Logistics Readiness Squadron Campus, Offutt AFB, Nebraska

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W9128F21R0026
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Y1GZ Construction Of Other Warehouse Buildings
Place of performance
Offutt AFB, Nebraska 68113, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks offers for the construction of a new consolidated warehouse facility at Logistics Readiness Squadron Campus, Offutt Air Force Base in Nebraska. The U.S. Army Corps of Engineers, Omaha District will demolish approximately 2,248 square meters of existing warehouse space and construct a new warehouse with logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading/unloading aprons. Supporting facilities such as utilities, paving, drainage and site improvements are also required. Sustainable design and construction practices per Executive Order 13423 will be integrated. Offers must be submitted by 2:00pm on September 9, 2021 and will be evaluated based on technical qualifications, past performance, and price.

This opportunity is set aside 100% for small businesses. The primary NAICS code is 237310 and PSC code is S206. The place of performance is Offutt AFB, NE. Key details include demolishing existing facilities by September 2022 and completing the new 24,197 square foot warehouse within 18 months.

Notice text

2 versions

Update #2 · Latest ·

FOR CLARIFICATION - THIS SOLICITATION IS CLOSED TO OFFERORS WHO DID NOT SUBMIT A PROPOSAL BY THE DEADLINE OF 9-SEP-2021. SUBSEQUENT AMENDMENTS ARE BEING PUBLISHED FOR TRANSPARENCY.

The project would demolish 2,248 SM (24,197 SF) of existing substandard warehouse space and other facilities in way of construction and construct a new consolidated warehouse facility. The facility would include logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading and unloading aprons. Supporting facilities include underground utilities (water, sewer, gas), electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, site development, intrusion detection systems, and site improvements. Heating and air conditioning will be provided by self-contained system.

Construction includes reinforced concrete footings, floor slab, supporting structure, and egress. Facilities require all necessary site work, utilities, mechanical, electrical, fire protection systems, back-up power and all other required support. Force protection includes reinforced exterior walls, blast-proof windows, and passive barriers. Overall project also includes the safe removal of multiple facilities. Sustainable principles, to include Life Cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive Orders.

Update #1 ·

The project would demolish 2,248 SM (24,197 SF) of existing substandard warehouse space and other facilities in way of construction and construct a new consolidated warehouse facility. The facility would include logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading and unloading aprons. Supporting facilities include underground utilities (water, sewer, gas), electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, site development, intrusion detection systems, and site improvements. Heating and air conditioning will be provided by self-contained system.

Construction includes reinforced concrete footings, floor slab, supporting structure, and egress. Facilities require all necessary site work, utilities, mechanical, electrical, fire protection systems, back-up power and all other required support. Force protection includes reinforced exterior walls, blast-proof windows, and passive barriers. Overall project also includes the safe removal of multiple facilities. Sustainable principles, to include Life Cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive Orders.

Attachments

Files attached to this notice, newest first
File Type Posted
Am_0006.pdf PDF
Am_0006-Drawings.PDF PDF
Am_0005.pdf PDF
Am_0004.pdf PDF
Am_0004 - D.pdf PDF
Am_0003.pdf PDF
Am_0003 - D .PDF PDF
OF63 LRS CAMPUS OFFUTT AFB AM 0002.PDF PDF
Am_0002.pdf PDF
Am_0001-Drawings.pdf PDF
Am_0001.pdf PDF
LRS Campus Drawings Part 1 of 2.pdf PDF
W9128F-21-R-0026_SPECS.pdf PDF
LRS Campus Drawings Part 2 of 2.pdf.pdf PDF
Show all 14

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Logistics Readiness Squadron Campus, Offutt AFB, Nebraska Award Award Notice
Logistics Readiness Squadron Campus, Offutt AFB, Nebraska This notice · Latest solicitation Solicitation
Pre-Solicitation Notice for Logistics Readiness Squadron Campus, Offutt AFB, NE Pre-Solicitation
Sources Sought- Logistics Readiness Campus, Offutt AFB, NE Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity