval Air Warfare Center | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity