Logistics Readiness Squadron Campus, Offutt AFB, Nebraska
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9128F21R0026
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Offutt AFB, Nebraska 68113, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks offers for the construction of a new consolidated warehouse facility at Logistics Readiness Squadron Campus, Offutt Air Force Base in Nebraska. The U.S. Army Corps of Engineers, Omaha District will demolish approximately 2,248 square meters of existing warehouse space and construct a new warehouse with logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading/unloading aprons. Supporting facilities such as utilities, paving, drainage and site improvements are also required. Sustainable design and construction practices per Executive Order 13423 will be integrated. Offers must be submitted by 2:00pm on September 9, 2021 and will be evaluated based on technical qualifications, past performance, and price.
This opportunity is set aside 100% for small businesses. The primary NAICS code is 237310 and PSC code is S206. The place of performance is Offutt AFB, NE. Key details include demolishing existing facilities by September 2022 and completing the new 24,197 square foot warehouse within 18 months.
Notice text
2 versions
Update #2 · Latest ·
FOR CLARIFICATION - THIS SOLICITATION IS CLOSED TO OFFERORS WHO DID NOT SUBMIT A PROPOSAL BY THE DEADLINE OF 9-SEP-2021. SUBSEQUENT AMENDMENTS ARE BEING PUBLISHED FOR TRANSPARENCY.
The project would demolish 2,248 SM (24,197 SF) of existing substandard warehouse space and other facilities in way of construction and construct a new consolidated warehouse facility. The facility would include logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading and unloading aprons. Supporting facilities include underground utilities (water, sewer, gas), electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, site development, intrusion detection systems, and site improvements. Heating and air conditioning will be provided by self-contained system.
Construction includes reinforced concrete footings, floor slab, supporting structure, and egress. Facilities require all necessary site work, utilities, mechanical, electrical, fire protection systems, back-up power and all other required support. Force protection includes reinforced exterior walls, blast-proof windows, and passive barriers. Overall project also includes the safe removal of multiple facilities. Sustainable principles, to include Life Cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive Orders.
Update #1 ·
The project would demolish 2,248 SM (24,197 SF) of existing substandard warehouse space and other facilities in way of construction and construct a new consolidated warehouse facility. The facility would include logistics and administration areas, shipping and receiving operations areas, open storage areas, and loading and unloading aprons. Supporting facilities include underground utilities (water, sewer, gas), electric service, paving, sanitary sewer system, storm drainage, information systems, fire suppression systems, landscaping, site development, intrusion detection systems, and site improvements. Heating and air conditioning will be provided by self-contained system.
Construction includes reinforced concrete footings, floor slab, supporting structure, and egress. Facilities require all necessary site work, utilities, mechanical, electrical, fire protection systems, back-up power and all other required support. Force protection includes reinforced exterior walls, blast-proof windows, and passive barriers. Overall project also includes the safe removal of multiple facilities. Sustainable principles, to include Life Cycle cost effective practices, will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423, 10 USC 2802 (c), and other applicable laws and Executive Orders.
Attachments
| File | Type | Posted |
|---|---|---|
| Am_0006.pdf | ||
| Am_0006-Drawings.PDF | ||
| Am_0005.pdf | ||
| Am_0004.pdf | ||
| Am_0004 - D.pdf | ||
| Am_0003.pdf | ||
| Am_0003 - D .PDF | ||
| OF63 LRS CAMPUS OFFUTT AFB AM 0002.PDF | ||
| Am_0002.pdf | ||
| Am_0001-Drawings.pdf | ||
| Am_0001.pdf | ||
| LRS Campus Drawings Part 1 of 2.pdf | ||
| W9128F-21-R-0026_SPECS.pdf | ||
| LRS Campus Drawings Part 2 of 2.pdf.pdf |
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| Logistics Readiness Squadron Campus, Offutt AFB, Nebraska | Award Notice | |
| Logistics Readiness Squadron Campus, Offutt AFB, Nebraska | Solicitation | |
| Pre-Solicitation Notice for Logistics Readiness Squadron Campus, Offutt AFB, NE | Pre-Solicitation | |
| Sources Sought- Logistics Readiness Campus, Offutt AFB, NE | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity