LWSC Large Lock Center Gate Replacement (Sources Sought Amd_0002).pdf

PDF 4 MB Posted

Attached to
LWSC LARGE LOCK CENTER GATE REPLACEMENT Federal contract opportunity
Solicitation number
W68MD910605830
Issued by
Department of the Army Corps of Engineers Engineering District Seattle

About this file

This sources sought synopsis and related documents outline a federal contract opportunity for the replacement of the two center miter gates for the main lock leaves at the Ballard Locks in Seattle, Washington. The project involves removing and disposing of the existing 100-year old gates and fabricating, delivering, and installing two new gate leaves estimated at 375,000 pounds each. Interested parties are invited to submit capability statements and supporting documentation by April 16, 2021 in response to this sources sought notice. The U.S. Army Corps of Engineers Seattle District will use the information gathered to determine an appropriate acquisition strategy and whether the requirement may be set aside for small businesses or procured through full and open competition. A draft schedule restricts in-water work to October through February and includes lock outages from November 15th through January 31st.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT SYNOPSIS

Amendment 0002

This sources sought synopsis will provide market research to identify parties having an interest in, and the resources to support this requirement for the replacement of the two (2) center miter gates for the main lock leaves at Ballard (Hiram M. Chittenden) Locks, Seattle, WA. Replacement of the existing 100-year old miter gate leaves will require removal and disposal of the old gates and fabrication/delivery/installation of two new gate leaves. The result of this market research will help determine an appropriate acquisition strategy. The applicable North American Industry Classification System (NAICS) code assigned to this procurement is 237990 Other Heavy and Civil Engineering Construction.

MAGNITUDE OF CONSTRUCTION: The magnitude of this construction project is estimated to be more than $10,000,000.

There is no solicitation at this time. This request for capability information does not constitute a request for proposals; submission of any information in response to this market survey is purely voluntary; the government assumes no financial responsibility for any costs incurred.

If your organization has the potential capacity to perform these contract services, please provide the following information:

1) organization name, address, email address, website address, telephone number, and either DUNS number or CAGE code, as well as type of ownership for the organization; and

2) tailored capability statements addressing the particulars of this effort, with appropriate documentation supporting claims of organizational and staff capability. If significant subcontracting or teaming is anticipated in order to deliver technical capability, organizations should address the administrative and management structure of such arrangements.

The U.S. Army Corps of Engineers, Seattle District hosted an Industry Day on March 24, 2021 at the Ballard Locks and provided additional information on the upcoming requirement for the replacement of the large lock center miter gate and associated infrastructure. The slide presentation, questionnaire, and sign-in roster from the Industry Day are hereby provided.

Responses to this sources sought notice/market research will determine if this requirement may be set-aside for small businesses or procured through full and open competition. Telephone inquiries will not be accepted or acknowledged, and no feedback or evaluations will be provided to companies regarding their submissions.

Submission Instructions:

Interested parties who consider themselves qualified to perform the above-listed services are invited to submit a response to this Sources Sought Notice by April 16, 2021; 2:30 pm local time (PST). All responses under this Sources Sought Notice must be emailed to Vincent.e.daniels@usace.army.mil.

If you have any questions concerning this opportunity, please contact:

Vincent E. Daniels Acquisition Management Specialist Email: vincent.e.daniels@usace.army.mil.

mailto:Vincent.e.daniels@usace.army.mil mailto:vincent.e.daniels@usace.army.mil

APPENDIX 1: Purpose and Objectives

DEMOLITION/DECONSTRUCTION:

Replacement of the existing 100-year old miter gate leaves will require removal and disposal of the old gates and fabrication/delivery of two (2) new gate leaves. Each new gate leaf is estimated to weigh approximately 375,000 lbs. Horizontal and vertical concrete removal will be required to remove the existing gate quoin blocks, pintles, and gate anchorage embedded metals.

Heavy-lift crane operations for removal and installation of the new miter gates will be required, with limited land based access to the gate location for equipment. Any use of floating-plant heavy-lift cranes will need to operate within the constraints of the lock dimensions and existing structures for adequate boom clearance and swing radius. The main lock chamber is 80 feet wide, with an overall chamber length of 825 feet, and an upstream pool draft of 33.5 feet when the saltwater barrier is down, and an upstream draft of 16.0 feet with the saltwater barrier raised. Downstream pool elevation varies with two (2) high tides, and two (2) low tides each day. Average water surface elevation for lower pool is 29.0 feet but can vary down to 15.0 feet of draft during extreme low tide (See Figure 3).

The sequencing of concrete modifications, in conjunction with allowing navigation traffic thru the lock chamber, will require the design/fabrication/installation/dewatering of localized steel cofferdams to isolate work areas “in the dry” to perform the work.

One lock chamber dewatering is anticipated to adjust and commission the miter gate after installation.

The duration of the dewatering is expected to be 45 days. The dewatering will be scheduled in advance and shall not be executed consecutive to another dewatering. The Government will perform the initial dewatering of the lock chamber for each closure period and the Contractor will be responsible for all maintenance pumping to keep the lock in a dewatered condition during the construction periods.

NEW GATE INSTALLATION:

The new contractor-fabricated miter gate leaves will be installed in the existing gate recesses with new gate anchorages placed into the concrete. New intermittent contact quoin blocks and sealing surfaces will be retrofitted vertically in the concrete gate monoliths. The new gate pintles will incorporate self-lubricating pintle balls as part of a fixed-pintle design into new embedded metals at the bottom of the lock chamber. The existing gate operating machinery will be reused and connected to the new gates. Existing electrical equipment on the gates will be removed and reinstalled on the new gates.

Figure 1. Site Map of Ballard Locks

Figure 2. Satellite Image Ballard Locks

Figure 3. Mean Water Elevation

Please Sign In!

Project: Large Lock Center Gate Industry Day Date: 24 March 2021 Facilitator: Time: 0900-1200 Location: Ballard Locks, Seattle, WA Page:

PRINT NAME ORGANIZATION / COMPANY EMAIL PHONE #

1 Eric Ramirez American Construction Company eric@americanconstco.com 971-291-6046 2 Cu Mai Shimmich Construction cmai@shimmich.com 510-750-0211 3 Eldon Ash Omega Morgan Eldon.Ash@oms-crane.com 206-402-1545 4 Justin Wetherbee Pacific Pile & Marine justinw@pacificpile.com 206-940-8718 5 Greg White RJS Construction greg.white@rjsconst.com 360-731-1618 6 Jeff Harper Northbank Civil & Marine jeffh@northbankcm.com 360-984-3336 7 David Berry Redside Construction sam@redside.biz 206-317-6400 8 Matt Parks Omega Morgan Matt.Parks@omegamorgan.com 253-306-4295 9 Erik Dolmseth Manson Construction edolmseth@mansonconstruction.com 206-384-3025 10 Ryan Mitchell IMCO General Construction rmitchell@imcoconstruction.com 360-393-1209 11 Russell Isam IMCO General Construction risam@imcoconstruction.com 360-410-0027 Online Participants Below This Line – No Other Information Besides Name 12 Cameron Marti 13 David Knight 14 Erin Querio Not sure about last name….

15 Karen McCarthy 16 Manson Construction 17 Milan Miluwoviz Not sure about this one… 18 Sam Berry 19 Rodell First name only on WebEx… 20 Vince Piscitello mailto:eric@americanconstco.com mailto:cmai@shimmich.com mailto:justinw@pacificpile.com mailto:greg.white@rjsconst.com mailto:jeffh@northbankcm.com mailto:sam@redside.biz mailto:edolmseth@mansonconstruction.com mailto:rmitchell@imcoconstruction.com mailto:risam@imcoconstruction.com

Industry Day Contractor Survey Questions

Feel free to elaborate on any of your answers to these questions.

1. What kind of company do you work for? (please circle one of the two)

Prime/Joint Venture or Subcontractor/Supplier/Other

2. As presented today, would there be any changes to the contract that could aid in lowering Contractor risk, overall schedule execution or significant reduction in contract amount?

a) If so, please identify which of the three would have the greatest impact. (Circle one)

Contractor Risk Overall Schedule Execution Cost Reduction

b) If you have any suggested changes to the structure of the contract or addition of contract options that would benefit the impacts shown above in number/scope/structure/sequencing, please describe below:

3. If this contract was split into a supply contract for the equipment and a construction contract for the removal / installation of the old /new equipment, would this affect your decision on whether to supply a proposal or not for either contract? (Choose YES or NO)

4. If this contract was issued using a low-bid, Invitation for Bid or Low Price Technically Acceptable contract in lieu of a negotiated Best Value (Request for Proposal) procurement method, would this significantly impact your total proposal amount? (Select most appropriate response below)

Yes, would increase bid amount.

Which would have the most impact. (Circle One) IFB or LPTA

Yes, would decrease bid amount.

Which would have the most impact. (Circle One) IFB or LPTA

No, would not have significant impact.

5. Does RFP affect your decision on whether to supply a proposal or not? (Circle One)

Yes, RFP may cause us not to submit a proposal

No, RFP would not affect our decision to submit a proposal

6. Do the Schedule Restrictions as currently outlined in the draft documents significantly impact the ability to execute the work? (Choose YES or NO)

Yes, Schedule restrictions have a large impact to execution.

If so, which restriction has the greatest impact? (Circle one)

October Commencement

Ongoing Work with Navigation Restrictions

Scheduled Lock Dewaterings

Duration of allowable closures

If you have any suggested changes to the Schedule Restrictions that would allow for better execution of this work, please describe below:

7. As presented today, do site access considerations pose significant risk or impact to the ability to the removal and install the miter gates? (Choose YES or NO)

Yes, site access will have significant risk or impact.

No, site access has acceptable levels of risk and impact.

If yes, which of the site access considerations has the most risk or impact in the ability remove and install the miter gates? (Circle One)

Administrative Building

Control Stand

Control Tower

Recess Openings in Lock Walls

Botanical Garden

Width of Lock Chamber

Depth of Lock Chamber

Miter Gates Size or Weight

Access to the Construction Location

Other (Please Explain) ________________________________________________

8. What are areas of risk that you currently see in the design?

9. Optional – What is the name of the company you work for or represent? We intend to follow up with ALL attendees so we can have one-on-one conversations regarding your thoughts on how we might ensure this contract is successful.

LAKE WASHINGTON SHIP CANAL, LARGE LOCK CENTER

GATE REPLACEMENT – INDUSTRY DAY

Stephanie McKenna Project Manager Seattle District

Brent Anderson Technical Lead / Structural Engineer Inland Navigation Design Center Rock Island District

Date: 24 March 2021

AGENDA

1. Introduction

2. Rules of Engagement

3. Project Background

4. Design Overview & Drawings

5. Construction Considerations

6. Acquisition Strategy

7. Q&A

RULES OF ENGAGEMENT

• This conference is for informational purposes only.

• Draft/notional information presented during this meeting may change in the final version of the Request For Proposal (RFP) plans and specifications.

• Attendees must prepare their proposals in accordance with the RFP Solicitation that will be issued soon.

QUESTIONS / INQUIRIES

Interested parties may submit questions to www.Projnet.org using the following Key to access the application:

– BID ID 00001: LWSC LLCGR Industry Day

– Key Access: YRU7ED-A6RG7C

– To submit and review inquiry items, you will need to be a current registered user or self-register into system first.

PROJECT BACKGROUND

INTRODUCTION TO BALLARD LOCKS

The Lake Washington Ship Canal (LWSC), known to Seattle residents as the Ballard Locks or Hiram M. Chittenden Locks, were built by the U.S. Army Corps of Engineers and dedicated in 1917.

LWSC is a man-made waterway that allows recreational and commercial navigation between the Puget Sound and Lakes Union and Washington.

The pool in the lakes is maintained by the Locks which separates the saltwater of Puget Sound from the fresh water in the remainder of Lake Washington Ship Canal, Lake Union, and Lake Washington.

The project consists of the Hiram M. Chittenden Locks and Dam with associated facilities in Salmon Bay; the 5,800 foot Fremont Cut between Salmon Bay and Lake Union; and the 2,500 foot Montlake Cut between Lake Union and Lake Washington.

INTRODUCTION TO BALLARD LOCKS

The project is categorized as a Dam Safety Action Classification 2 or high hazard potential classification in the National Inventory of Dams.

The LWSC is currently authorized for navigation, fish passage, and recreation.

The project was originally authorized for two purposes: navigation and fish passage, by Public Law 61-264, River and Harbor Act of 25 June 1910, 60th Congress, First Session, in accordance with a plan set forth in House Document 953, 60th Congress, First Session. Recreation was added as an authorized purpose in the 1940s for all Corps projects in Public Law 534, Section 4 of the Flood Control Act of 1944.

Water surface elevation control (pool regulation) is related to the need for water for navigation and fish passage.

VICINITY MAP

WORK SITE MAP

Work Area:

Large Lock 80 x 825 ft Center Gate in front of Admin Building Limited access via land

A B

C

E

F

D

SITE ACCESS CONSIDERATIONS

A – ADMINISTRATIVE BUILDING

B – OPERATING HOUSE

C – CONTROL TOWER

D – RECESS OPENINGS IN

LOCK WALLS

E – BOTANICAL GARDEN

F – LOCK WIDTH 80 FEET

SITE ACCESS CONSIDERATIONS, CONT.

THIS DRAWING

SHOWS THE 2FT

WIDE CHAMFER

ON THE BOTTOM

OF THE LOCK

WALL.

THIS NARROWS

THE LOCK

CHAMBER FROM

AN 80 FT WIDTH

AT THE TOP TO A

76FT WIDTH AT

THE BOTTOM OF

THE CHAMBER.

OPERATIONS

Small Lock Chamber:

• Overall Length 150 feet

• Overall Width 30 feet

• Available Length is 123 feet

• Available Width is 28 feet

Large Lock:

• Overall Length 825 feet

• Overall Width 80 feet

• This Lock can be operated as one big lock chamber or 2 small lock chambers.

• Full chamber

• Available Length 760 feet

• Available Width 80 Feet

• West Chamber

• Available Length 327 Feet

• Available width 80 Feet

• East Chamber

• Available Length 385 Feet

• Available Width 80 Feet

Spillway:

• 235 foot Dam

Spillway

• 6 individiual Tainter

Gates

Fish Ladder:

• One Fish Ladder

• On the South side of the project

• This has 21 steps

• Flow through the ladder is controlled by a PLC

Chittenden Locks aka Ballard Locks:

• Has about 1.3 to 2 Million Visitors

Annually

• Is the Busiest Locks in the Nation by vessel count

• Cycles up to 50 times per day (summer)

• 45,000 Vessels Transit Annually (9,000

Commercial)

• About 1 Million Commercials Tons

Annually

• Has more lock operation than any lock chamber in the nation

ENVIRONMENTAL & CULTURAL RESOURCES

What are some of the requirements for these disciplines that we expect the contractor to abide by…

• Project is located within the boundaries of the Lake Washington Ship Canal Historic District

• Any change in Scope of work, materials, design or expansion of project area will require additional cultural resources review prior to start or resuming work.

• Use environmentally acceptable lubricants and fuel in machinery used near, in, or over water.

• Implement the water quality monitoring plan provided by the Corps for turbidity, pH, and sheen (as needed) and adhere to the Nationwide or Individual water quality certification permit (obtained by the Corps) to meet water quality standards.

• Do not discharge water that has been in contact with uncured cement to surface waters.

• Submit a spill prevention control and countermeasures (SPCC) plan, a stormwater pollution prevention plan (SWPPP), and environmental protection plan (EPP).

• Schedule in-water work, including work behind cofferdams, to the typical in-water work window

(Oct 15-Feb 15).

• Coordinate staging areas to avoid impacts to Tribal fisheries.

PROJECT STATUS

The Corps has completed 95% designs and is actively working to complete the remainder of the designs

Current acquisition plan is Best Value – Trade Off (BVTO)

Take advantage of industry expertise

Schedule = No. 1 Selection Criteria

Advertise – June 2021 Award – November 2021

SCHEDULE RESTRICTIONS

Government Developed Construction Schedule Based on Navigation Industry Restrictions

Work Inside Chamber Cannot Commence Until Middle of October

Mixture of Navigation Passage, Restricted Navigation, No Navigation

Use of Localized Cofferdams for Concrete Work Allows Passage of Navigation Traffic Contractor Works First Shift Navigation Transits All Other Times

Lock Dewatering (by Government) Adjust and Commission Miter Gates Repairs to Structure Normally Underwater

Sill Seal Replacement Concrete Removal for Jacking

DESIGN OVERVIEW & DRAWINGS

MAJOR DESIGN FEATURES

Replace Large Lock Center Miter Gates and Associated Components

Fabricate, Deliver, and Install Two Miter Gate Leafs (180 Tons each)

Replace Concrete Embedded Wall Quoin Blocks

Replace Concrete Embedded Pintle Base and Associated Pintle Ball/Bushing

Replace Concrete Embedded Connection Castings

Replace Anchorage Bars

Remove and Reconnect Mechanical/Electrical Operating Equipment

Adjust and Commission Miter Gates, Mechanical/Electrical Operating Equipment

Miter Gate Sill Seal Replacement

Miter Gate Jacking Components and Structure Modifications

Existing Center Miter Gate Removal

Horizontally Framed Miter Gate

Skin Plate Both Sides

No Provisions for Picking Gate

Weight: Approx. 250 TN per Leaf

Dimensions:

57 ft Tall 46 ft Wide

5.25 ft Deep

New Center Miter Gate

Horizontally Framed Gate

Skin Plate on One Side

Dual Lifting Points – Spreader Beam

Weight: Approx. 180 TN per Leaf

Dimensions:

57 ft Tall 46 ft Wide

5.25 ft Deep

Embedded Wall Quoin Contact Blocks

Going from Continuous Contact Blocks to Intermittent Contact at the Horizontal Gate Girders

Embedded Pintle Base and Associated Pintle Ball/Bushing

Ball: 17-4 Stainless Steel

Bushing: Aluminum Bronze Substrate Self-Lubricated Coating Grease Grooves for Backup

Embedded Connection Castings

Concrete Removal Around Existing Embedded Anchorage

Remove Connection Casting (riveted)

Bolt New Casting to Existing Original Embedded Anchorage

Anchorage Bars

Mechanical/Electrical Connection Removal/Reinstallation

Miter Gate Sill Seal Replacement

Seal Material: HDPE

Reuse Existing Bolts

Adjustment and Commissioning

Gate Installation (In the Wet) Connect Gate to Anchorage Bars Level Gate by Adjusting Anchorage Bars Connect Existing Machinery to Miter Gate Connect String Pot Position Sensor Reinstall Proximity Switches

Commissioning (Lock Dewatered) Adjust Quoin Blocks Adjust Miter Blocks Adjust Bottom Seal for Proper Bearing Cycle Gate to Verify Miter/Recess Adjust Operating Machinery and String Pot Sensor to get Miter/Recess Verify Miter/Recess with Proximity Switch

Miter Gate Jacking Components Concrete Removal to Accommodate Jacks

Steel Fabrications for Jacking and Stability

CONSTRUCTION CONSIDERATIONS

CONSTRUCTION OVERVIEW

Design Bid Build

Significant Constraints:

• Physical limitations of work area footprint – No large cranes on land adjacent to the Administration Building

• Weight of gates is significant – Heavy lift crane to lift into place

• Environmental and Cultural Resources consultations in progress – Mobilization to the site can’t occur before these are complete

• Dissimilar metals and corrosion submittal must be approved by Government

Requirements covered under Specification 01 56 00

Government Phasing Concept Provided

– Phase 1: Fabrication of long lead items

– Phase 2: Physical construction onsite

CONTRACT REQUIREMENT

• Performance Specification and Drawings to support.

• Contractor to develop Construction Schedule that incorporates fabrication separate from mobilization and construction, plus minimizes lock outages (either length of each outage or the total number of outages).

• Submittals requiring Government approval include:

Dissimilar metals and corrosion In-depth QC plan

• Water Diversion during Construction:

Lock outages and dewatering schedule Cofferdams to reduce outages and allow navigation traffic to pass

– Maximum Flow Capacity of no less than 6,500 CFS

– Forebay Elevation not to exceed 674’ within design flow

– Allow vessels 75’ wide or smaller to pass

• Two approaches:

Option #1: Separate Supply Contract and Construction Contract Option #2: Single Construction Contract with partial NTPs issued - #1 for fabrication and #2 for construction

WORK WINDOWS

In Water Work Window: Typically, October 15th through February 15th but minor changes could occur following Endangered Species Act consultation and/or Tribal coordination.

Lock Annual Dewatering Event: November

Lock Outage(s): November 15th – January 31st

ACQUISITION STRATEGY

ACQUISITION STRATEGY

Request for Proposal (RFP)

Best Value – Trade Off (BVTO)

Take advantage of industry expertise

Schedule = No. 1 Selection Criteria

Advertise – June 2021 Award – November 2021

Lake Washington Ship Canal, Seattle, WA

QUESTIONS?

Interested parties may submit questions to www.Projnet.org using the following Key to access the application:

– BID ID 00001: LWSC LLCGR Industry Day

– Key Access: YRU7ED-A6RG7C

Questions from this Industry Day may also be submitted to the Contract Specialist, Vincent Daniels, via email at Vincent.E.Daniels@usace.army.mil .

File details come from the government source that posted it. Updated .