Lwsc large lock center gate replacement

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W68MD910605830
Agency
ENDIST Seattle US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1KA Construction Of Dams
Place of performance
Seattle WA 98107 USA

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Engineering District Seattle seeks to replace the two existing 100-year old center miter gate leaves at the Lake Washington Ship Canal Large Lock in Seattle, Washington. The project requires the removal and disposal of the existing gates, which each weigh approximately 375,000 pounds, as well as fabrication, delivery, and installation of two new gate leaves. Interested parties must submit capability statements and supporting documentation by April 16, 2021 demonstrating their experience with similar projects, with contract award determined based on a full and open competition evaluation of technical qualifications.

There is no set-aside designation for this requirement. The primary NAICS code is 237990 and PSC code is W and the project value is estimated between $10-25 million. The replacement gates must be installed within the constraints of the 80-foot wide by 825-foot long lock chamber by January 31, 2022 to accommodate lock outages from November 15th through that date for in-water work only permitted from October through February.

Notice text

2 versions

Update #2 · Latest ·

Lake Washington Ship Canal has a requirement for the replacement of the existing 100-year old miter gate leaves which will require removal and disposal of the old gates and fabrication/delivery of two (2) new gate leaves. Each new gate leaf is estimated to weigh approximately 375,000 lbs. Horizontal and vertical concrete removal will be required to remove the existing gate quoin blocks, pintles, and gate anchorage embedded metals.  The magnitude of construction is between $10,000,000 and $25,000,000.

Update #1 ·

Lake Washington Ship Canal has a requirement for the replacement of the existing 100-year old miter gate leaves which will require removal and disposal of the old gates and fabrication/delivery of two (2) new gate leaves. Each new gate leaf is estimated to weigh approximately 375,000 lbs. Horizontal and vertical concrete removal will be required to remove the existing gate quoin blocks, pintles, and gate anchorage embedded metals.

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Lwsc large lock center gate replacement Award Award Notice
Lwsc large lock center gate replacement Latest solicitation Solicitation
Lwsc large lock center gate replacement Pre-Solicitation
Lwsc large lock center gate replacement This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity