Attachment E - RFP Drawings.pdf

PDF 37 MB Posted

Attached to
MCAS Miramar Fuels Lab Construct
Solicitation number
W9128F25RA068
Issued by

About this file

This file contains architectural drawings and design documentation for the renovation of Building 9647, the Fuel Laboratory Facility at Marine Corps Air Station (MCAS) Miramar, California. The drawings are conceptual in nature and include a complete set of plans prepared by the U.S. Army Corps of Engineers in January 2025 for the Fueling System Improvements project (Solicitation No. W9128F25RA068).

The drawing set encompasses floor plans, reflected ceiling plans, roof plans, building elevations (north, south, east, and west), and cross-sectional views of the single-story structure. Key building dimensions show a finished floor elevation at 100 feet, top of concrete masonry unit (CMU) at 111 feet 8 inches, and roof elevation at 109 feet 8 inches. The facility layout includes Laboratory 101, Laboratory Office 100, and designated areas for laboratory equipment such as fume hoods, desks, balance tables, emergency eyewash and shower stations, and a dishwasher. The drawings specify 2 feet by 2 feet acoustic ceiling tile (ACT) assembly for the reflected ceiling plan. A critical notation states that existing furniture will be reinstalled after renovation and that contractors must conduct on-site investigation of existing facility conditions prior to bid submission. The drawings serve as the technical baseline for the complete renovation of this fuel laboratory facility, which is described in the related solicitation as involving demolition, hazardous materials abatement, and comprehensive renovation work.

View the file

Other files

File Type Posted
Sources Sought_Miramar.pdf PDF
DRAFT_Attachment D - Technical Scope of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT E – RFP DRAWINGS

Drawing Index

DWG NO DESCRIPTION

GI101 PROJECT LOCATION & VICINITY MAP

A-101 FIRST FLOOR PLAN

A-104 ROOF PLAN

A-105 FIRST FLOOR REFLECTED CEILING PLAN

A-201 NORTH AND SOUTH ELEVATIONS

A-202 EAST AND WEST ELEVATIONS

A-301 BUILDING SECTIONS

LABORATORY

LABORATORY

OFFICE

6' - 0" 6' - 0" 6' - 0"

18' - 0"

A-202 H1

A-202 B1

A-201 G1

18' - 0"

2'

9" 4'

0"

8'

0" 4'

0"

6'

3"

3'

0"

A-201 A1

8'

8"

16' - 4"

H1 A-301

A1 A-301

FUME HOOD

DESK

BALANCE

TABLE

EMERGENCY

EYEWASH AND

SHOWER

DISHWASHER

F.E.C

GENERAL NOTES:

1. EXISTING FURNITURE TO BE REINSTALLED AFTER RENOVATION

2. DRAWINGS ARE CONCEPTUAL IN NATURE. CONTRACTOR MUST CONDUCT AN

ON-SITE INVESTIGATION ON EXISITNG FACILITY CONDITIONS

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A-101

FI

R

ST

F

LO

O

R P

LA

N

M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

M

IR

AM

AR

, C A

O . R

IV

ER

A

O . R

IV

ER

A

A.

P

AR

KE

R

A.

P

AR

KE

R

JA

N

FU

EL

IN

G S

YS

TE

M

IM

PR

O

VE

M

EN

TS

1/2" = 1'-0"B1 CONCEPT FLOOR PLAN - BLDG. 9647

0 1' 2' 4'

PLAN NORTH

SLOPE

SL

O

PE

SLOPE

SL

O

PE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A-104

R O

O F

PL

AN

M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

M

IR

AM

AR

, C A

Ab bi e Fo rd

Ab bi e Fo rd

F.

G on za le s

B.

G or up

JA

N

FU

EL

IN

G S

YS

TE

M

IM

PR

O

VE

M

EN

TS

1/2" = 1'-0"A1 ROOF PLAN - BLDG. 9647

LABORATORY

LABORATORY

OFFICE

RCP LEGEND:

2' X 2' ACT ASSEMBLY

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A-105

FI

R

ST

F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N

M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

M

IR

AM

AR

, C A

O . R

IV

ER

A

O . R

IV

ER

A

A.

P

AR

KE

R

A.

P

AR

KE

R

JA

N

FU

EL

IN

G S

YS

TE

M

IM

PR

O

VE

M

EN

TS

1/2" = 1'-0"A1 REFLECTED CEILING PLAN - BLDG. 9641

FIN. FLOOR

100' - 0"

T.O. CMU

111' - 8"

T.O. ROOF

109' - 8"

FIN. FLOOR

100' - 0"

T.O. CMU

111' - 8"

T.O. ROOF

109' - 8"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A-201

N O

R

TH

A N

D S

O U

TH

E

LE

VA

TI

O

N S

M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

M

IR

AM

AR

, C A

O . R

IV

ER

A

O . R

IV

ER

A

A.

P

AR

KE

R

A.

P

AR

KE

R

JA

N

FU

EL

IN

G S

YS

TE

M

IM

PR

O

VE

M

EN

TS

1/2" = 1'-0"A1 NORTH ELEVATION

1/2" = 1'-0"G1 SOUTH ELEVATION

T.O. CMU

111' - 8"

T.O. ROOF

109' - 8"

FIN. FLOOR

100' - 0"

T.O. CMU

111' - 8"

T.O. ROOF

109' - 8"

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A-202

EA

ST

A N

D W

ES

T

EL

EV

AT

IO

N S

M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

M

IR

AM

AR

, C A

O . R

IV

ER

A

O . R

IV

ER

A

A.

P

AR

KE

R

A.

P

AR

KE

R

JA

N

FU

EL

IN

G S

YS

TE

M

IM

PR

O

VE

M

EN

TS

1/2" = 1'-0"H1 EAST EVELATION - BLDG. 9647

1/2" = 1'-0"B1 WEST ELEVATION - BLDG 9647

T.O. CMU

111' - 8"

T.O. ROOF

109' - 8"

FIN. ACT

108' - 0"

A1 A-301

LABORATORY

FIN. FLOOR

100' - 0"

T.O. CMU

111' - 8"

T.O. ROOF

109' - 8"

H1 A-301

FIN. ACT

108' - 0"

LABORATORY

LABORATORY

OFFICE

US Army Corps of Engineers ®

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

D

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D

AT

E M

AR

K

D

ES

C R

IP

TI

O N

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

A-301

BU

IL

D

IN

G S

EC

TI

O N

S

M

AR

IN

E

C O

R

PS

A

IR

S

TA

TI

O

N

M

IR

AM

AR

, C A

O . R

IV

ER

A

O . R

IV

ER

A

A.

P

AR

KE

R

A.

P

AR

KE

R

JA

N

FU

EL

IN

G S

YS

TE

M

IM

PR

O

VE

M

EN

TS

1/2" = 1'-0"H1 CROSS SECTION - BLDG. 9647

1/2" = 1'-0"A1 LONGITUDINAL SECTION - BLDG. 9647

MRCA00100 - GI101
MRCA00100 - A-101
MRCA00100 - A-104
MRCA00100 - A-105
MRCA00100 - A-201
MRCA00100 - A-202
MRCA00100 - A-301

File details come from the government source that posted it. Updated .