LWSC Large Lock Center Gate Replacement (Draft Plans).pdf
PDF 37 MB Posted
- Attached to
- LWSC LARGE LOCK CENTER GATE REPLACEMENT Federal contract opportunity
- Solicitation number
- W68MD910605830
About this file
This document provides details for a federal contract opportunity to replace center gate leaves at the Lake Washington Ship Canal Large Lock. The U.S. Army Corps of Engineers Engineering District Seattle is seeking to remove and dispose of two existing 100-year old miter gate leaves that each weigh approximately 375,000 pounds. The selected contractor will be required to horizontally and vertically remove concrete to extract the existing gate quoin blocks, pintles, and other embedded metals, and then fabricate and deliver two new gate leaves. The pre-solicitation opportunity has a solicitation number of W68MD910605830 and is named the LWSC Large Lock Center Gate Replacement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LWSC Large Lock Center Gate Replacement (Sources Sought Amd_0002).pdf | ||
| LWSC Large Lock Center Gate Replacement (Draft Specs).pdf | ||
| LWSC Large Lock Center Gate Replacement INDUSTRY DAY (Special Notice).pdf | ||
| LWSC Large Lock Center Gate Replacement (Sources Sought Amd_0001).pdf | ||
| LWSC Large Lock Center Gate Replacement (Sources Sought).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT
SHEET ID TITLE
01 GENERAL
G-001 TITLE, LOCATION AND VICINITY MAPS
G-002 DRAWING INDEX
07 STRUCTURAL
S-001 GENERAL MITER GATE FABRICATION NOTES
S-002 GENERAL CONTROL DIMENSIONS
S-101 GENERAL GATE ISOMETRICS
S-201 ELEVATION - DOWNSTREAM MITER GATE
S-202 ELEVATION - UPSTREAM MITER GATE
S-203 ELEVATION AND ISOMETRIC - SKIN PLATE
S-204 ELEVATION - INTERCOSTALS & DIAPHRAM
SA101 PLAN - TOP GIRDER G-1
SA102 PLAN - INTERMEDIATE GIRDERS
SA103 PLAN - BOTTOM GIRDER G-13
SA501 DETAILS - TYPICAL GIRDER
SA502 DETAILS - DIAPHRAM
SA503 DETAILS - BOTTOM GIRDER
SB001 ISOMETRIC - GUDGEON HOOD
SB501 DETAIL - GUDGEON HOOD
SB502 DETAILS - GUDGEON HOOD
SC002 ISOMETRIC - STRUT HOOD
SC201 DETAIL - STRUT HOOD ASSEMBLY
SC501 DETAILS - STRUT HOOD
SD001 ISOMETRIC - DIAGONALS
SD201 ELEVATION - DOWNSTREAM FACE OF MITER GATE
SD202 ELEVATION - DIAGONAL INSTALLATION
SD301 SECTIONS - DIAGONAL CONNECTIONS
SD501 DETAIL - DIAGONAL BARS
SD502 DETAILS - DIAGONALS
SD503 DETAILS - DIAGONALS
SE401 SECTIONS - GATE SECTION AT PINTLE
SE501 DETAIL AND ISOMETRICS - SHEAR KEY PINTLE SOCKET
SE502 DETAILS - PINTLE SOCKET
SE503 DETAIL - PINTLE SOCKET
SE504 DETAILS - PINTLE BALL AND BUSHING
SE505 DETAILS - PINTLE BALL
SF201 ELEVATION - GATE FENDERS
SF501 DETAIL - DOWNSTREAM FENDERS
SG001 ISOMETRIC - MITER GUIDE
SG501 DETAIL - MITER GUIDE RIGHT LEAF
SG502 DETAIL - MITER GUIDE RIGHT LEAF
SG503 DETAIL - MITER GUIDE RIGHT LEAF
SG510 DETAIL - MITER GUIDE LEFT LEAF
SG511 DETAIL - MITER GUIDE LEFT LEAF
SG512 DETAIL - MITER GUIDE LEFT LEAF
SH001 ISOMETRIC - QUOIN POST
SH501 DETAIL - TYPICAL GATE QUOIN BLOCK
SH502 DETAILS - TYPICAL MITER GATE QUOIN BLOCK
SH503 DETAILS - QUOIN SEAL
SI101 PLANS AND ISOMETRIC - MITER POST RIGHT & LEFT LEAVES
SI501 DETAIL - MITER GATE MITER BLOCK
SI502 DETAILS - TYPICAL MITER GATE MITER BLOCK
SI503 DETAILS - RIGHT MITER SEAL
SI504 DETAIL - MITER SEAL BEARING PL ON LEFT LEAF
SJ101 PLAN - BOTTOM SEAL
SJ501 DETAILS - BOTTOM SEAL
SJ502 DETAILS - BOTTOM SEAL CLAMPING BAR AND SHIMS
SJ503 DETAILS - BOTTOM MITER SEAL
SK001 ISOMETRIC - WALKWAY
SK002 ISOMETRIC - WALKWAY
SK003 ISOMETRIC - RAMP WALKWAY
SK101 PLAN - WALKWAY
SK102 PLAN - RAMP WALKWAY
SK201 ELEVATION - WALKWAY
SK301 SECTIONS - WALKWAY
SK501 DETAIL - PANEL WALKWAY
SK502 DETAIL - LEG STRUCTURE WALKWAY
SK503 DETAIL - LEG STRUCTURE WALKWAY
SK505 DETAIL - LEG STRUCTURE WALKWAY
SK507 DETAIL - MOUNT PLATE BRACKET WALKWAY
SK508 DETAIL - 6X14 BASE WITH TRIANGLE WALKWAY
SK511 DETAIL - OVERLAP PLATE PARTS WALKWAY
SK512 DETAIL - W6X12 LONGITUDINAL AND BASE PLATE WALKWAY
SK513 DETAIL - W6X12 LONGITUDINAL WALKWAY
STRUCTURAL (CONT'D)
SK514 DETAIL - MISCELLANEOUS L PIECES WALKWAY
SK515 DETAIL - TOE PLATE WALKWAY
SK516 DETAIL - TOE PLATE WALKWAY
SK517 DETAIL - C6X13 WALKWAY
SK518 DETAIL - GRATING WALKWAY
SK519 DETAIL - RAMP PARTS WALKWAY
SL501 DETAIL - LIFTING LUG
SM201 ELEVATION - DOWNSTREAM TIE OFFS
SM202 ELEVATION - UPSTREAM TIE OFFS
SM501 DETAILS - TIE OFFS AND PAD EYE
ST201 ELEVATION - TURNING FOOT
ST501 DETAIL - TURNING FOOT
ST502 DETAILS - TURNING FOOT
SZ530 DETAIL - MITER GATE RECESS LATCH
SZ531 DETAILS - MITER GATE LATCH
SHEET ID TITLE
01 GENERAL
G-001 OVERALL TITLE, LOCATION AND VICINITY MAPS
G-002 OVERALL DRAWING INDEX
G-003 OVERALL SITE AND ACCESS PLAN
G-004 GENERAL ABBREVIATIONS
G-005 GENERAL DRAWING SET LAYOUT
G-006 GENERAL NOTES AND ORIENTATION
05 CIVIL
C-001 CIVIL LEGEND, ABBREVIATIONS AND GENERAL NOTES
C-002 CIVIL CONSTRUCTION SITE LAYOUT
C-003 SURVEY CONTROL PLAN
CS101 CIVIL SITE PLAN
SHEET ID TITLE
01 GENERAL
G-001 VOLUME I COVER SHEET
G-002 VOLUME I DRAWING INDEX
03 SURVEY
V-110 PLAN MITER GATE ANCHORAGE BASELINE SURVEY
V-111 PLAN WALL QUOIN AND PINTLE BASE
V-112 PLAN OPERATING MACHINERY BASELINE SURVEY
07 STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
SD101 PLAN - DEMOLITION
SD150 PLAN AND ELEVATION - LAND WALL DEMOLITION
SD151 PLAN AND ELEVATION - RIVER WALL DEMOLITION
SD120 PLAN - PINTLE BASE DEMOLITION
SD310 SECTION - QUOIN BLOCK DEMOLITION
SD320 SECTION - PINTLE BASE DEMOLITION
S-101 PLAN - MITER GATE INSTALLATION
S-102 PLAN - MITER GATE INSTALLATION
S-110 PLAN AND ELEVATION - LAND WALL MITER GATE
S-111 PLAN - RIVER WALL MITER GATE INSTALLATION
S-120 PLAN AND ISOMETRIC - PINTLE BASE INSTALLATION
S-150 PLAN - ANCHORAGE BAR INSTALLATION LANDWALL
S-151 PLAN - ANCHORAGE BAR INSTALLATION RIVERWALL
S-160 PLAN - MITER GATE SILL
S-170 PLAN MITER GUIDE
S-171 PLAN - MITER BLOCK AND SEAL
S-172 PLAN - MITER GUIDE
S-210 ELEVATION - LAND WALL QUOIN BLOCK
S-301 SECTIONS - MITER GATE INSTALLATION
S-302 SECTIONS - MITER GATE INSTALLATION
S-310 SECTION - QUOIN BLOCK & SEAL PLATE INSTALLATION
S-320 SECTION - PINTLE BASE INSTALLATION
S-350 SECTIONS - ANCHORAGE BAR CONNECTION
S-360 SECTIONS - MITER GATE SILL
S-380 SECTION - RECESS LATCH SYSTEM
S-510 DETAIL - QUOIN BLOCK ASSEMBLY
S-511 DETAILS - WALL QUOIN BEARING BLOCK
S-512 DETAIL - WALL QUOIN EMBEDDED FRAME
S-513 DETAILS - WALL QUOIN
S-520 DETAIL - PINTLE BASE AND COLLAR ASSEMBLY
S-521 DETAILS - PINTLE BASE
S-523 DETAILS - PINTLE SEAL PLATE
S-550 DETAIL - ANCHORAGE BAR FABRICATION
S-551 DETAILS - ANCHORAGE BAR FABRICATION
S-552 DETAILS - ANCHORAGE BAR FABRICATION
S-553 DETAILS - ANCHORAGE BAR FABRICATION GUDGEON PIN COMPONENTS
S-554 DETAILS - ANCHORAGE BAR FABRICATION ANCHORAGE BAR COMPONENTS
S-555 DETAILS - EMBEDDED ANCHORAGE REHABILITATION
S-556 DETAILS - CHECK POST COVER PLATE SUPPORT AND REINFORCEMENT
S-560 DETAIL - OPERATING MACHINERY CONNECTION ASSEMBLY
S-561 DETAILS - OPERATING MACHINERY CONNECTION
S-570 DETAIL AND ISOMETRIC - PROXIMITY SENSOR
S-580 DETAILS RECESS LATCH SYSTEM
15 ELECTRICAL
E-001 GENERAL ELECTRICAL NOTES
E-102 PLAN - EXISTING ELECTRICAL LAND WALL
E-103 PLAN - EXISTING ELECTRICAL RIVER WALL
G
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdjaa\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\PRELIM-G-004.dwg
Plot Date: 11/27/2019 3:47:51 PM
M A
R K
D E
S C
R I P
T I O
N D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
C T
N
O
D R
A W
I N
G
C
O D
E
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
F Y
P
L
C G
R
L A
R G
E
L
O C
K
C
E N
T E
R
G
A T
E
R
E P
L A
C E
M E
N T
H I R
A M
C
H I T
T E
N D
E
C K
S
S
E A
T T
W
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
S E
A T
T
D
I S
T R
I C
T
S E
A T
T L E
W
A S
H I N
G T
S B
R Y
N E
R
J A
R I A
S
B J O
N E
S
B A
R I
B
O O
K O
U T
A N
S I
D
I S
S U
E
D
A T
E
J
AN
U
AR
Y
G-004
G E
N E
R A
L
A B
B R
E V
I A
T I O
N S
M V
D
N D
C I N
L A
V
A G
A T
I O
N
D
E S
I G
N
C
E N
T E
R L
R D
A
B
C
D
AB ANCHOR BOLT
ADDL ADDITIONAL
ADJ ADJUSTABLE OR ADJACENT
AISC AMERICAN INSTITUTE OF
STEEL CONSTRUCTION
ALT ALTERNATE
ALUM ALUMINUM
APPROX APPROXIMATE, APPROXIMATELY
ARCH ARCHITECT, -URAL, -URE
ASTM AMERICAN SOCIETY OF TESTING
AND MATERIALS
AVG AVERAGE
AWS AMERICAN WELD SOCIETY
D DEPTH
DAS DEFORMED ANCHOR STUD
DBL DOUBLE
DEMO DEMOLISH OR DEMOLITION
DIA OR Ø DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DS DOWNSTREAM
DTL DETAIL
DWG DRAWING
DWL DOWEL
f'c CONCRETE COMPRESSIVE STRENGTH
FCM FRACTURE CRITICAL MEMBER
FD FLOOR DRAIN
FIN FINISH
FLR FLOOR
FND FOUNDATION
FOB FACE OF BUILDING
FOW FACE OF WALL
FR FRAMING
FT FOOT
FTG FOOTING
IAW IN ACCORDANCE WITH
IBC INTERNATIONAL BUILDING CODE
ICF INSULATED CONCRETE FORMS
ID INSIDE DIAMETER
I.F. INSIDE FACE
IN. INCH
INT INTERIOR
ISO JNT ISOLATION JOINT
HCA HEADED CONCRETE ANCHOR
HDAB HEADED ANCHOR BOLT
HDR HEADER
HORIZ HORIZONTAL
HT HEIGHT OR HEAT TREAT
F
G
H
J
K
L
M
N
O
P
Q
R
S
T
U
W
Y
YD YARD
I
QTY QUANTITY
UFC UNIFIED FACILITIES CRITERIA
UNO UNLESS NOTED OTHERWISE
US UPSTREAM
UTIL UTILITY
E
V
JBOX JUNCTION BOX
JST JOIST
JT JOINT
KSI KIPS PER SQUARE INCH
(N) NEW STRUCTURAL MEMBER
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO OR # NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
O.F. OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PL PLATE
PMJF PRE-MOLDED JOINT FILLER
PRELIM PRELIMINARY
PROJ PROJECT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PVC POLYVINYL CHLORIDE
VERT VERTICAL
VIF VERIFY IN FIELD
W WIDTH
W/ WITH
W/O WITHOUT
WP WORK POINT
WT WEIGHT
WWR WELDED WIRE REINFORCEMENT
SYMBOLS
@ AT
MAN MANUAL
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MH MAN HOLE
MIL ONE THOUSANDTH OF AN INCH
MIN MINIMUM
MISC MISCELLANEOUS
MJ MONOLITH JOINT
GA GAUGE
GALV GALVANIZED
GB GRADE BEAM
GC GENERAL CONTRACTOR
GEN GENERAL OR GENERATOR
GR GRADE
GYP GYPSUM BOARD
LB, LBS OR # POUND(S)
LF LINEAR FEET
LH LEFT HAND
LIN LINEAR
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LOC LOCATION
SCHED SCHEDULE
SEC SECTION
SF SQUARE FOOT
SHT SHEET
SIM SIMILAR
SLNT SEALANT
SLV ANCH SLEEVE ANCHOR
SP SPACE(S)
SPEC SPECIFICATION(S)
SPEC'D SPECIFIED
SQ SQUARE
SQ YD SQUARE YARD
STA STATIONING
STD STANDARD
STIFF STIFFENER
STL STEEL
STRUCT STRUCTURAL
SYM SYMMETRICAL
R OR RAD RADIUS
RCMU REINFORCED CONCRETE MASONRY
UNIT
REC RECESSED
REF REFERENCE
REINF REINFORCING, -ED, -MENT
REQ'D REQUIRED
REV REVISION OR REVISED
RH RIGHT HAND OR ROOF HATCH
RO ROUGH OPENING
(E) EXISTING
EA EACH
EF EACH FACE
EJ OR EXP JT EXPANSION JOINT
EL OR ELEV ELEVATION
EMBED EMBEDDED
ENCL ENCLOSURE
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
EQ SPA EQUAL SPACE
EQUIP EQUIPMENT
ETC ETCETERA
EXC EXCAVATE
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR
EW EACH WAY
C/C CENTER TO CENTER
C OR CH CHANNEL
CAP CAPACITY
CEA CONCRETE EXPANSION ANCHOR
CIPC CAST IN PLACE CONCRETE
CJ CONTROL/CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CENTER LINE
CL CLEAR, -ANCE
CMU CONCRETE MASONRY UNIT
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUE OR CONTINUOUS
COR CONTRACTING OFFICER
CP CHECKPOST
CRES CORROSION RESISTANT STEEL
CTB COUNTERBORE
CTSK COUNTERSINK
CY CUBIC YARD
C
L
TEMP TEMPERATURE
T.O. TOP OF
T&B TOP AND BOTTOM
TOC TOP OF COLUMN
TOS TOP OF STEEL
TOW TOP OF WALL
TYP TYPICAL
B BENT
BC BOLT CENTER
BHN BRINNELL HARDNESS
BLDG BUILDING
BM BEAM
BO BOTTOM OF
BP BASE PLATE
BRG BEARING
BS BOTH SIDES
BTM BOTTOM
BTWN BETWEEN
PRELIM
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdjaa\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\PRELIM-G-005.dwg
Plot Date: 11/27/2019 3:49:27 PM
M A
R K
D E
S C
R I P
T I O
N D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
C
O D
E
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
F Y
P
C G
R
L A
R G
E
L
O C
K
C
E N
T E
R
G
A T
E
R
E P
L A
C E
M E
N T
H I R
C
H I T
T E
N D
C K
S
S
E A
T T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S E
A T
T
S
T R
I C
T
S E
A T
T L E
W
A S
H I N
G T
S B
R Y
N E
R
J A
R I A
S
B J O
N E
S
B A
R I
B
O O
K O
U T
A N
S I
D
I S
S U
E
D
A T
E
J
AN
U
AR
Y
G-005
G E
N E
R A
L
D R
A W
I N
G
S
Y
O U
T
M V
D
N D
C I N
L A
V
A G
A T
I O
N
D
E S
I G
N
C
E N
T E
R L
R D
DRAWING SET LAYOUT
1. THIS SHEET EXPLAINS THE GENERAL LAYOUT OF THE
DRAWING SET. THE INTENT OF THIS SHEET IS TO PROVIDE A
DESCRIPTIVE OVERVIEW OF THE DRAWING SET TO ALLOW
THE CONTRACTOR TO MORE EASILY NAVIGATE THRU THE SET.
2. THE PLAN SET IS DIVIDED INTO DRAWING REFERENCE SETS,
WITH SUBCOMPONENT SHEETS UNDER THE DRAWING
REFERENCE SET.
3. IN ORDER TO NAVIGATE THE DRAWING SET, THE CONTRACTOR
SHOULD FOCUS ON THE SHEET ID BLOCK IN THE LOWER RIGHT
HAND CORNER OF EACH SHEET. THE SHEET ID BLOCK
CONTAINS THE FOLLOWING INFORMATION:
A. THE DRAWING SET REFERENCE INDICATES THE VOLUME
OF WORK DETAILED IN THAT DRAWING PACKAGE.
B. EACH SHEET WITHIN THE DRAWING REFERENCE SET WILL
HAVE A UNIQUE SHEET NUMBER, WITH EACH PLACEHOLDER
HAVING A SPECIFIC MEANING. NOTE - SHEET NUMBERS MAY
BE DUPLICATED BETWEEN VOLUMES, SO PARTICULAR
ATTENTION MUST BE PAID TO THE DRAWING SET REFERENCE.
C. THE FIRST PLACEHOLDER WITHIN THE SHEET NUMBER IS
THE ENGINEERING DISCIPLINE WHICH THE SHEET WAS
DEVELOPED BY.
D. THE SECOND PLACEHOLDER WITHIN THE SHEET NUMBER
IS THE SUBCOMPONENT. THE DRAWING SET REFERENCE
IS BROKEN INTO SUBCOMPONENTS, DESIGNATED BY AN
ARBITRARY LETTER IMMEDIATELY FOLLOWING THE
DISCIPLINE INDICATOR. THE USE OF SUBCOMPONENTS IS
TO BREAK PLANS/SECTIONS/DETAILS INTO DISCERNIBLE
AREAS OF WORK TO BETTER RELAY THE REQUIRED WORK
IN THAT AREA.
WITHIN EACH SUBCOMPONENT, INDIVIDUAL FABRICATIONS
ARE BROKEN DOWN FURTHER BASED ON SHEET SEQUENTIAL
NUMBERS. FOR EXAMPLE, IF A FABRICATION IS SHOWN ON
S-110, THEN THE SECTIONS ARE SHOWN ON S-310 AND
DETAILS ON S-510. THIS DOES NOT NECESSARILY HOLD TRUE
FOR EVERY SHEET, BUT IN GENERAL FOLLOWS THIS CONCEPT.
E. THE THIRD PLACEHOLDER IS THE SHEET TYPE DESIGNATOR,
WHICH FOLLOWS THE NATIONAL CAD STANDARDS.
SHEET TYPE DESIGNATORS ARE SHOWN ON THIS SHEET.
F. THE FINAL TWO PLACEHOLDERS ARE THE SEQUENTIAL
NUMBER OF THE SHEET.
0 - GENERAL
1 - PLANS (SYMBOLS LEGEND, NOTES, ETC.)
2 - ELEVATIONS (VERTICAL VIEWS)
3 - SECTIONS (SECTIONAL VIEWS, WALL SECTIONS)
4 - LARGE-SCALE VIEWS (PLANS, ELEVATIONS STAIR SECTIONS,
OR SECTIONS THAT ARE NOT DETAILS)
5 - DETAILS
6 - SCHEDULES AND DIAGRAMS
7 - USER DEFINED (FOR TYPES THAT DO NOT FALL IN OTHER
CATEGORIES, INCLUDING TYPICAL DETAIL SHEETS)
8 - USER DEFINED (FOR TYPES THAT DO NOT FALL IN OTHER
CATEGORIES)
9 - 3D REPRESENTATIONS (ISOMETRICS, PERSPECTIVES,
PHOTOGRAPHS)
DRAWING SET LAYOUT
Sx101
Sheet ID
DRAWING SET
SHEET NUMBER WITHIN DRAWING SET
SEQUENTIAL NUMBER
SHEET TYPE DESIGNATIONS
DISCIPLINE (STRUCTURAL, MECHANICAL,
ELECTRICAL, CIVIL, ARCHITECTURAL, ETC.)
DRAWING SET
SUBCOMPONENT (A THRU K)
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdjaa\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\PRELIM-G-006.dwg
Plot Date: 11/27/2019 3:53:19 PM
M A
R K
D E
S C
R I P
T I O
N D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
C
O D
E
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
F Y
P
C G
R
L A
R G
E
L
O C
K
C
E N
T E
R
G
A T
E
R
E P
L A
C E
M E
N T
H I R
C
H I T
T E
N D
C K
S
S
E A
T T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S E
A T
T
S
T R
I C
T
S E
A T
T L E
W
A S
H I N
G T
S B
R Y
N E
R
J A
R I A
S
B J O
N E
S
B A
R I
B
O O
K O
U T
A N
S I
D
I S
S U
E
D
A T
E
J
AN
U
AR
Y
G-006
G E
N E
R A
L
N O
T E
S
A
R I E
N T
A T
I O
N
M V
D
N D
C I N
L A
V
A G
A T
I O
N
D
E S
I G
N
C
E N
T E
R L
R D
GENERAL NOTES
1. GOVERNMENT UTILITIES (WATER, FUEL, ETC.) AND EQUIPMENT
(CRANE, FLOATING PLANT) WILL NOT BE MADE AVAILABLE TO THE
CONTRACTOR. ELECTRICAL UTILITIES WILL BE MADE AVAILABLE
TO THE CONTRACTOR IN ACCORDANCE WITH THE SPECIFICATION.
2. WATER ELEVATIONS AT THE LOCK FLUCTUATE ON AN HOURLY BASIS
WITH TIDAL FLUCTUATION. THE GOVERNMENT CANNOT ADJUST DAM GATE
SETTINGS TO ACCOMMODATE.
3. REFERENCE DRAWINGS ARE DRAWINGS OF RECORD, INCLUDED SOLELY
FOR THE CONTRACTOR'S BENEFIT. NO REQUIRED WORK UNDER THIS
CONTRACT IS SHOWN ON THE REFERENCE DRAWINGS. THE REFERENCE
DRAWINGS ARE NOT "AS BUILT" SO THEY DO NOT NECESSARILY
REPRESENT ACTUAL FIELD CONDITIONS. REFERENCE DRAWINGS ARE
NOT PRINTED TO SCALE.
4. THE DIMENSIONS, STATIONS, ELEVATIONS AND FEATURES ARE BASED ON
THE REFERENCE DRAWINGS SUPPLEMENTED BY FIELD SURVEY AND SHALL
BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE
FOR CONFIRMING ALL DIMENSIONS PRIOR TO COMMENCEMENT OF WORK.
EXISTING FEATURES AT THE LOCK MAY BE OUT OF PLUMB, BE SLIGHTLY OFF
IN LOCATION, OR SLIGHTLY OFF DIMENSIONALLY FROM THAT INDICATED ON
THE DRAWINGS AND AS-BUILTS. CONTRACTOR IS RESPONSIBLE FOR MINOR
MATERIALS AND ADJUSTMENTS TO INCLUDE SHIMS AND GRINDING
NECESSARY FOR FITTING AND SEALING FORMWORK, COFFERDAMS, AND
AFFIXING NEW FEATURES TO EXISTING STRUCTURES.
5. THE CONTRACTOR WILL NOT BE GIVEN PRIORITY OVER OTHER WATERWAY
USERS FOR LOCKAGE THROUGH THE LOCK. OBSERVATION OF NORMAL
QUEUING PROCEDURES IS REQUIRED UNLESS OTHERWISE PERMITTED BY
THE LOCKMASTER.
6. THE LOCK AND DAM SHALL REMAIN IN OPERATION DURING THE
CONSTRUCTION PERIOD EXCEPT AS NOTED IN THE SPECIFICATIONS.
CONTRACTOR SHALL MAKE ALL PROVISIONS NECESSARY, INCLUDING
TEMPORARY COVERS FOR OPEN TRENCHES, TEMPORARY HANDRAILS,
CLEARING OF WORK AREAS, ETC., TO ALLOW GOVERNMENT PERSONNEL
TO CONDUCT LOCK OPERATIONS.
7. NO WORK INVOLVING OPEN FLAMES, SPARKS, OR OTHER OPERATIONS
DEEMED DANGEROUS BY THE CONTRACTING OFFICER WILL BE ALLOWED
DURING LOCKAGE OF VESSELS CONTAINING FLAMMABLE PRODUCTS. SEE
SPECIFICATIONS.
8. CURE TIMES FOR CONCRETE SHALL BE INCLUDED WITHIN THE
NAVIGATION CLOSURE PERIOD.
9. LEAD-BASED PAINT IS PRESENT ON THE EXISTING ARMOR AND
EXISTING MITER GATES. ALL WORK AREAS WITH LEAD-BASED
PAINT SHALL BE CONDUCTED IN ACCORDANCE WITH THE
SPECIFICATIONS.
10. SECURITY FENCING AND HAND RAILING MAY BE REMOVED IN WORK AREAS
DURING CONSTRUCTION AS LONG AS SAFETY AND SECURITY ARE
MAINTAINED AND REINSTALLATION MADE TO ITS ORIGINAL LOCATION
AND CONDITION, INCLUDING AN APPROVED METHOD AND TYPE OF TOUCH
UP PAINTING AS NECESSARY. CONTRACTOR MAY BE REQUIRED TO INSTALL
NEW ANCHOR BOLTS TO RESET HAND RAIL TO EXISTING ANCHORED
CONDITIONS. ANCHORS SHALL BE EMBEDDED IN EPOXY GROUT TO A DEPTH
WHICH PROVIDES 4000 LB. ULTIMATE PULLOUT AND 6000 LB ULTIMATE
SHEAR. ALL ANCHORS AND NUTS SHALL BE GALVANIZED.
11. CONTRACTOR SHALL PLACE AND SECURE IN POSITION ALL ARMOR,
ANCHORS, REINFORCING, EMBEDDED METALS, ETC. PRIOR TO
ERECTION OF CONCRETE FORMWORK. ALL OF THESE COMPONENTS
SHALL BE SEPARATE FROM CONCRETE FORMWORK.
12. EXISTING MONOLITH JOINTS MAY NOT BE WATER TIGHT AND MAY
LEAK VARIOUS AMOUNTS OF WATER. IT IS THE CONTRACTORS
RESPONSIBILITY TO CONTROL THIS LEAKAGE FOR DEWATERING OF
COFFERDAMS AND CONCRETE PLACEMENT.
13. CONTRACTOR SHALL PROVIDE MEANS TO CAPTURE CONCRETE AND
OTHER MATERIAL REMOVED FROM THE LOCK BEFORE IT ENTERS THE RIVER.
14. UTILITIES NOT SHOWN IN THESE PLANS MAY BE ENCOUNTERED DURING
CONSTRUCTION ACTIVITIES. IT IS THE CONTRACTOR'S RESPONSIBILITY,
AS REQUIRED BY LAW, TO FOLLOW THE PROPER NOTIFICATION/LOCATE
PROCEDURE PRIOR TO EXCAVATION. ANY DAMAGE CAUSED BY THE
CONTRACTOR'S ACTIVITIES SHALL BE REPAIRED AT THE CONTRACTOR'S
EXPENSE AS APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
THE CONTRACTOR SHALL RELOCATE AND RESTORE SUCH UTILITIES AS
REQUIRED AND APPROVED BY THE CONTRACTING OFFICER.
15. REMOVAL OF LOCK OPERATING EQUIPMENT PRIOR TO LOCK CLOSURE
REQUIRES WRITTEN APPROVAL FROM THE CONTRACTING OFFICER.
16. "REPLACE" INDICATES REMOVE AND NOT REUSE EXISTING. "REINSTALL"
INDICATES TO REUSE EXISTING.
17. CONTRACTOR TO STAKE OUT ALL STAGING AREAS PRIOR TO USE TO ENSURE
THERE ISN'T ENCROACHMENT ON PROPERTY NOT OWNED BY USACE. UPON
COMPLETION OF STAGING AREA USE, THE CONTRACTOR IS RESPONSIBLE
FOR RETURNING THE STAGING AREAS TO THEIR PRE-CONSTRUCTION CONDITION.
18. DURING ALL COMPONENT COMMISSIONING, THE COMMISSIONING SPECIALIST MUST BE
PRESENT ON-SITE AND DIRECTLY INVOLVED WITH THE PROCESS. THESE
COMMISSIONING EVENTS INCLUDE, BUT ARE NOT LIMITED TO: TESTING, ADJUSTING,
AND BALANCING.
19. NO CONCRETE REMOVAL OPERATIONS, INCLUDING SAWCUTTING AND CORING,
SHALL BE PERFORMED PRIOR TO THE OPERATING MACHINERY ROD BEING
DISCONNECTED FROM DECOMMISSIONED MITER GATE, DECOMMISSIONED
MITER GATES REMOVED, CYLINDER ROD RETRACTED INTO THE OPERATING
MACHINERY ROOM, AND ALL OPERATING MACHINERY COMPONENTS FROM DAMAGE.
R
I
G
H
A
F L
E
A
F
F L O
W
80'-0"
ORIENTATION
C-001
J
B A
R R
E T
T
J
C H
E C
K E
R
J
B A
R R
E T
T
A N
D G
E N
E R
A L N
O T
IV
IL
L
E G
E N
D
A B
B R
E V
IA
T
IO
6"
18"
FIRE SUPPRESSION WATER LINE & PIPE SIZE
XX
C-304
XX
C-502
N
0 10' 20'
GENERAL NOTES:
CIVIL NOTES
ABBREVIATIONS LEGEND
WWF
WSDOT
W.S.
VAR
TYP
TOC, TC
THK
TEMP
S1
STD
STCJ
STA
SQ.
SPEC.
SLP
SECT
SE
SCH
REQD
R
PVMT
PT
PSI
PIV
PCC
POE
POB
OHP
OD
OC
NTS
NIC
NFS
NAVD
NAD
N
MISC
MIN
MAX
MH
LG
LF
L
JBLM
IN
IE
FW
FT
FL
FIG
FG
FFE
FES
FC
EXIST, EX
EW
ELEV, EL
EJ
E
DIP
DIA
DCJ
CTR
COR
CO
CJTB
CC
CB
BOC
BLDG NO.
B.C.
AC
UTILITY NOTES:
PCC PAVEMENT
AC PAVEMENT
BIORETENTION CELL
CURB AND GUTTER
RIBBON CURB
SANITARY MANHOLE
CLEAN OUT
CATCH BASIN
OIL/WATER SEPARATOR
POST INDICATOR VALVE
FIRE HYDRANT
CONIFER TREE
DECIDUOUS TREE
VEGETATION LINE
BOLLARD
CURB CUT
GATE VALVE
O/W/S
CB
S
D
CO
TAPPING SLEEVE AND VALVE
CC
FIRE DEPARTMENT CONNECTION
DRAFTING
NORTH ARROW
DIRECTION OF VIEW
LETTER/NUMBER INDICATES LOCATION ON SHEET
SHEET ID WHERE SECTION/DETAIL IS PLACED
LETTER/NUMBER INDICATES LOCATION ON SHEET
SHEET ID WHERE DETAIL IS PLACED
(FEET)
GRAPHIC SCALE
LINE TYPES
EXISTING GRADE
PROPOSED GRADE
CONSTRUCTION LIMITS
WATER LINE & PIPE SIZE
SANITARY SEWER LINE & PIPE SIZE
STORM DRAIN LINE & PIPE SIZE
GAS LINE AND PIPE SIZE
CENTERLINE
W W
FF
SS SS
SDSD
G G
6"
6"
6"
GRADING LIMITS
CONVEYANCE DITCH
STORM DRAIN MANHOLE
SPOT ELEVATION
WELDED WIRE FABRIC
TRANSPORTATION
DEPARTMENT OF
WASHINGTON STATE
WATER SURFACE
VARIES
TYPICAL
TOP OF CURB
THICK
TEMPORARY
NUMBER
AND MONUMENT AND
LAYOUT SURVEY CASE
STANDARD
CONTRACTION JOINT (TYP)
SAWED TRANSVERSE
STATION
SQUARE
SPECIFICATION
SLOPE
SECTION
SPOT ELEVATION
SCHEDULE
REQUIRED
RADIUS OF CURVE, REINFORCED PANEL
PAVEMENT
PHYSICAL TRAINING
POUNDS PER SQUARE INCH
POST INDICATOR VALVE
PORTLAND CEMENT CONCRETE
POINT OF ENDING
POINT OF BEGINNING
OVERHEAD POWER POLE
OUTSIDE DIAMETER
ON CENTER
NOT TO SCALE
NOT IN CONTRACT
NON-FROST SUSCEPTIBLE
NORTH AMERICAN VERTICAL DATUM
NORTH AMERICAN DATUM
NORTH
MISCELLANEOUS
MINIMUM
MAXIMUM
MANHOLE
LONG
LINEAL FOOT/FEET
LENGTH OF CURVE
JOINT BASE LEWIS McCHORD
INCH/INCHES
INVERT ELEVATION
FIRE WATER
FEET/FOOT
FLOWLINE
FIGURE
FINISHED GRADE
FINISHED FLOOR ELEVATION
FLARED END SECTION
FACE OF CURB
EXISTING
EACH WAY
ELEVATION
EXPANSION JOINT
EAST
DUCTILE IRON PIPE
DIAMETER
DOWELED CONSTRUCTION JOINT ( TYP)
CENTER
OFFICER REPRESENTATIVE
USACE CONTRACTING
CLEAN OUT
W/ TIE BARS. FREE EDGE PANELS
LONGITUDINAL CONTRACTION JOINT
CURB CUT
CATCH BASIN
BOTTOM OF CURB
BUILDING NUMBER
BIORETENTION CELL
ASPHALT CONCRETE
DOCUMENTS.
UNLESS OTHERWISE INDICATED BY THE CONSTRUCTION
DURING CONSTRUCTION TO THEIR ORIGINAL CONDITION,
RESTORATION OF ALL EXISTING FEATURES DISTURBED
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL 7.
STABILIZED CONSTRUCTION ENTRANCES.
SITE ACCESS DURING CONSTRUCTION IS LIMITED TO 6.
UNLESS OTHERWISE NOTED.
TO HORIZONTALLY AND VERTICALLY PROJECTED PLANES
IN THE SPECIFICATIONS SHALL BE INTERPRETED TO REFER
ALL DISTANCES SHOWN ON THE DRAWINGS AND DESCRIBED 5.
SITE UTILITIES DURING CONSTRUCTION.
PROTECTING AND PRESERVING THE INTEGRITY OF EXISTING
AVOID DAMAGE. THE CONTRACTOR IS RESPONSIBLE FOR
UTILITIES AND IMPROVEMENTS PRIOR TO EXCAVATION TO
CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL
UTILITIES AND IMPROVEMENTS ARE APPROXIMATE. THE
THE HORIZONTAL AND VERTICAL LOCATIONS OF EXISTING 4.
COST TO THE OWNER.
FACILITIES SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ANY DAMAGE TO EXISTING SUBSURFACE OR SURFACE 3.
PERFORMING ANY EXCAVATION.
JBLM DEPARTMENT OF PUBLIC WORKS PRIOR TO
CONTRACTOR MUST SUBMIT A DIG PERMIT APPLICATION WITH
LOCATES IS: 1-800-424-5555. ADDITIONALLY, THE
LOCATE TICKET. THE ONE-CALL PHONE NUMBER FOR UTILITY
NO EXCAVATION MAY BEGIN UNTIL THE TIME STATED ON THE
CHAPTER 19.122 RCW – UNDERGROUND UTILITIES.
CENTER IN ACCORDANCE WITH STATE OF WASHINGTON LAW:
THROUGH THE STATE OF WASHINGTON UTILITY NOTIFICATION
SUBMIT A UTILITY LOCATE REQUEST (CALL BEFORE YOU DIG)
BEFORE EXCAVATION OR TRENCHING, CONTRACTOR SHALL 2.
RESPECT TO THE PLANS.
THE CORPS OF ENGINEERS OF ANY DISCREPANCIES WITH
BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY
CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD 1.
6"
18"
FIRE SUPPRESSION WATER LINE & PIPE SIZE
XX
C-304
XX
C-502
N
0 10' 20'
GENERAL NOTES:
CIVIL NOTES
ABBREVIATIONS LEGEND
WWF
WSDOT
W.S.
VAR
TYP
TOC, TC
THK
TEMP
S1
STD
STCJ
STA
SQ.
SPEC.
SLP
SECT
SE
SCH
REQD
R
PVMT
PT
PSI
PIV
PCC
POE
POB
OHP
OD
OC
NTS
NIC
NFS
NAVD
NAD
N
MISC
MIN
MAX
MH
LG
LF
L
JBLM
IN
IE
FW
FT
FL
FIG
FG
FFE
FES
FC
EXIST, EX
EW
ELEV, EL
EJ
E
DIP
DIA
DCJ
CTR
COR
CO
CJTB
CC
CB
BOC
BLDG NO.
B.C.
AC
UTILITY NOTES:
PCC PAVEMENT
AC PAVEMENT
BIORETENTION CELL
CURB AND GUTTER
RIBBON CURB
SANITARY MANHOLE
CLEAN OUT
CATCH BASIN
OIL/WATER SEPARATOR
POST INDICATOR VALVE
FIRE HYDRANT
CONIFER TREE
DECIDUOUS TREE
VEGETATION LINE
BOLLARD
CURB CUT
GATE VALVE
O/W/S
CB
S
D
CO
TAPPING SLEEVE AND VALVE
CC
FIRE DEPARTMENT CONNECTION
DRAFTING
NORTH ARROW
DIRECTION OF VIEW
LETTER/NUMBER INDICATES LOCATION ON SHEET
SHEET ID WHERE SECTION/DETAIL IS PLACED
LETTER/NUMBER INDICATES LOCATION ON SHEET
SHEET ID WHERE DETAIL IS PLACED
(FEET)
GRAPHIC SCALE
LINE TYPES
EXISTING GRADE
PROPOSED GRADE
CONSTRUCTION LIMITS
WATER LINE & PIPE SIZE
SANITARY SEWER LINE & PIPE SIZE
STORM DRAIN LINE & PIPE SIZE
GAS LINE AND PIPE SIZE
CENTERLINE
W W
FF
SS SS
SDSD
G G
6"
6"
6"
GRADING LIMITS
CONVEYANCE DITCH
STORM DRAIN MANHOLE
SPOT ELEVATION
WELDED WIRE FABRIC
TRANSPORTATION
DEPARTMENT OF
WASHINGTON STATE
WATER SURFACE
VARIES
TYPICAL
TOP OF CURB
THICK
TEMPORARY
NUMBER
AND MONUMENT AND
LAYOUT SURVEY CASE
STANDARD
CONTRACTION JOINT (TYP)
SAWED TRANSVERSE
STATION
SQUARE
SPECIFICATION
SLOPE
SECTION
SPOT ELEVATION
SCHEDULE
REQUIRED
RADIUS OF CURVE, REINFORCED PANEL
PAVEMENT
PHYSICAL TRAINING
POUNDS PER SQUARE INCH
POST INDICATOR VALVE
PORTLAND CEMENT CONCRETE
POINT OF ENDING
POINT OF BEGINNING
OVERHEAD POWER POLE
OUTSIDE DIAMETER
ON CENTER
NOT TO SCALE
NOT IN CONTRACT
NON-FROST SUSCEPTIBLE
NORTH AMERICAN VERTICAL DATUM
NORTH AMERICAN DATUM
NORTH
MISCELLANEOUS
MINIMUM
MAXIMUM
MANHOLE
LONG
LINEAL FOOT/FEET
LENGTH OF CURVE
JOINT BASE LEWIS McCHORD
INCH/INCHES
INVERT ELEVATION
FIRE WATER
FEET/FOOT
FLOWLINE
FIGURE
FINISHED GRADE
FINISHED FLOOR ELEVATION
FLARED END SECTION
FACE OF CURB
EXISTING
EACH WAY
ELEVATION
EXPANSION JOINT
EAST
DUCTILE IRON PIPE
DIAMETER
DOWELED CONSTRUCTION JOINT ( TYP)
CENTER
OFFICER REPRESENTATIVE
USACE CONTRACTING
CLEAN OUT
W/ TIE BARS. FREE EDGE PANELS
LONGITUDINAL CONTRACTION JOINT
CURB CUT
CATCH BASIN
BOTTOM OF CURB
BUILDING NUMBER
BIORETENTION CELL
ASPHALT CONCRETE
DOCUMENTS.
UNLESS OTHERWISE INDICATED BY THE CONSTRUCTION
DURING CONSTRUCTION TO THEIR ORIGINAL CONDITION,
RESTORATION OF ALL EXISTING FEATURES DISTURBED
THE CONTRACTOR SHALL BE RESPONSIBLE FOR FULL 7.
STABILIZED CONSTRUCTION ENTRANCES.
SITE ACCESS DURING CONSTRUCTION IS LIMITED TO 6.
UNLESS OTHERWISE NOTED.
TO HORIZONTALLY AND VERTICALLY PROJECTED PLANES
IN THE SPECIFICATIONS SHALL BE INTERPRETED TO REFER
ALL DISTANCES SHOWN ON THE DRAWINGS AND DESCRIBED 5.
SITE UTILITIES DURING CONSTRUCTION.
PROTECTING AND PRESERVING THE INTEGRITY OF EXISTING
AVOID DAMAGE. THE CONTRACTOR IS RESPONSIBLE FOR
UTILITIES AND IMPROVEMENTS PRIOR TO EXCAVATION TO
CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL
UTILITIES AND IMPROVEMENTS ARE APPROXIMATE. THE
THE HORIZONTAL AND VERTICAL LOCATIONS OF EXISTING 4.
COST TO THE OWNER.
FACILITIES SHALL BE REPAIRED BY THE CONTRACTOR AT NO
ANY DAMAGE TO EXISTING SUBSURFACE OR SURFACE 3.
PERFORMING ANY EXCAVATION.
JBLM DEPARTMENT OF PUBLIC WORKS PRIOR TO
CONTRACTOR MUST SUBMIT A DIG PERMIT APPLICATION WITH
LOCATES IS: 1-800-424-5555. ADDITIONALLY, THE
LOCATE TICKET. THE ONE-CALL PHONE NUMBER FOR UTILITY
NO EXCAVATION MAY BEGIN UNTIL THE TIME STATED ON THE
CHAPTER 19.122 RCW – UNDERGROUND UTILITIES.
CENTER IN ACCORDANCE WITH STATE OF WASHINGTON LAW:
THROUGH THE STATE OF WASHINGTON UTILITY NOTIFICATION
SUBMIT A UTILITY LOCATE REQUEST (CALL BEFORE YOU DIG)
BEFORE EXCAVATION OR TRENCHING, CONTRACTOR SHALL 2.
RESPECT TO THE PLANS.
THE CORPS OF ENGINEERS OF ANY DISCREPANCIES WITH
BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY
CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD 1.
(253) 833-2343PHONECENTURYLINK COMM.
(425) 392-6412NATURAL GAS PUGET SOUND ENERGY
(800) 424-5555 ONE CALL CALL-BEFORE-YOU-DIG
PHONEUTILITYCOMPANY
(253) 833-2343PHONECENTURYLINK COMM.
(425) 392-6412NATURAL GAS PUGET SOUND ENERGY
(800) 424-5555 ONE CALL CALL-BEFORE-YOU-DIG
PHONEUTILITYCOMPANY
B
B O
O K
O U
T
PRELIM
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
2:49:28 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
Y
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\Civil\C-001 - CIVIL LEGEND, ABBREVIATIONS AND GENERAL NOTES
Plot Date:
S
A
T T
L E
W A
S H
IN
G T
O N
F Y P
-4
L
L C
G R
L A
R G
E L
O C
K C
E N
T E
R G
A T
E R
E P
L A
C E
M E
N T
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S S
E A
T T
L E W
A
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
95% DESIGN SUBMITTAL
A
M U
R P
H Y
F
E B
R U
A R
Y
C-002
B A
R R
E T
T
J
B A
R R
E T
T
C
IV
IL
C
O N
S T
R U
C T
IO
N S
IT
E L
A Y
O U
T
GENERAL NOTES:
0 80' 160'
N
1" = 80'
CIVIL CONSTRUCTION LAYOUT
A1
D
IS
T R
IC
T G
A R
A G
E
MAINTENANCE YARD
OPERATIONS AND W
A
R E
H O
U S
E N
O
S T E
E L S
H O
P
SHED
C E
N T E
R
V
IS
IT
HOUSE
TRANSFORMER
HOUSE
BOAT
HOUSE
OIL
P A
IN
T S
H O
P
T O
O L S
H E
D
O F F
IC
E
S H
O P
SHOP
MACHINE
BLDG
ADMIN
HOUSE
CAVANAUGH
NURSERY
N.W. 54
TH STREET
30 FT x 150 FT
SMALL LOCK
LOCK CHAMBER
LOWER LARGE
80 FT x 825 FT
LOCK CHAMBER
UPPER LARGE
RESTROOMS
PUGET SOUND
AND CARL S. ENGLISH GARDENS
HIARM M. CHITTENDEN LOCKS ACCESS
EXISTING
C O
N S
TR
U C
TIO
N
LIM
TS
C O
N S
T R
U C
T
IO
N L
IM
T S
C O
N S
T R
U C
T
IO
N L
IM
T S
CONSTRUCTION. SEE SPECS.
SERVICES WITH COR PRIOR TO
SUPPLY, SEWER, AND OTHER REQUIRED
MEDICAL STATION, DOMESTIC WATER
2. COORDINATE HAUL ROUTE, EMERGENCY
SITE CONDITIONS.
1. CONTRACTOR TO FIELD VERIFY CURRENT
REPLACEMENT
LOCK CENTER GATE
LLCGR LARGE
FY20 P2-478297
B
B O
O K
O U
T C
H E
C K
E R
ACCESS GATES
S H
O P
E L E
C
20' x 6
0' (APPROX)DOWN AREASTAGING/LAY CONTRACTOR
T H
IS
C
O N
T R
A C
T
O V
E R
L A
N D A
C C
E S S
F
T x
F
T
B A
R G
E
F
T x
F
T
B A
R G
E
80 FT. x 200 FT.
STAGING AREA
MOORAGE
80 FT. x 200 FT.
STAGING AREA
MOORAGE
80 FT. x 200 FT.
STAGING AREA
MOORAGE
35 F T . x 195 F
T
B A R
G E
35 F T . x 195 F
T
B A R
G E
35 FT. x 195 FT.
BARGE
35 FT. x 195 FT.
BARGE
PRELIM
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
2:50:04 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\Civil\C-002 - CIVIL CONSTRUCTION SITE LAYOUT
S
A
T T
L E
W A
S H
IN
G T
O N
F Y P
-4
L
L C
G R
L A
R G
E L
O C
K C
E N
T E
R G
A T
E R
E P
L A
C E
M E
N T
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S S
E A
T T
L E W
A
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
95% DESIGN SUBMITTAL
A
M U
R P
H Y
F
E B
R U
A R
Y
B O
U N
D A R
Y U .S . R
E S E R
V A
TIO
N
BOUNDARY U.S. RESERVATION BOUNDARY
U.S.
R
ESERVATION
BOUNDARY U.S
. RESERVATION
BOUNDARY U.S. RESERVATION
BOUNDARY U.S. RESERVATION
SMALL LOCK
PK
COMMODORE PARK
19.1
19.2
19.2
19.1
SIGN
C-003
B A
R R
E T
T
J
C H
E C
K E
R
J
B A
R R
E T
T
S U
R V
E Y C
O N
T R
O L P
L
0 80' 160'
NOT TO SCALE
SURVEY MARKER - LOCKS 1
D6 NOT TO SCALE
SURVEY MARKER - LOCKS 2
D9
NOT TO SCALE
SURVEY MARKER - CEPD-1
A6 NOT TO SCALE
DATUM PLANES VICINITY
A9
1" = 80'
SURVEY CONTROL PLAN
B1
CONSTRUCTION LIMITS
CONSTRUCTION LIM
ITS
C O
N S
T R
U C
T
IO
N L
IM
IT
S
SURVEY NOTES:
BASED ON GPS SURVEY
MOVED TO SPCP 28-JUN-05
CADD DATE 14-SEPT-1992
1929 GA., SA., 47.
VERTICAL CONTROL BASED ON N.G.V.D.
STATE PLANE COORDS, NAD83.
HORIZONTAL CONTROL BASED ON WASH.
BOOKS 1-5 OF .
FIELD BOOK FILE NO. 22-117,
PERFORMED 6-10 FEB., 1992.
SUPPLEMENTED BY FIELD SURVEY
FLOWN 2-SEPT-1991
MAP COMPILED FROM AERIAL PHOTOGRAPHY
LAKE WASHINGTON SHIP CANAL
HIRAM CHITTENDEN LOCKS
COE MON
EL.19.11
E 1,255,420.548
N 246,675.023
POINT #LOCKS1COE MON
EL.19.15
E 1,254,843.038
N 246,901.630
POINT #LOCKS2
CEPD-01
A6
C-003
D9
C-003
D6
C-003
PK NAIL
EL. 21.91
E 1,255,533.815
N 247,097.717
POINT #2
NAVD88 = 59.79 NGS PUBLISHED
VERTICALS BASED ON "HOOK RM 1"
ELLIPSOID HEIGHT = -53.020
SEAT B
ELLIPSOID HEIGHT = -10.770
CORS SEAW
BASED ON A FAST STATIC SURVEY USING
ELLIPSOID HEIGHT = -53.64
MLLW (LOCK DATUM) = 26.06
MLLW (NOS) = 25.16
NGVD 29 ELEV = 19.24
NAVD 88 ELEV = 22.81
E 1,254,910.732
N 246,875.094
IT IS 6.97' FROM FACE OF THE LOCKS
IS CHISELLED "+" ON A BOLT IN CONCRETE
POINT 1
ELLIPSOID HEIGHT = -53.60
MLLW (LOCK DATUM) = 25.99
MLLW (NOS) = 25.09
NGVD 29 ELEV = 19.26
NAVD 88 ELEV = 22.83
E 1,255,420.547
N 246,675.022
IT IS 6.56' FROM THE FACE OF THE LOCKS
IS A 3.25" COE BRASS DISK WITH "BM LOCKS 1972"
POINT 3
SURVEY NOTES:
A2 A4
A2
C-003
A4
C-003
PK
STAGING AREA
W A
R E
H O
U S
E N
O .1
D
IS
T R
IC
T G
A R
A G
E
SHOP
MACHINE
HOUSE
OIL
GREEN HOUSE
S H
O P
P A
IN
T
O F F
IC
E
S H
O P
S T E
E L S
H O
P
C E
N T E
R
V
IS
IT
RESTROOMS
HOUSE
CAVANAUGH
BUILDING
ADMIN
NW 54T
H STREET
AND CARL S. ENGLISH GARDENS
HIRAM M. CHITTENDEN LOCKS
HOUSE
TRANSFORMER
B
B O
O K
O U
T
PRELIM
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
2:50:12 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\Civil\C-003 - SURVEY CONTROL PLAN
S
A
T T
L E
W A
S H
IN
G T
O N
F Y P
-4
L
L C
G R
L A
R G
E L
O C
K C
E N
T E
R G
A T
E R
E P
L A
C E
M E
N T
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S S
E A
T T
L E W
A
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
95% DESIGN SUBMITTAL
A
M U
R P
H Y
F
E B
R U
A R
Y
B O
U N
D A R
Y U .S . R
E S E R
V A
TIO
N
BOUNDARY U.S. RESERVATION BOUNDARY
U.S.
R
ESERVATION
B O
U N
D A
U .S
R
E S
E R
V A
T
IO
N
BOUNDARY U.S
. RESERVATION
BOUNDARY U.S. RESERVATION
BOUNDARY U.S. RESERVATION
BOUNDARY U.S. RESERVATION
CONC. CURB
PAD
CONC.
LARGE LOCK
SMALL LOCK
18.8
19.1
19.2
19.2
19.0
19.1
CS101
B A
R R
E T
T
J
C H
E C
K E
R
J
B A
R R
E T
T
C
IV
IL
S
IT
E P
L A
N
GENERAL NOTES:
0 20' 40'
N
1" = 20'
SITE PLAN
B1
PROJECT AREA
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
C O
N S
T R
U C
T
IO
N L
IM
IT
S
C O
N S
T R
U C
T
IO
N L
IM
IT
S
LOCK CHAMBER
LOWER LARGE
80 FT x 825 FT
LOCK CHAMBER
UPPER LARGE
SMALL LOCK
BUILDING
ADMINISTRATION
2. SEE STRUCTURAL PLANS
VERIFICATION BY THE CONTRACTOR.
PHOTOGRAPHY, SUBJECT TO FIELD
1. MAP COMPILED FROM RECENT AERIAL
SEE NOTE 2
GATE REPLACEMENT
LARGE LOCK CENTER
FY20 P2-478297 LLCGR
PROJECT:
B
B O
O K
O U
T
PRELIM
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
2:50:43 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\Civil\CS101 - CIVIL SITE PLAN
S
A
T T
L E
W A
S H
IN
G T
O N
F Y P
-4
L
L C
G R
L A
R G
E L
O C
K C
E N
T E
R G
A T
E R
E P
L A
C E
M E
N T
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S S
E A
T T
L E W
A
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
95% DESIGN SUBMITTAL
A
M U
R P
H Y
F
E B
R U
A R
Y
LARGE LOCK
SMALL LOCK
CB
CB
CB
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
2:36:27 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\General\G-001 - TITLE, LOCATION AND VICINITY MAPS
S
A
T T
L E
W A
S H
IN
G T
O N
F Y P
-4
L
L C
G R
L A
R G
E L
O C
K C
E N
T E
R G
A T
E R
E P
L A
C E
M E
N T
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S S
E A
T T
L E W
A
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
95% DESIGN SUBMITTAL
A
M U
R P
H Y
F
E B
R U
A R
Y
DATE AND TIME PLOTTED: 2/28/2020 DESIGN FILE: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\General\G-001 - TITLE, LOCATION AND VICINITY MAPS of Engineers US Army Corps
Seattle District
A REDUCED PRINT. REDUCE SCALE ACCORDINGLY.
IF SHEET MEASURES LESS THAN 22" X 34" IT IS
HIRAM M. CHITTENDEN LOCKS,
G-001
T
IT
L E L
O C
A T
IO
N
A N
D V
IC
IN
IT
Y M
A P
S
FY20 P2-478297 LLCGR
LARGE LOCK CENTER GATE REPLACEMENT
SEATTLE WA
VOLUME I
VOLUME I - MITER GATE INSTALLATION
95% DESIGN SUBMITTAL
G-002
R
A W
IN
G I
N D
X
FY20 P2-478297 LLCGR DRAWING INDEX
VOLUME I - MITER GATE INSTALLATION
VOLUME I
S O
L
IC
IT
A T
IO
N N
O
D W
N B
Y
C K
D B
Y
D
2 3
C
4 5
A
B
M A
R K
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N
O
D A
T E
3:18:08 PM
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
S E
A T
T L E D
IS
T R
IC
T
D E
S
IG
N E
D B
E
109876 of Engineers
US Army Corps
SHEET ID
IS
S
U E D
A T
E
File Path: pw:\\COE-NWSPW001SEA.nws.ds.usace.army.mil:cenws01\Documents\Civil Works\Lake Washington Ship Canal, WA\FY20 P2-478297 LLCGR - LARGE LOCK CENTER GATE REPLACEMENT\Current_Phase\Con_Docs\CAD_Sheets\General\G-002 - DRAWING INDEX
S
A
T T
L E
W A
S H
IN
G T
O N
F Y P
-4
L
L C
G R
L A
R G
E L
O C
K C
E N
T E
R G
A T
E R
E P
L A
C E
M E
N T
H
IR
A M M
C H
IT
T E
N D
E N L
O C
K S S
E A
T T
L E W
A
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
95% DESIGN SUBMITTAL
A
M U
R P
H Y
F
E B
R U
A R
Y
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdjaa\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\VOL_I_V-110.dwg
Plot Date: 03/11/2021 7:06:54 PM
M A
R K
D E
S C
R I P
T I O
N D
A T
E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
C
O D
E
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
F Y
P
C G
R
L A
R G
E
L
O C
K
C
E N
T E
R
G
A T
E
R
E P
L A
C E
M E
N T
H I R
C
H I T
T E
N D
C K
S
S
E A
T T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S E
A T
T
S
T R
I C
T
S E
A T
T L E
W
A S
H I N
G T
E
J O
H N
S O
N
D
D
I L L O
N
B
J O
N E
S
S
M c K
E N
N A
A N
S I
D
M
A R
V-110
P L
A N
M I T
T
E
A
N C
H O
R A
G E
B A
S E
L I N
E
S
U R
V E
VOLUME I
V
D
N D
C I N
L A
V
A G
A T
I O
N
D
E S
I G
N
C
E N
T E
R L
R D
A1
PLAN - MITER GATE ANCHORAGES
SCALE : 1/2" = 1'-0"
GENERAL SHEET NOTES
1. THE WORK DESCRIBED ON THIS SHEET IS TO ESTABLISH THE
BASELINE LOCATION OF THE EXISTING MITER GATE
ANCHORAGES.
MEASURMENTS SHALL BE TAKEN PRIOR TO THE
COMMENCEMENT OF ANY WORK. THE REQUIREMENTS
SHOWN MAY NOT REFLECT ALL NECESSARY DIMENSIONS
REQUIRED TO RESET ANCHORAGE COMPONENTS.
CONTRACTOR SHALL DETERMINE AND SURVEY ALL
DIMENSIONS REQUIRED TO RESET ANCHORAGE
COMPONENTS.
2. HORIZONTAL CONTROL IS BASED ON WASHINGTON STATE
PLANE COORDINATES NAD 83.
VERTICAL CONTROL BASED ON NGVD 1929 GA., SA, 47.
3. ALL DATA SHALL BE REPORTED IN NGVD 1929 DATUM.
4. A LICENSED SURVEYOR SHALL PERFORM THE WORK
DESCRIBED ON THE SHEET.
5. THE CONTRACTOR SHALL GEOSPATIALLY LOCATE
NORTHING/EASTING/ELEVATION COORDINATES FOR
INFORMATION DESCRIBED ON THIS SHEET. ALL POINT
FILES SHALL INCLUDE THE FOLLOWING INFORMATION:
PROJECT NAME, SURVEY DATES, UNITS IN U.S. SURVEY FEET,
HORIZONTAL DATUM IN NAD83 ILLINOIS WEST, AND VERTICAL
DATUM IN NGVD 29 USING GEOID 12B
6. ALL SURVEY INFORMATION SHALL BE SUBMITTED TO THE
GOVERNMENT WITHIN 30 DAYS OF THE COMPLETION OF THE
SURVEY. ALL SURVEY INFORMATION SUBMITTED SHALL
INCLUDE THE FOLLOWING INFORMATION:
PROJECT NAME
SURVEY DATES
UNITS
HORIZONTAL AND VERTICAL DATUMS
GEOID USED.
7. THERE ARE TWO MITER GATE ANCHORAGE AREAS WHICH
REQUIRE BASELINE SURVEYS. ONE ANCHORAGE AREA ON
THE LANDWALL AND ONE ON THE RIVERWALL.
8. THE PLAN VIEW SHOWN IS FOR THE LAND WALL
CONFIGURATION, THE RIVERWALL IS OPPOSITE HAND.
9. LOCATE CENTER OF HANDRAIL POSTS 20'-0" OF THE WORK
AREA.
10. LOCATE CENTER OF FALL ARREST SYSTEM POSTS AND
BEAM SPLICES WITHIN 20'-0" OF THE WORK AREA.
11. SURVEY WORK SHALL BE PERFORMED WHEN THERE
IS NO HEAD ON THE MITER GATE.
SHEET KEYNOTES
1. CONTRACTOR SHALL INSTALL NEW CONTROL POINT
OUTSIDE OF CONCRETE REMOVAL LIMITS, BUT WHICH
WILL STILL BE ACCESSIBLE DURING INSTALLATION OF
NEW COMPONENTS.
2. TOP OF WALL ELEVATION
3. RECESS ELEVATION
4. LOCATE CENTER OF ANCHORAGE PINS
5. LOCATE CENTER OF GUDGEON PIN
6. DETERMINE DISTANCE BETWEEN GUDGEON PIN AND
ANCHORAGE PIN
7. ELEVATION OF TOP ANCHORAGE CONNECTION CASTING
8. LOCATE CENTER OF SNUBBING POST
0 1' 2' 4'
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdjaa\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\VOL_I_V-111.dwg
Plot Date: 08/27/2019 2:40:12 PM
M A
R K
D E
S C
R I P
T I O
N D
A T
E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
C
O D
E
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
F Y
P
C G
R
L A
R G
E
L
O C
K
C
E N
T E
R
G
A T
E
R
E P
L A
C E
M E
N T
H I R
C
H I T
T E
N D
C K
S
S
E A
T T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S E
A T
T
S
T R
I C
T
S E
A T
T L E
W
A S
H I N
G T
S
B
R Y
N E
R
D
D
I L L O
N
B
J O
N E
S
B A
R I
B
O O
K O
U T
A N
S I
D
F
E B
R U
A R
Y
V-111
L
A N
W A
Q
O
N
T L
E
B
A
D
N D
C I N
L A
V
A G
A T
I O
N
D
E S
I G
N
C
E N
T E
R L
R D
GENERAL SHEET NOTES
SURVEY OF EXISTING WALL QUOIN AND PINTLE BASE AFTER
GATE REMOVAL BUT PRIOR TO DEMOLITION:
1. PERFORM SURVEY IN-THE-DRY WITHIN 2 DAYS AFTER
LOCALIZED COFFERDAM HAS BEEN PLACED.
2. SUBMIT SURVEY PLAN FOR GOVERNMENT APPROVAL FOR
SURVEYING LOCATION AND ALIGNMENT OF THE WALL
QUOIN AND PINTLE BASE.
3. SURVEY REQUIRED ON BOTH THE LAND WALL AND THE
RIVER WALL.
4. AFTER COMPLETION OF THE WORK SHOWN ON THIS
PAGE, SUBMIT THE INFORMATION TO GOVERNMENT
FOR REVIEW, THE GOVERNMENT WILL BE ALLOWED 2
DAYS TO REVIEW DATA AND PROVIDE THE CONTRACTOR
THE LOCATION OF THE WALL QUOINS AND PINTLE BASES.
SHEET KEYNOTES
1. LOCATION AND ELEVATION OF CENTER OF PINTLE BASE.
2. LOCATION AND ELEVATION OF 16 POINTS ON THE PINTLE
BASE.
3. LOCATION OF EMBEDDED WALL QUOIN CONTACT BLOCK
AT ONE FOOT INTERVALS ALONG THE HEIGHT OF THE
QUOIN.
A1
PLAN - WALL QUOIN AND PINTLE BASE
SCALE : 3" = 1'-0"
0 3" 6" 9"
12"
(EL. 130)
(EL. 72.5)
(EL. 72.70)
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdjaa\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\VOL_I_V-112.dwg
Plot Date: 09/05/2019 8:50:49 AM
M A
R K
D E
S C
R I P
T I O
N D
A T
E
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
C O
N T
R A
D R
A W
I N
G
C
O D
E
D E
S I G
N E
D
B
Y
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
F Y
P
C G
R
L A
R G
E
L
O C
K
C
E N
T E
R
G
A T
E
R
E P
L A
C E
M E
N T
H I R
C
H I T
T E
N D
C K
S
S
E A
T T
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
S E
A T
T
S
T R
I C
T
S E
A T
T L E
W
A S
H I N
G T
S
B
R Y
N E
R
J
A
R I A
S
B
J O
N E
S
B A
R I
B
O O
K O
U T
A N
S I
D
F
E B
R U
A R
Y
V-112
L
A N
O P
E R
A T
I N
G
M
A C
H I N
E R
Y
B A
S E
L I N
E
S
U R
V E
D
N D
C I N
L A
V
A G
A T
I O
N
D
E S
I G
N
C
E N
T E
R L
R D
A1
PLAN - MITER GATE OPERATING MACHINERY
SCALE : 3/8" = 1'-0"
0 2' 4' 6'
GENERAL SHEET NOTES
1. THE WORK DESCRIBED ON THIS SHEET IS TO ESTABLISH
THE BASELINE LOCATION OF EXISTING MITER GATE
OPERATING MACHINERY COMPONENTS. MEASUREMENTS
SHALL BE TAKEN PRIOR TO COMMENCEMENT OF ANY
WORK. THE REQUIREMENTS SHOWN MAY NOT REFLECT
ALL NECESSARY DIMENSIONS REQUIRED TO REPLACE
ALL OF THE MACHINERY COMPONENTS.
2. ALL INFORMATION SHALL BE PROVIDED IN THE NGVD 29
DATUM.
3. A LICENSED SURVEYOR SHALL PERFORM THE WORK
DESCRIBED ON THIS SHEET.
4. THE CONTRACTOR SHALL GEOSPATIALLY LOCATE
NORTHING/EASTING/ELEVATION COORDINATES
FOR INFORMATION DESCRIBED ON THIS SHEET. ALL
POINT FILES SHALL INCLUDE THE FOLLOWING
INFORMATION:
PROJECT
COORDINATE SYSTEM
ZONE
PROJECT DATUM
VERTICAL DATUM
GEOID
COORDINATE UNITS
DISTANCE UNITS
FIELD BOOK
5. ALL SURVEY INFORMATION SHALL BE SUBMITTED TO THE
GOVERNMENT WITHIN 30 DAYS OF THE COMPLETION OF
THE SURVEY. ALL SURVEY INFORMATION SUBMITTED SHALL
INCLUDE THE FOLLOWING INFORMATION:
PROJECT NAME, SURVEY DATES, UNITS, HORIZONTAL AND
VERTICAL DATUMS, AND GEOID USED.
6. THERE ARE TWO MITER GATE MACHINERY AREAS WHICH
REQUIRE BASELINE SURVEYS. ONE MACHINERY AREAS ON
THE LAND WALL AND ONE AREA ON THE RIVER WALL.
7. PLAN VIEW SHOWN IS FOR THE LAND WALL, RIVER WALL IS
OPPOSITE HAND.
8. THERE IS STEEL TREAD PLATE WHICH COVERS THIS
MACHINERY, AND NOT SHOWN FOR CLARITY.
9. KEYNOTE ITEMS 1, 5, AND 7 ARE BELOW TOP OF LOCKWALL.
SHEET KEYNOTES
1. LOCATION AND ELEVATION OF CONNECTION PIN WHEN
MITER GATE IS IN RECESS.
2. LOCATION AND ELEVATION OF CONNECTION PIN WHEN
MITER GATE IS MITERED .
3. LENGTH OF EXPOSED ROD WHEN GATE IN RECESS.
4. LENGTH OF EXPOSED ROD WHEN GATE MITERED.
5. TOP OF CYLINDER ELEVATION.
6. CONCRETE ELEVATION AT TOP OF WALL.
7. CONCRETE ELEVATION IN OPERATING MACHINERY ROOM.
2 3 4 5 6 7 8 9
F
E
D
C
B
A
File Path: C:\Users\b5ecdcak\Documents\_VaultWork\Designs\Civil Works\Lake Washington Ship Canal\Chittenden\2019 Large Lock Center Miter Gate Replacement\Drawings\VOL_I_S-001.dwg
Plot Date: 11/06/2019 3:03:01 PM
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
IS
SU
E D
AT
E:
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
D R
AW
IN
G C
O D
E:
D
ES
IG
N
ED
B
Y:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
SHEET ID
US Army Corps of Engineers ®
95% DESIGN SUBMITTAL
FY
P 2-
L
LC
G
R
LA
R G
E
LO
C K
C
EN
TE
R
G
AT
E R
EP
LA
C
EM
EN
T
H
IR
AM
M
. C H
IT
TE
N D
EN
L
O C
KS
, S
EA
TT
LE
W
A
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
SE
AT
TL
E
D
IS
TR
IC
T
SE
AT
TL
E, W
AS
H
IN
G
TO
N
S.
B
R
YN
ER
J.
A
R
IA
S
B.
J
O N
ES
BA
R
I B O
O
KO
U T
AN
SI
D
F
EB
R
U
AR
Y
S-001
EN
ER
AL
ST
R
U C
TU
R
AL
N
O
TE
MV
IN
LA
ND
N
AV
AG
AT
IO
N
DE
SIG
N
CE
NT
ER
LR
D
WRAP WELD AROUND
END OF ALL WELDED
PLATES
GENERAL STRUCTURAL NOTES CONCRETE NOTESSTRUCTURAL STEEL NOTES
ADHESIVE ANCHOR NOTES
ADHESIVE ANCHOR NOTES (cont.)
1. ALL CONCRETE CONSTRUCTION SHALL BE IN ACCORDANCE
WITH THE PROVISIONS OF THE AMERICAN CONCRETE
INSTITUTE (ACI) SPECIFICATIONS FOR STRUCTURAL CONCRETE
(ACI 301). ALL CONCRETE DESIGN PERFORMED BY THE CON-
TRACTOR SHALL BE IN ACCORDANCE WITH ACI 318.
2. WELDED WIRE REINFORCEMENT SHALL CONFORM TO ASTM
A185 OR ASTM A497. PROVIDE SHEET-TYPE WELDED WIRE
FABRIC. SHEET LAPS SHALL BE TIED AND LAPPED ON FULL
MESH SPACING.
3. PROVIDE 12" THICK JOINT FILLER MATERIAL WHERE SLABS ON
GRADE ABUT CONCRETE, MASONRY, OR STEEL VERTICAL
SURFACES.
4. ALL EMBEDDED ITEMS SHALL BE PROPERLY PLACED,
ACCURATELY POSITIONED AND MAINTAINED SECURELY IN
PLACE PRIOR TO AND DURING CONCRETE PLACEMENT.
5. ALL EXPOSED CONCRETE CORNERS SHALL BE CHAMFERED
4" UNLESS NOTED OTHERWISE.
6. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE
STRENGTH (f'c) OF 4,500 PSI AT 28 DAYS, UNLESS NOTED
OTHERWISE.
7. PROVIDE CONSTRUCTION JOINTS WHERE SHOWN ON THE
DRAWINGS. WHERE NOT SHOWN, CONSTRUCTION JOINTS
SHALL BE PLACED AT LOCATIONS LEAST LIKELY TO IMPAIR THE
INTEGRITY OF THE CONCRETE STRUCTURE. THESE ADDITIONAL
CONSTRUCTION JOINT LOCATIONS SHALL BE APPROVED BY THE
CONTRACTING OFFICER.
9. EMBEDMENT DEPTH AND ANCHOR PROJECTION
(STICK-OUT) FROM THE CONCRETE SURFACE SHALL BE
AS SHOWN ON THE DRAWING OR DETAIL FOR THE
PARTICULAR ANCHOR OR GROUP OF ANCHORS BEING
INSTALLED. ABSENT ANY INFORMATION, THE MINIMUM
EMBEDMENT DEPTH SHALL BE 1'-6" AND MINIMUM
STICK-OUT SHALL BE 6".
10. ADHESIVES SHALL BE STORED AND INSTALLED AT THE
SERVICE TEMPERATURE RANGED RECOMMENDED BY THE
MANUFACTURER.
11. ADHESIVE ANCHORS SHALL BE INSTALLED BY QUALIFIED
PERSONNEL TRAINED TO INSTALL ADHESIVE ANCHORS IN
ACCORDANCE WITH THE SPECIFICATIONS. POST-
INSTALLED ADHESIVE ANCHORS SHALL BE INSTALLED
IN ACCORDANCE WITH THE MANUFACTURER'S
PRINTED INSTALLATION INSTRUCTIONS (MPII).
12. THE CONTRACTOR SHALL PROVIDE ALL EQUIPMENT
REQUIRED TO INSTALL THE ADHESIVE ANCHOR INCLUDING, BUT
NOT LIMITED TO, DRILLS, SETTING TOOLS, CLEAN-OUT BRUSHES,
BLOW OUT BULBS, OIL-FREE COMPRESSED AIR, SHOP
VACUUMS, WRENCHES, ETC.
13. ANCHORS SHALL BE INSTALLED IN HOLES DRILLED WITH A
ROTARY IMPACT HAMMER DRILL OR ROCK DRILL.
14. ANCHOR HOLES SHALL BE THOROUGHLY CLEANED PRIOR TO
ADHESIVE INJECTION, AS REQUIRED BY THE MPII.
15. DRILLED AND CLEANED ANCHOR HOLES SHALL BE
PROTECTED FROM CONTAMINATION UNTIL THE ADHESIVE
IS INSTALLED.
16. A DRILLED ANCHOR HOLE SHALL BE RE-CLEANED ASSUMING
THE HOLE WAS JUST DRILLED, IF IN THE OPINION OF THE
ENGINEER, INSPECTOR, OR OWNER'S REPRESENTATIVE
THAT THE HOLE HAS BECOME CONTAMINATED AFTER INITIAL
CLEANING.
17. UNLESS OTHERWISE INDICATED ON THE MPII, ADHESIVE
SHALL BE DISPENSED THROUGH A TUBE OR CARTRIDGE
EXTENSION, BEGINNING AT THE MAXIMUM DEPTH OF THE
HOLE AND WITHDRAWN AS ADHESIVE IS INJECTED,
FOLLOWED BY INSERTION AND ROTATING THE ANCHOR TO THE
SPECIFIED DEPTH. WHERE NECESSARY, SPACES AROUND
ANCHORS AT THE SURFACE SHALL BE SEALED AT HORIZONTAL
TO VERTICALLY OVERHEAD LOCATIONS TO PREVENT LOSS OF
THE ADHESIVE DURING CURING.
18. ANCHORS TO BE INSTALLED IN THE ADHESIVE SHALL BE
CLEAN, OIL-FREE, AND FREE OF LOOSE RUST, PAINT, OR
OTHER COATINGS.
19. INSTALLED ADHESIVE ANCHORS SHALL BE SECURELY FIXED
IN-PLACE TO PREVENT DISPLACEMENT WHILE THE ADHESIVE
CURES. UNLESS SHOWN OTHERWISE ON THE DRAWINGS,
ANCHORS SHALL BE INSTALLED PERPENDICULAR TO
THE CONCRETE SURFACE. ANCHORS DISPLACED BEFORE
FULL ADHESIVE CURE SHALL BE CONSIDERED DAMAGED
AND REPLACED AT THE CONTRACTOR'S EXPENSE.
20. REINFORCING BARS OR ALL-THREADED BARS SHALL NOT BE
BENT AFTER BEING ADHESIVELY EMBEDDED IN
HARDENED, SOUND CONCRETE, UNLESS PERMITTED BY THE
LICENSED DESIGN PROFESSIONAL.
1. THE ADHESIVE ANCHOR SYSTEM USED FOR
POST-INSTALLED ANCHORAGE TO CONCRETE SHALL
CONFORM TO THE REQUIREMENTS OF THE MOST
RECENTLY PUBLISHED ACI 355.4, ACCEPTANCE
CRITERIA FOR QUALIFICATION OF POST-INSTALLED
ADHESIVE ANCHORS IN CONCRETE AND COMMENTARY.
2. THE ADHESIVE ANCHORS SELECTED
SHALL BE SUPPLIED AS AN ENTIRE SYSTEM.
THE SYSTEM SHALL INCLUDE, BUT IS NOT LIMITED TO,
THE NEW ADHESIVE, A CLEAN MIXING NOZZLE,
EXTENSION TUBE, A DISPENSING GUN, AND
ALL MANUFACTURER RECOMMENDED SUPPLIES FOR
PROPERLY CLEANING THE DRILLED HOLE.
3. ANCHORAGE DESIGN IS IN ACCORDANCE WITH
APPENDIX D OF ACI 318-11. FOR ADHESIVE
ANCHORS, THE FOLLOWING MINIMUM VALUES FOR
BOND STRESS WERE ASSUMED FOR THE DESIGN
USING THE ABOVE ADHESIVE ANCHOR ASSEMBLIES:
a. CRACKED CONCRETE BOND STRESS:
ԏcr = 805PSI
b. UNCRACKED CONCRETE BOND STRESS:
ԏuncr = 1670PSI
4. ALL-THREADED ROD TO BE USED IN ADHESIVE
ANCHOR ASSEMBLIES SHALL BE AS NOTED ON THE DRAWINGS.
5. REINFORCING BARS TO BE USED IN ADHESIVE ANCHORS
ASSEMBLIES SHALL CONFORM TO ASTM A615, GRADE 60.
6. NEW CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE
STRENGTH OF 2,500PSI AT THE TIME OF
ADHESIVE ANCHOR INSTALLATION.
7. CONCRETE AT THE TIME OF ADHESIVE ANCHOR
INSTALLATION SHALL HAVE A MINIMUM AGE OF
21 DAYS.
8. CONCRETE TEMPERATURE AT THE TIME OF ADHESIVE
ANCHOR INSTALLATION SHALL BE AT LEAST
50 DEGREES FAHRENHEIT.
1. STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN
ACCORDANCE WITH:
AISC 303 (2010) CODE OF STANDARD PRACTICE FOR STEEL
BUILDINGS AND BRIDGES
AISC 325 (2011) STEEL CONSTRUCTION MANUAL
AISC 326 (2009) DETAILING FOR STEEL CONSTRUCTION
2. UNLESS NOTED OTHERWISE IN THE SPECIFICATIONS, MATERIAL
SHALL MEET THE FOLLOWING REQUIREMENTS:
A. W-SHAPES: ASTM A992 Fy = 50 KSI
B. PIPE: ASTM A53 GRADE B Fy = 35 KSI
C. SHAPES/PLATES: ASTM A36 Fy = 36 KSI ASTM A572 Fy = 50 KSI ASTM A709 Fy = 50 KSI
D. ANCHOR RODS: ASTM F1554 GRADE 55 Fy = 55 KSI ASTM A449 Fy = 58 KSI
E. HIGH-STRENGTH BOLTS: ASTM F3125
F. CRES: ASTM A276 TYPE 304 Fy = 42 KSI*
(Fy IS THE MINIMUM YIELD STRENGTH) (* Fy BASED ON 0.2% OFFSET STRAIN)
3. SHOP CONNECTIONS MAY BE WELDED OR BOLTED UNLESS
SPECIFICALLY DETAILED OTHERWISE. FIELD CONNECTIONS
SHALL BE BOLTED UNLESS OTHERWISE NOTED.
4. BOLTS FOR STEEL CONNECTIONS SHALL BE 3/4" DIAMETER UNO.
ALL BOLTED CONNECTIONS NOT DETAILED SHALL BE
DESIGNATED AS BEARING-TYPE CONNECTIONS.
5. GALVANIZED HARDWARE SHALL BE COATED IN ACCORDANCE
WITH ASTM A153. GALVANIZED STEEL SHAPES SHALL BE
COATED IN ACCORDANCE WITH ASTM A123 AFTER
FABRICATION.
6. ELECTRIC WELDING SHALL CONFORM TO THE PROVISIONS OF
AWS D1.1-06, IN ACCORDANCE WITH THE CONTRACT SPECIFICATION,
USING E70XX ELECTRODES, ALL WELDS ON CORROSION RESISTING
STEEL SHALL BE MADE WITH CRES ELECTRODES.
7. WELDING SYMBOLS SHOWN ARE THOSE ADOPTED BY THE AWS
AND INDICATE ONLY SIZE AND TYPE OF WELDS REQUIRED.
DETAILED INFORMATION SHALL BE SHOWN ON THE SHOP
DRAWINGS AND SUBMITTED BY THE CONTRACTOR FOR
APPROVAL.
8. DIMENSIONS SHOWN OR CALLED FOR ARE THE FINAL
DIMENSIONS; ALLOWANCES MUST BE MADE FOR MACHINING
9. STEEL SURFACES IN CONTACT WITH MEMBERS INTENDED TO
BE SUBMERGED SHALL BE SEALED WATERTIGHT BY RUNNING
A CONTINUOUS 18" FILLET WELD ALONG ALL EDGES OF THE
CONTACT.
10. ALL BARE OR EXPOSED STEEL, WELDS, SCRATCHES, GRIND
AREAS, ETC. SHALL BE PAINTED/COATED AS SPECIFIED.
11. ALL ALUMINUM IN CONTACT WITH CONCRETE SHALL BE COATED
WITH TWO COATS OF BITUMINOUS PAINT (SSPC - PAINT 12,
CONTAINING NO ASBESTOS FIBERS) OR PRESCRIBED
TREATMENT FROM MANUFACTURER/FABRICATOR.
12. ALL WELDS THAT ARE TO BE GROUND SHALL HAVE A FINISHED
SURFACE EQUAL TO OR SMOOTHER THAN THE MILL FINISH OF
THE MATERIAL BEING WELDED, UNLESS NOTED OTHERWISE.
13. ITEMS…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .